Risk Assessment

Project: Bangladesh Greater Dhaka Sustainable Urban transport Project (BRT, Gazipur-Airport)

29 Dec 2022, Revision -


Risk assessment Conducted By : Lasha Mirianashvili; Mohammed Salauddin Date
01

Page
Name & Signature: 2
Number
Risk Assessment: Construction Plan for Box Girder Joints, Wing Plates and Anti-Collision Guardrail (Crush Barrier)
Residual Risk (After taking appropriate
Hazards First Hazard
No Activity Description Controls and Measures to be Taken measures)
Description of the Hazard Effects P S R P S R Result
Risk Assessment: Construction Plan for Box Girder Joints, Wing Plates and Anti-Collision Guardrails

1.MSE Wall Construction activity must be carried out as per approved method statement.
2.Trained workers to be deployed after induction training, screening & medical checkup etc.
1. Deployment of untrained / 3. ID cards will be provided to workers;
1. LTI, Personnel Injury; Fatality;
inexperienced  persons; 4. Informing hazard to associated personnel and safe work methodology to crew members;
Accident.
1 Mobilization of Manpower 2. Lack of awareness about 5 5 25 5. PTW and Pre-Start Toolbox Talks to be done before starting activities. 2 3 6 Acceptable
2. Property Damage.
construction hazards; 6. Individual ID cards will be checked at entrance gate by security and daily tool box meeting
3. Lack of Training Competency;
3. 3rd Party; Local Community. will be conducted;
7. Conduct Site Orientation induction / training for new workers;
8. Area to be barricaded and access on site to be strictly controlled.

1. Incidents caused by improperly 1. Traffic management arrangements shall be in accordance with approved Traffic Interface Plan.
managed traffic on worksite; Poor 2. Traffic signages must be in accordance with traffic management plan.
1. LTI, Injury, Road Traffic Accident.
traffic management plan. 3. Deployment of competent traffic engineer/supervisors and team on site.
2. Injury to road users / public.
2. Lack of barricading of work zone 4. Red Flag, Redi Illuminated Sticks (for night works) and megaphones to be provided for traffic crew to control and alert
2 Traffic Management 3. Property Damage. 5 5 25 2 3 6 Acceptable
and signages. traffic flow including pedestrian movement.
4. CGGC employees hit by public
3. Untrained traffic crew. 5. Secure work zone by fencing/barricading interconnected.
vehicle resulting in multiple fatality.
4. Deviation from approved traffic 6. Post appropriate safety signage's such as construction work zone , no unauthorized entry.
management plan. 7. Deployment of security persons to monitor and safeguard work zone especially during night time for unauthorized entry.

1. Permit to Work System to be implemented before starting any activity.


2. TBT & Pre Start Inspection to be done before starting any activity.
3. All employees, Scaffolders, Lifting and Equipment operators to be trained, competent and certified. Competency
Certificates to be provided on site upon request.
4. Working area to be fully closed and no unauthorized entry to be allowed.
5.Working area from below (on ground surface) to be barricaded and nobody to enter in it to avoid dropped objects hazard.
6. Security to be arrange 24/7 and avoid unauthorized entry on worksites, especially under the working activities.
1. Lack of Administrative Processes.
7. Traffic Interface Plan to be developed and implemented as per approved conditions.
2. Lack of Employees Competency &
8. Traffic Officers to control traffic flow and make sure that 3rd party (pedestrians & vehicles) to enter on worksite.
Certification.
1. LTI, Injury, Road Traffic Accident. 9. Tools to be secured and to avoid falling from height.
3. Unauthorized Entry on Worksite.
2. Injury to road users / public. 10. Scaffold to be erected by competent person and appropriate scaffold tag to me implemented as per scaffold condition.
4. Falling From Height.
3 Anchor sealing position 3. Property Damage. 5 4 20 11. No custom made scaffolds or bamboo materials are allowed to be used as a scaffold material. 3 2 6 Acceptable
5. Dropped Objects (Formwork, tools,
4. CGGC employees hit by public 12. All required employees who will need to work at height to be trained and competent.
materials, etc.).
vehicle resulting in multiple fatality. 13. Working at height activity to be done by using of safety harness, two hook lanyards, with 100% tied off.
6. Hit by Heavy Equipment.
14. All Heavy Equipment to be inspected and MOT's to be provided on site upon request.
7. Chemical Hazard caused by
15. Heavy equipment movement to be controlled by flagman and control safe movement on site.
concrete activities.
16. Flagman and Traffic Officers to ensure safe entry / exit of heavy equipment on worksite.
17. Lifting Permit / Liftin Plan to be ensured before starting any lifting activities.
18. Lifted Load to be guided by tag line.
19. Only signal man to give signals to crane operator and nobody else.
20. Signalman and crane operator to have eye contact and radio communication as well for better signal giving process.
21. Concreting works to be done with appropriate PPE.
22. Concrete leftovers to be removed from site.

- 1/3 -
Residual Risk (After taking appropriate
Hazards First Hazard
No Activity Description Controls and Measures to be Taken measures)
Description of the Hazard Effects P S R P S R Result

1. PTW, TBT & Pre Start Inspection to be done before starting any activity.
2. All employees to be trained, competent and certified. Competency Certificates to be provided on site upon request.
3. Working area to be fully closed and no unauthorized entry to be allowed.
4.Working area from below (on ground surface) to be barricaded and nobody to enter in it to avoid dropped objects hazard.
5. Security to be arrange 24/7 and avoid unauthorized entry on worksites, especially under the working activities.
6. Traffic Interface Plan to be developed and implemented as per approved conditions.
1. Unauthorized Entry on Worksite.
1. LTI, Injury, Road Traffic Accident. 7. Traffic Officers to control traffic flow and make sure that 3rd party (pedestrians & vehicles) to enter on worksite.
2. Falling From Height.
2. Injury to road users / public. 8. Tools to be secured and to avoid falling from height.
3. Dropped Objects (Formwork, tools,
Construction of Wing 3. Property Damage. 9. Scaffold to be erected by competent person and appropriate scaffold tag to me implemented as per scaffold condition.
4 materials, etc.). 5 5 25 2 2 4 Acceptable
Plate Position 4. Health Hazard caused by concrete 10. No custom made scaffolds or bamboo materials are allowed to be used as a scaffold material.
4. Hit by Heavy Equipment.
dust. 11. All required employees who will need to work at height to be trained and competent.
5. Chemical Hazard caused by
4. Evironmental Contamination. 12. Working at height activity to be done by using of safety harness, double hook lanyards, with 100% tied off.
concrete activities.
13. All Heavy Equipment to be inspected and MOT's to be provided on site upon request.
14. Heavy equipment movement to be controlled by flagman and control safe movement on site.
15. Flagman and Traffic Officers to ensure safe entry / exit of heavy equipment on worksite.
16. Concreting works to be done with appropriate PPE.
17. Concrete dust to be watered at all time.
18. Concrete leftovers to be removed from site.

1. PTW, TBT & Pre Start Inspection to be done before starting any activity.
2. All employees to be trained, competent and certified. Competency Certificates to be provided on site upon request.
3. Working area to be fully closed and no unauthorized entry to be allowed.
4.Working area from below (on ground surface) to be barricaded and nobody to enter in it to avoid dropped objects hazard.
5. Security to be arrange 24/7 and avoid unauthorized entry on worksites, especially under the working activities.
6. Traffic Interface Plan to be developed and implemented as per approved conditions.
1. Unauthorized Entry on Worksite.
1. LTI, Injury, Road Traffic Accident. 7. Traffic Officers to control traffic flow and make sure that 3rd party (pedestrians & vehicles) to enter on worksite.
2. Falling From Height.
2. Injury to road users / public. 8. Tools to be secured and to avoid falling from height.
3. Dropped Objects (Formwork, tools,
Joint Position 3. Property Damage. 9. Scaffold to be erected by competent person and appropriate scaffold tag to me implemented as per scaffold condition.
5 materials, etc.). 5 5 25 2 2 4 Acceptable
Construction 4. Health Hazard caused by concrete 10. No custom made scaffolds or bamboo materials are allowed to be used as a scaffold material.
4. Hit by Heavy Equipment.
dust. 11. All required employees who will need to work at height to be trained and competent.
5. Chemical Hazard caused by
4. Evironmental Contamination. 12. Working at height activity to be done by using of safety harness, double hook lanyards, with 100% tied off.
concrete activities.
13. All Heavy Equipment to be inspected and MOT's to be provided on site upon request.
1.
14.Activities to be carried
Heavy equipment out as per
movement approved
to be method
controlled statement
by flagman andand Inspection
control and Teston
safe movement Plan(ITP)
site.
2.
15.PTW,
Flagman TBT and
& Pre StartOfficers
Traffic Inspection to be done
to ensure safe before
entry / starting any activity.
exit of heavy equipment on worksite.
3. All employees to be trained, competent and
16. Concreting works to be done with appropriate PPE. certified. Competency Certificates to be provided on site upon request.
Working
17. Concrete areadust
to betofully closed and
be watered at allnotime.
unauthorized entry to be allowed.
4. Working area from below (on ground
18. Concrete leftovers to be removed from site. surface) to be barricaded and nobody to enter in it to avoid dropped objects
hazard.
5. Traffic controller to control traffic flow and make sure that 3rd party (pedestrians & vehicles) is prevented to enter
worksite.
6. Tools to be secured and to avoid falling from height.
7. All required employees who will need to work at height to be trained and competent.
8. All Heavy Equipment to be inspected and MOT's to be provided on site upon request.
9. Heavy equipment movement to be controlled by flagman and control safe movement on site.
10. Flagman and Traffic controller rs to ensure safe entry / exit of heavy equipment on worksite.
11. Concreting works to be done with appropriate PPE.
12. provide traffic signages as per approved TIP and other safety precautionary signages such as No Entry / falling object
hazard /lifting operation ongoing signages posted below
13. Ensure traffic controllers to control traffic /unauthorized entry into danger zone/barricaded area.
1. Unauthorized Entry on Worksite.
1. LTI, Injury, Road Traffic Accident. 14. Working platform attached to metal formwork welded properly, is platform decked fully and green net provided to
2. Falling From Height.
2. Injury to road users / public. prevent material/tool falling down.
Construction of Anti- 3. Dropped Objects (Formwork, tools,
3. Property Damage. 15. Engaged operatives engaged in formwork installation /concreting works work (work at height trained) and know how to
6 Collision Guardrail (crush materials, etc.). 5 5 25 2 2 4 Acceptable
4. Health Hazard caused by concrete use full body harness.
barrier) 4. Hit by Heavy Equipment.
dust. 16. Provision of 100% tie ( eye bolt, lifeline where applicable ,other suitable anchorage point )provided for operative
5. Chemical Hazard caused by
4. Evironmental Contamination. engaged in formwork shuttering / concrete pouring /de-shuttering( operatives going from bridge deck to outside
concrete activities.
fabricated work platform and while working on the fabricated work platform for outside shutter fixing , concreting , de-
shuttering).
17. all lifting devices /lifting gears/pulley free of any defects/damaged and visual inspected prior to use. Lifting operations
to be carried out under competent lifting supervisor/rigger. Lifting permit system to be followed.
18. Secure (tyre by choking/wooden wedge) to prevent unwanted movement.
19. Project approved lifting procedure and work at height procedure to be strictly complied during activities.
20. Ensure Safe Working Load (SWL) for lifting equipment and fabricated working metal platform marked, indicated/
supported by documents
21. Ensure all construction equipment fitness /integrity through third Party certificate/pre-use checks.
22. While lifting and positioning of outer shutter, operatives must not ride on the fabricated metal platform.
23. Ensure safe rigging/slinging method followed while installation/removal of formwork.
24. working platform shall not be over loaded with men and material ( exceeding the SWL of fabricated work platform )
25. hand tool/ tie rod/ properly secured by rope/other measures to prevent tool /material falling down
26. toe board provided to prevent loose items falling down if there is there material falling hazard /risk.
27. Safety checklist for crush barrier works shall be carried out prior to activity and when checklist is satisfactory, work - 2/3 -
must proceed.
Residual Risk (After taking appropriate
Hazards First Hazard
No Activity Description Controls and Measures to be Taken measures)
Description of the Hazard Effects P S R P S R Result

1. Sufficient Illumination to be provided on worksites during night works (300 Lux). Light towers to be in good condition.
1. Insufficient illumination during
2. All pathways and stored materials to be barricaded and highlighted properly to avoid trips, slip and falling hazard.
working at night. 1. LTI, Injury
General Safety 3. Traffic Officers to be equipped with illuminated sticks, flash lights and bullhorns to control heave movement during night
2. Heavy Traffic during night work. 2. Property Damage.
7 Requirements During 5 4 20 time. 2 3 6 Acceptable
3. Unauthorized entry on worksites. 3. 3rd party injury, property damage.
Night Works 4. Security to be provided 24/7 and to be responsible for unauthorized entry caused by 3rd party persons on site.
4. Lack of emergency preparedness 4. Trip, Slip, Fall.
5. Emergency contact numbers to be posted on worksite safety information board.
and communication.
6. ERP to be communicated with employees and risk for night works to be informed.

1. Working during Heavy Wind, Rain,


Thunder.
1. All stored materials to be properly secured in adverse weather to avoid flying and washed out particulars.
2. 3rd party injury / Property Damage 1. LTI, Injury
2. All electrical tools to be isolated from rain and surface water if work activities are ongoing in rainy weather.
Working in Adverse during heavy wind. 2. Property Damage.
8 5 4 20 3. Drainage channels to be in clean condition to be capable to discharge surface rain water. 3 2 6
Weather 3. Electrocution caused by hand tools 3. 3. 3rd party injury, property damage.
4. Additional control measures to be implemented during worksite flooding.
during working in rainy weather; 4. Trip, Slip, Fall.
5. Discharge Pumps to be available on site during seasonal rain period.
4. Surface water increase on
worksites; Flooding.

Residual
First Risk
23.13 Risk 5.25 Acceptable
Average
Average

- 3/3 -