Professional Documents
Culture Documents
Ipl Rules: Independent Capable Maintained Audited
Ipl Rules: Independent Capable Maintained Audited
Ipl Rules: Independent Capable Maintained Audited
1. 2. 3. 4. 5.
Determine which Ensure human Develop a trouble- Perform initial training Validate human
parameters limits response action shooting guide on each human response
should have human meets the definition (general steps for response IPL and do success rates are
response, and why of a Human the operators to one timed drill of each high enough
human response is Response IPL take) for each Human Response IPL
best response per operator per year
Consensus
PFD = 1
of Op. and
NO (No Human IPL)
Maint staff YES
YES
DT+RT > HUMAN FACTORS
MART MULTIPLIER
# Criteria True/False
YES Is Test/Drill NO
1 Based on consensus of expert data being
opinion, the operator has less collected?
than 15 minutes to successfully
detect, diagnose, and perform YE 9
NO Use Generic Data +
the required action SITE SPECIFIC S 𝑷𝐻𝑢𝑚𝑎𝑛 = 𝑯𝑬𝑩 × ෑ 𝑯𝑭𝑴𝑖 × 𝑷𝑭
Predicted Data 𝑖=1
DATA
2 Operator response is required
without explicit criteria and Is site data
response instructions YES available for
non-drill (actual)
3 Critical or emergency responses HUMAN ERROR PRACTICE FACTOR
responses? NO BASELINE 0.6 2
involve multiple people PFD < 0.1 250 𝑃𝑃𝑌
Lowest baseline error 𝑃𝐹 = + 0,4 ×
NO 𝑃𝑃𝑌 1000
rate possible: 0.0008
4 Response actions provide no PPY: Number of
feedback that they are effective YES Practices per year