This document is a boom usage report from July 2022 for the KOYA & CO CONSTRUCTION LIMITED Madurai WS Project Package 3. It details 27 entries listing the date, location, structure type, concrete grade, and quantity in cubic meters of concrete poured at each site over the reported period. A total of 866 cubic meters of various grade concretes were used across columns, beams, slabs, footings and sidewalls at 16 different locations during July 2022.
This document is a boom usage report from July 2022 for the KOYA & CO CONSTRUCTION LIMITED Madurai WS Project Package 3. It details 27 entries listing the date, location, structure type, concrete grade, and quantity in cubic meters of concrete poured at each site over the reported period. A total of 866 cubic meters of various grade concretes were used across columns, beams, slabs, footings and sidewalls at 16 different locations during July 2022.
This document is a boom usage report from July 2022 for the KOYA & CO CONSTRUCTION LIMITED Madurai WS Project Package 3. It details 27 entries listing the date, location, structure type, concrete grade, and quantity in cubic meters of concrete poured at each site over the reported period. A total of 866 cubic meters of various grade concretes were used across columns, beams, slabs, footings and sidewalls at 16 different locations during July 2022.
This document is a boom usage report from July 2022 for the KOYA & CO CONSTRUCTION LIMITED Madurai WS Project Package 3. It details 27 entries listing the date, location, structure type, concrete grade, and quantity in cubic meters of concrete poured at each site over the reported period. A total of 866 cubic meters of various grade concretes were used across columns, beams, slabs, footings and sidewalls at 16 different locations during July 2022.