Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

+9.00m ROOF APEX +9.

00m ROOF APEX B


+8.70m TOP OF THE BEAM +8.70m TOP OF THE BEAM

F F F F F F F F

STV SINK
F
F F F F

F F F
+6.10 THIRD FLR FINISH LINE +6.10 THIRD FLR FINISH LINE
F F F F
F F A
F F F F F F

F F F F
REF

F F
+3.10 SECOND FLR FINISH LINE +3.10 SECOND FLR FINISH LINE

PLAN

+.10 GROUND FLR FINISH LINE +.10 GROUND FLR FINISH LINE
+.00 STREET CURVE LINE +.00 STREET CURVE LINE PLAN

FRONT VIEW ELEVATION LEFT SIDE VIEW ELEVATION

+9.00m ROOF APEX +9.00m ROOF APEX


+8.70m TOP OF THE BEAM +8.70m TOP OF THE BEAM

F F F F

+6.10 THIRD FLR FINISH LINE +6.10 THIRD FLR FINISH LINE
F F F F

F F F F

SECTION A
+3.10 SECOND FLR FINISH LINE +3.10 SECOND FLR FINISH LINE

+.10 GROUND FLR FINISH LINE +.10 GROUND FLR FINISH LINE
+.00 STREET CURVE LINE +.00 STREET CURVE LINE

RIGHT SIDE VIEW ELEVATION REAR VIEW ELEVATION

TH
CB SHO

WC
A
SECTION B
POWDER RM W/BATH

PLAN KITCHEN DETAIL

POWDER ROOM W/ BATH DETAILS


SECTION A SECTION B

ARCHITECT: PRC NO.: 0038232 DATE: 06/23/2022 RA 54 PD 49 DRAWN BY: BGB PROJECT TITLE: APPROVED BY: SHEET CONTENT: SHEET NO.
1. THESE DRAWINGS ACTING AS AN
PTR NO.: 0062302 DATE: 01/04/2021 INSTRUMENT OF SERVICE ARE THE DESIGN BY: JLMR

AR. JULIUS LENDL M. RUIZ TIN: 500-285-963-000 LOC: GENERAL TRIAS


PROPERTY OF ARCHITECT AND
MUST BE RETURNED TO HIM/HER
APPROVED BY:
PROPOSED WATER STATION MRS. VIRGIE RESOSO A2
Interior Design Planning Consultancy Project Management
WHEN NO LONGER REQUIRED FOR
USE IN CONSTRUCTION. AS SHOWN 6
B13 L3 ELLISTON PLACE, BRGY PASONG CAMACHILE II, CITY OF GENERAL TRIAS, CAVITE, PHILIPPINES 4107
2. THESE MUST NOT BE CHECKED BY: LOCATION
M +639165372473 /+639496544091 E juliuslendlruiz@gmail.com DUPLICATED OR COPIED WITHOUT
THE ARCHITECT'S PERMISSION. BLK. 24 LOT1,PCS-04-012413, BRGY. SAN ANTONIO, MUN. OF NOVELETA, OWNER ARCHITECTURAL
DATE: 2021-03-03 PROVINCE OF CAVITE

You might also like