Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

TBT / PRODUCTIVITY TOOL 

(East)

                               General

1. Region *

East

2. State *

Assam

Bihar

Jharkhand

Kolkata

NorthEast

Odisha

West Bengal

3. City Code *

TNSK 

4. JC SAP ID *

I-AS-TNSK-JCO-0001 
5. FSA ID *
 fill like "ABCD1234 "

TNSK0104

6. Role *

Executive Field Engineering 

                                   Tool Box Talk

7. TBT *

Yes

No

NA

8. Activity/Topic
*

Aerial Cabling

9. Total Team Member *

6 

10. Partner Name *

Power HF
11. Supervisor Name *

Muktar Hussain

12. Splicer Name *

NA

13. Labour Mate Name *

NA

14. Machine Operator *

15. Topic Discussed


*

Work At Height

16. Work Permit *

Yes

No

NA
17. Proper Barricading *

Yes

No

NA

18. Caution board *

Yes

No

NA

19. Mandatory PPEs *

Yes

No

NA

20. Full body safety harness *

Yes

No

NA
21. Non-conductive Ladder *

Yes

No

NA

22. Potable Drinking Water *

Yes

No

NA

23. First Aid Box(With all contents) *

Yes

No

NA

24. Fire Extinguisher(with TAG) *

Yes

No

NA
25. Emergency contacts *

Yes

No

NA

                  Survey / STR Installation / Transmedia

26. FSA Survey (F&D) - (FSA ID) *

NA

27. 96F Survey (Link ID) - (Link ID) *

NA

28. MDU Survey (Small and Large) - Building Id *

NA

29. Enterprise Survey -ENT DESIGN RELEASE FOR B2O ORDER *

NA

30. Pole Installation (Nos) *

31. MH Installation (Nos) *

0
32. Clamp Installation (Nos) *

33. Accessories Installation (Nos) *

34. 12F/48F Laying (Mts) *

   ODN-INST SDU / Augmentation / HOTO And RFS

35. S1 (Nos) *

36. S2 (Nos) *

37. OTB (Nos) *

38. FDC (Nos) *

0
39. JC (Nos) *

40. FDP (Nos) *

41. Augmentation S2 (Nos) *

42. OTDR/LSPM (48F) POWER LEVEL *

43. OTDR/LSPM (48F) LENGTH *

44. HP Constructed (Nos) *

45. HRFS (Nos) *

              IBD(HOMES/ENTERPRISE)  / 96F
46. Building Id *

47. Horizontal Work-T&D (Mts) *

48. Horizontal Work-Wall Clamping (Nos) *

49. Horizontal Work-Restoration (Mts) *

50. Vertical Work - ODN Installation (FAT) (Nos) *

51. Vertical Work - ODN Installation (FDC/JC) (Nos) *

52. Vertical Work—ODN Installation (S1) (Nos) *

53. Vertical Work - ODN Instalaltion (S2) (Nos) *

0
54. Vertical Work-Riser Cable Laying (Mts) *

55. 96F New Cable Laying (Mts) *

56. 96F Rework on Existing Cable (Mts) *

57. 96F HOTO (Mts) *

                                      Others

58. Attachment (Non-anonymous question  ) *

 IMG-20221222-WA0011.jpg 

 IMG-20221222-WA0012.jpg 

 IMG_20221222_145052.jpg 

Go back to thank you page

This content is created by the owner of the form. The data you submit will be sent to the form owner. Microsoft is not responsible
for the privacy or security practices of its customers, including those of this form owner. Never give out your password.

Powered by Microsoft Forms | Privacy and cookies | Terms of use

You might also like