Professional Documents
Culture Documents
Shop Drawing of W44 Curtainwall For Pmu 07262022
Shop Drawing of W44 Curtainwall For Pmu 07262022
SHOP DRAWING
OF
W44 CURTAIN WALL - PMU
JULY26, 2022
FORMALUM
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
7 7
DT 4 DT 4
3 4
DT-2 DT-2
11 10
DT 7 DT 6
1 2 5
DT-1 DT-1 DT-3
12
DT 7
9
DT 6
8 8
DT 5 DT 5
W-44
1 PARTIAL ELEVATION W-44 W-44
A1 SCALE: 1:40 MTS. 3 SECTION 4 SECTION
SCALE: 1:40 MTS. SCALE: 1:40 MTS.
A1 A1
CHAMBER
W-44
1 PARTIAL PLAN
SCALE: 1:40 MTS.
A1
OWNER: PROJECT TITLE AND LOCATION : REVISIONS DATE PREPARED BY : FORMALUM SHEET CONTENTS SHEET NO.
APPROVED BY:
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
TELEPHONE + ( 63 ) 932 - 8885909 / 917 - 4755503 10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
Asiatown I.T Park, Cebu City, Cebu Philippines DATE : 26JUL2022
Cebu City, Philippines
I-BEAM (PART OF CHAMBER BY OTHERS)
INSIDE PART OF CHAMBER BY
OTHERS
VARIES
VARIES
200
ALUM. PERIMETER
FRAME ALUMINUM MULLION
99
99
ALUMINUM SASH
FRAME
50
227
44
ALUMINUM MULLION
120
128
ALUM. PERIMETER #12X25MM L.
76
143
FRAME SST. PANHEAD SCREW
276
STEEL CHANNEL ALUMINUM SASH
68
68
226
(PART OF CHAMBER BY OTHERS) FRAME
3 3
76
SST. PANHEAD SCREW 8MM THK. DOUBLE 8MM THK. FORD BLUE
ADHESIVE TAPE LOW-E TEMPERED GLASS
206
206
200
200
STRUCTURAL SEALANT ALUMINUM COVER
8
3 3 #8X12MM L. ALUMINUM PRESSURE
SST. PANHEAD SCREW PLATE
8MM THK. FORD BLUE
LOW-E TEMPERED GLASS EXTRUDED ALUMINUM
SILICONE SEALANT 8MM THK. DOUBLE VERTICAL FINS
WITH BACKER ROD ADHESIVE TAPE
STRUCTURAL SEALANT 100
#8X12MM L.
SST. PANHEAD SCREW
EXTRUDED ALUMINUM
VERTICAL FINS
25 100
OWNER: PROJECT TITLE AND LOCATION : REVISIONS DATE PREPARED BY : FORMALUM SHEET CONTENTS SHEET NO.
APPROVED BY:
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
TELEPHONE + ( 63 ) 932 - 8885909 / 917 - 4755503 10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
Asiatown I.T Park, Cebu City, Cebu Philippines DATE : 26JUL2022
Cebu City, Philippines
2-NOS/BRACKET
M16X180MM SS304
THROUGH BOLT I-BEAM (PART OF CHAMBER BY OTHERS)
ALUMINUM MULLION
I-BEAM 12MM THK.
(PART OF CHAMBER BY STEEL PLATE WELDED
OTHERS) ON I-BEAM
200
INSIDE
12MM THK.
400 STEEL PLATE WELDED ON
I-BEAM
VARIES
50
179°
ALUMINUM MULLION
99
#12X50MM L.
SST. PANHEAD SCREW
100
#12X50MM L.
SST. PANHEAD SCREW
278
227
STEEL CHANNEL
228
(PART OF CHAMBER BY OTHERS)
120
120
ALUMINUM GLASS BEAD
68
3 3
8
OUTSIDE
EPDM GASKET OUTSIDE 3 3
1MM THK. POWDERCOATED
GALVANIZED METAL SHEET BACKPAN
1MM THK. POWDERCOATED
50MM THK. 50KG/CU.M. ROCKWOOL GALVANIZED METAL SHEET BACKPAN
SILICONE SEALANT
INSULATION W/ ALUM. FOIL AT THE BACK
206
OWNER: PROJECT TITLE AND LOCATION : REVISIONS DATE PREPARED BY : FORMALUM SHEET CONTENTS SHEET NO.
APPROVED BY:
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
TELEPHONE + ( 63 ) 932 - 8885909 / 917 - 4755503 10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
Asiatown I.T Park, Cebu City, Cebu Philippines DATE : 26JUL2022
Cebu City, Philippines
I-BEAM I-BEAM (PART OF CHAMBER BY OTHERS)
(PART OF CHAMBER BY
OTHERS) INSIDE
INSIDE
ALUMINUM MULLION
200
VARIES
179°
99
#12X50MM L.
SST. PANHEAD SCREW
50
227
ALUMINUM MULLION
100
120
#12X50MM L.
SST. PANHEAD SCREW
278
STEEL CHANNEL
ALUMINUM GLASS BEAD
(PART OF CHAMBER BY OTHERS)
228
68
3 3
OUTSIDE
120
EPDM GASKET
8MM THK. FORD BLUE
LOW-E TEMPERED GLASS
ALUMINUM GLASS BEAD
ALUMINUM COVER
206
8
200
SILICONE SEALANT
WITH BACKER ROD
100 25
OWNER: PROJECT TITLE AND LOCATION : REVISIONS DATE PREPARED BY : FORMALUM SHEET CONTENTS SHEET NO.
APPROVED BY:
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
TELEPHONE + ( 63 ) 932 - 8885909 / 917 - 4755503 10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
Asiatown I.T Park, Cebu City, Cebu Philippines DATE : 26JUL2022
Cebu City, Philippines
STEEL CHANNEL (PART OF CHAMBER BY OTHERS)
20
ALUMINUM COVER CAP SPIGOT
100
ALUMINUM GLASS BEAD
25X25X2MM THK. 200MM L.
ALUMINUM ANGULAR @ EVERY
400MM C-C SPACING
25X25X2MM THK. ALUMINUM ANGULAR
(CONTINUOUS)
2-NOS/BRACKET
M16X180MM
448
SS304 THROUGH BOLT
ALUMINUM TRANSOM
150
EXTRUDED ALUMINUM
VERTICAL FINS
12MM THK.
STEEL PLATE WELDED
ON I-BEAM
8MM THK. FORD BLUE
LOW-E TEMPERED GLASS
I-BEAM (PART OF
CHAMBER BY OTHERS)
200
50MM THK. 50KG/CU.M. ROCKWOOL
INSULATION W/ ALUM. FOIL AT THE BACK
8 6 24 190
200 5 228 50 4-NOS/BRACKET M16X75MM GRADE
SS304 THROUGH BOLT
10MM THK.
FABRICATED TEEL BRACKET
ZINC CHROMATE FINISH
7 SECTION DETAIL
DT-4 SCALE: 1:4 MTS.
OWNER: PROJECT TITLE AND LOCATION : REVISIONS DATE PREPARED BY : FORMALUM SHEET CONTENTS SHEET NO.
APPROVED BY:
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
TELEPHONE + ( 63 ) 932 - 8885909 / 917 - 4755503 10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
Asiatown I.T Park, Cebu City, Cebu Philippines DATE : 26JUL2022
Cebu City, Philippines
200 5 228
128 99
ALUMINUM MULLION
EXTRUDED ALUMINUM
OWNER:
39
SPIGOT
22
100
100
39
25X25X2MM THK. 200MM L.
ALUMINUM ANGULAR @ EVERY
400MM C-C SPACING
25X25X2MM THK.
ALUMINUM ANGULAR
(CONTINUOUS)
2-NOS/BRACKET
M16X180MM
ALUMINUM TRANSOM
10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
SS304 THROUGH BOLT
I-BEAM (PART OF
CHAMBER BY OTHERS)
678
CONDOMINIUM W/ BASEMENT
Asiatown I.T Park, Cebu City, Cebu Philippines
INSULATION W/ ALUM. FOIL AT THE BACK
150
REVISIONS
SILICONE SEALANT
DATE
DATE
:
APPROVED BY:
SILICONE SEALANT
WITH BACKER ROD
200
26JUL2022
CHECKED BY : FORMALUM
PREPARED BY : FORMALUM
SHEET CONTENTS
128 100
200 5 228 50
SHEET NO.
8 SECTION DETAIL
DT-5 SCALE: 1:4 MTS.
200 5 228 200 5 228
8 120 99 8 120 100
INSIDE INSIDE
EXTRUDED ALUMINUM 1MM THK. POWDERCOATED
VERTICAL FINS GALVANIZED METAL SHEET BACKPAN
50MM THK. 50KG/CU.M. ROCKWOOL
INSULATION W/ ALUM. FOIL AT THE
BACK 25X25X2MM THK. 200MM L.
8MM THK. FORD BLUE ALUMINUM ANGULAR @
LOW-E TEMPERED GLASS 25X25X2MM THK. ALUMINUM EVERY 400MM C-C SPACING
ANGULAR (CONTINUOUS)
73 49 6
39
39
ADHESIVE TAPE
STRUCTURAL SEALANT
100
100
22
22
39
8MM THK. DOUBLE
ADHESIVE TAPE
ALUMINUM TRANSOM
ALUMINUM TRANSOM
OUTSIDE OUTSIDE
OWNER: PROJECT TITLE AND LOCATION : REVISIONS DATE PREPARED BY : FORMALUM SHEET CONTENTS SHEET NO.
APPROVED BY:
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
TELEPHONE + ( 63 ) 932 - 8885909 / 917 - 4755503 10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
Asiatown I.T Park, Cebu City, Cebu Philippines DATE : 26JUL2022
Cebu City, Philippines
5
200 5 228 200 228
8 120 99 8 120 99
INSIDE
44
73 49 6
8MM THK. DOUBLE
79
8MM THK. DOUBLE ADHESIVE TAPE ADHESIVE TAPE
39
100
100
22
27
EPDM GASKET
EPDM GASKET
39
STRUCTURAL SEALANT ALUMINUM TRANSOM
75
OUTSIDE
8 76 45
200 5 228
OWNER: PROJECT TITLE AND LOCATION : REVISIONS DATE PREPARED BY : FORMALUM SHEET CONTENTS SHEET NO.
APPROVED BY:
120 MINDANAO AVENUE, BRGY. BAHAY TORO, PROJECT 6, QUEZON CITY
TELEPHONE + ( 63 ) 932 - 8885909 / 917 - 4755503 10th Floor, Park Centrale Bldg., Cebu I.T Park, Apas, Cebu City
Asiatown I.T Park, Cebu City, Cebu Philippines DATE : 26JUL2022
Cebu City, Philippines