Marc and Jenssen Industrial Corporation
Marc and Jenssen Industrial Corporation
PROJECT:
DATE:
PROJECT DURATION:
MANPOWER:
UNIT COST
ITEM PARTICULAR UNIT QTY
MATERIAL
I. GENERAL REQUIREMENTS
1 Mobilization/Transportation lot 3 1500
2 Temporary Facilities lot 1
3 Safety requierments, PPE lot 1
4 Permits lot 1
5 As built plans lot 1
7 Site Supervision lot 1
8 COVID/Tests lot 1
RUBBER INSULATION
Rubber Insulation 1/4 x 3/4'' thickness x 1.83 M pc 85.00
Rubber Insulation 3/8 x 3/4'' thickness x 1.83 M pc 20 96.00
Rubber Insulation 1/2 x 3/4'' thickness x 1.83 M pc 20 104.00
2
Rubber Insulation 5/8 x 3/4'' thickness x 1.83 M pc 20 115.00
Rubber Insulation 3/4 x 3/4'' thickness x 1.83 M pc 128.00
ELECTRICAL WORKS
Royal cord #14AWG 4C (FCU to CDU) m 20 160.00
Royal cord #10AWG 3C (CDU to CB) m 20 140.00
3 CIRCUIT BREAKER pc 3 450.00
NEMA ENCLOSURE pc 3 400.00
FLEXIBLE CONDUIT 1/2 m 40 11.50
Consumables: PE Tape, Refrigerant, electrical
tape, primer paint, nitrogen, welding rod, silver
rod, soldering flux, PPEs, other consumables to
complete the system, testing and commissioning
- - -
- - -
SUB TOTAL -
- 34.40 - - 132.31
2,700.00 54.00 1,080.00 3,780.00 207.69
3,660.00 73.20 1,464.00 5,124.00 281.54
4,600.00 92.00 1,840.00 6,440.00 353.85
- 113.20 - - 435.38
- SUB TOTAL 15,344.00 -
- -
- 34.00 - - 130.77
1,920.00 38.40 768.00 2,688.00 147.69
2,080.00 41.60 832.00 2,912.00 160.00
2,300.00 46.00 920.00 3,220.00 176.92
- 51.20 - - 196.92
SUB TOTAL 8,820.00
- 400.00 - - 1,538.46
SUB TOTAL -
Total Amount at
TOTAL MATERIAL TOTAL LABOR
Cost (Vat Inc)
- - -
- - -
SUB TOTAL -
- 46.31 - -
4,153.85 72.69 1,453.85 5,607.69
5,630.77 98.54 1,970.77 7,601.54
7,076.92 123.85 2,476.92 9,553.85
- 152.38 - -
- - SUB TOTAL 22,763.08
- -
- 45.77 - -
2,953.85 51.69 1,033.85 3,987.69
3,200.00 56.00 1,120.00 4,320.00
3,538.46 61.92 1,238.46 4,776.92
- 68.92 - -
SUB TOTAL 13,084.62
-
4,923.08 86.15 1,723.08 6,646.15
4,307.69 75.38 1,507.69 5,815.38
2,076.92 242.31 726.92 2,803.85
1,846.15 215.38 646.15 2,492.31
707.69 6.19 247.69 955.38
SUB TOTAL 18,713.08
1,153.85 80.77 403.85 1,557.69
384.62 26.92 134.62 519.23
3,461.54 403.85 1,211.54 4,673.08
923.08 3,230.77 323.08 1,246.15
1,076.92 188.46 376.92 1,453.85
1,692.31 592.31 592.31 2,284.62
1,846.15 80.77 646.15 2,492.31
276.92 8.08 96.92 373.85
923.08 161.54 323.08 1,246.15
192.31 13.46 67.31 259.62
307.69 10.77 107.69 415.38
1,230.77 430.77 430.77 1,661.54
69.23 24.23 24.23 93.46
1,846.15 323.08 646.15 2,492.31
246.15 86.15 86.15 332.31
180.00 2.10 63.00 243.00
1,384.62 48.46 484.62 1,869.23
1,384.62 48.46 484.62 1,869.23
- 1,884.62 - -
SUB TOTAL 25,083.00
- 538.46 - -
SUB TOTAL -
Discount
₱ 29,004.12 33%
₱ 29,004.12 33%