Professional Documents
Culture Documents
Office of The Secretary: /?J Olo - Q.: (02.0
Office of The Secretary: /?J Olo - Q.: (02.0
J DrIN\\:
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Olo . ~ q. :(02.0
OFFICE OF THE SECRETARY
Manila
NO. 55 )
)
DESIGN, DETAILED ENGINEERING
DESIGN, "AS-STAKED", REVISED,
Series of 2020dt (,12'11'10'2.0) AND "AS-BUILT" PLANS FOR
HIGHWAY, BRIDGE AND WATER
PROJECTS
To further improve the quality and for clearer and readable project plans, the following
guidelines shall be observed by all concerned offices of this Department in the preparation of
Conceptual Design, Detailed Engineering Design (DED), "As-Staked", Revised and "As-Built"
plans for highway, bridge and water projects:
1. All sheets in the set of Conceptual Design, DED, "As-Staked", Revised and "As-Built" Plans
for Highway, Bridge, Water Engineering and other related projects shall be uniform and
of one standard A-2 size (420mm x 594mm) mylar paper.
2. The scale to be used for various parts of the design plans shall be as follows:
a. Plan 1:700;
b. Profile 1:70;
c. Cross-sections (roads) 1: 100 (horizontal and vertical);
d. Cross-sections - Appropriate scale depending on the width of
(river/channel) the river/channel, and height of
embankment/excavation; and
e. Structural details, tables, notations, etc., shall vary depending on the scale and text
fonts prescribed in the latest DGCS edition and/or the designer's discretion provided
that each part shall be presented clearly and readable when printed in A-2 size
paper.
3. Draftsmanship shall be of professional quality. All plans shall be printed and drafted using
computer-aided design (CAD) software.
4. The meaning and intent of the provisions and/or specifications under the General Notes
shall be made clear and specific and shall leave no room for misinterpretations that may
lead to Variation Orders later on.
5. The title block for all sheets shall be made an integral part of the sheet of plan and not
merely patched-up therein. Cover sheets and title blocks shall vary depending on the
preparing and approving office. Formats for cover sheets and title blocks are as presented
in the following annexes:
• Cover Sheets:
Annexes "A-1" to "A-16" Conceptual Design Plan
Annexes "B-1" to "B-16" Detailed Engineering Design Plans
Annexes "C-l" to "C-6" "As-Staked" Plans
Annexes "D-1" to "D-11" Revised Plans
D.O. No. -I Series of 2019
Revised Guidelines in the Preparation of Conceptual
Design, Detailed Engineering Design, "As-Staked", Revised,
and "As-Built" Plans for Highway, Bridge and Water Projects
Page 2 of 2
• 1itle/Signature Blocks:
Annexes "F-1" to "F-4" Conceptual Design Plan
Annexes "G-1" to "G-4" Detailed Engineering Design Plans
Annexes "H-1" to "H-2" "As-Staked" Plans
Annexes "1-1" to "1-3" Revised Plans
Annexes "J-1" to "J-2" "As-Built" Plans
NOTE: All dimensions to be shown are in millimeters.
6. For Conceptual and DED plans prepared by the Design Consultants and "As-Staked",
Revised or "As-Built" Plans checked/reviewed by the Construction Supervision Consultants,
all sheets including the cover page shall be provided with a liability waiver duly signed by
their Project Manager. Similarly, for Design and Build Projects, all sheets of plan including
cover page shall be provided with liability waiver, as indicated in annexes "A-12" to "A-16"
and annexes "B-12" to "B-16" duly signed by the Contractor's Project Manager. The waiver
shall also be made an integral part of all sheets and not merely patched-up. Format of the
liability waivers shall be as presented in annexes "K-1" to "K-6".
7. All plans to be approved by the District Engineering Offices (DEO's) and Regional Offices
(RO's), except for "As-Built" plans, shall be prepared or reviewed by the Chief of the
Planning and Design Section/Division.
8. All sheets of the set of plan shall be neat, clean and without any crossed-out or voided
portion therein. Plans with corrections made by reviewing offiCials/offices shall be returned
to the designing office for correction or replacement.
9. The text style shall be Arial for all parts of the plan. Text height may vary depending on
the designer's desired size as long as all words are maintained legible. However, standard
text heights for cover sheets and title blocks shall be as illustrated in annexes "L -1 to L-
5".
Soft/electronic copy (in editable CAD file) of said "Annexes" and example drawing sheets can
be downloaded from DPWH (Bureau of Design) intranet.
This Order supersedes Department Order 77, Series of 2018 and shall take effect immediately.
~v--::=
Secretary
Departrrent of Public Works and Highways
Office of the Secretary
IAnnex"A - 1"1
.,
•...
Q. Style-Ariaf )
.,
•...
o C.Y. <YEAR> PROJECT
.,
Q.
H-6.4Omm ( Text~'6.4Omm
Q.
:5
.•..
.,
(;
E E
~a <SECTION> ~o
E E
E
o
l')
<LOCATION> E
00
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
I SlyIe'Arial )
H=3.0mm ( TextHeight· 3.00mm
H-4.40mm
Style = Arial Bold
( TextHoight'4.4Omm
)
H-3.00mm
Style-Arial
( Text~'3.00mm
)
H-2.5Omm
Style 'AriaI )
SUBMmED: RECOMMENDED: ( TextH0i!llil = 2.5Omm
APPROVED:
Conceptual Design Plan prepared and approved by the District Engineering OffIce
15mm from edge of the paper
15mm from edge of the poper
IAnnex"A - 2'"
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
Conceptual Design Plan prepared by the Consultant and approved by the District Engineering Office
15mm from edge of the poper
15mm from edge of the paper
IAnnex nA - 3"1
••
:S ••
:S
'0 C.Y. <YEAR> PROJECT '0
" ••
••'" CONCEPTUAL DESIGN PLAN FOR '"••
"0 "0
E E
,g <NAME OF PROJECT> a
./::
E E
E
0
<SECTION> J5
'"
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Conceptual Design Plan prepared by the District Engineering Office and approved by the Regional Office
15mm from edge of the paper
15mm from edge of the poper
IAnneX"A - 4"1
"
Q.
"
Q.
•• ••
-••
:5
0
..,'"
C.Y. <YEAR> PROJECT
CONCEPTUAL DESIGN PLAN FOR
-
:5
0
..,'"••
•• ••
E E
.::0 <NAME OF PROJECT> .::0
E E
E
...,
0
<SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
Conceptual Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the Regional Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex"A - 5"1
E E
0
.j:
<NAME OF PROJECT> 0
.j:
E E
E E
,..,
0
~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE 10>
IAnnex nA - 6"1
:S
Q.
••
.•. :5
0
., C.Y. <YEAR> PROJECT '0
••
."'" CONCEPTUAL DESIGN PLAN FOR ."'"
•• ••
E E
0
.j:
<NAME OF PROJECT> g
E E
E E
,..,
0
<SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Conceptual Design Plan prepared by the Consultant and approved by the Regional Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex"A - 7"1
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Conceptual Design Plan prepared by the Regional Office, checked and approved at the Central Office
15mm from edge of the paper
15mm from edge of the poper
IAnnex"A - 8"1
'"
:S '"
:S
'0 C.Y. <YEAR> PROJECT '0
'"
0>
"0 CONCEPTUAL DESIGN PLAN FOR '"
0>
"0
'" ••
E E
0
~ <NAME OF PROJECT> 0
ol:
E E
E E
0
I') <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Conceptual Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at the Central Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex nA - 9"1
'"
:S '"
:S
'0 C.Y. <YEAR> PROJECT '0
'"
0>
'tl CONCEPTUAL DESIGN PLAN FOR
••
0>
'tl
•• ••
E
~ <NAME OF PROJECT> 0
.l:
E E
E E
0
<SECTION> ~
'"
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Conceptual Design Plan prepared by UPMO, checked and approved at the Central Office
15mm from edge of the paper
15mm from edge of the paper
'"., .,
CD
"0
CONCEPTUAL DESIGN PLAN FOR '"
"0
E E
0
./:: <NAME OF PROJECT> 0
./::
E E
~ E
'"
<SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
Conceptual Design Plan prepared by the Consultant, checked and recommended by UPMO and approved at the Central Office •
15mm from edge of the paper
15mm from edge of the paper
IAnnex"A - 11" I
.,
Q. Q.
••
:S :S
.•...
'0 C.Y. <YEAR> PROJECT
., 0
••
'"••
"0 CONCEPTUAL DESIGN PLAN FOR '"••
"0
E E
~ <NAME OF PROJECT> 0
-=E
E
E
0
n <SECTION> .§
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
"'"
C> CONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR
"'"
Q)
E E
.g <NAME OF PROJECT> .g
E E
E E
~ <SECTION> If)
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
-
TN!_O'T~
MCJl' __
~~;-IU.~~
"""TrTWIl1.\lSI!llllTSlII!lJON_
~V.
••••• O~,
__
••• D~
ifIOJ7TYOOh
T_o.orA_I'U.l.YCOIIIll'CT.IJ'.'n').l)O\'f'(._
Conceptual Design Plan prepared and approved by the District Engineering Office (for Design and Build Projects)
15mm from edge of the poper
15mm from edge of the paper
IAnnex"A - 13" I
:5
.,
Q.
:5
(; C.Y. <YEAR> PROJECT .,
(;
••
0>
"<l
•• CONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR .,
0>
"<l
E E
o
J:: <NAME OF PROJECT> o
J::
E E
8 <SECTION>
E
III
'"
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
DATE DATE
Conceptual Design Plan prepared by the District Engineering Office and approved by the Regional Office (for Design and Build Projects)
15mm from edge of the poper
15mm from edge of the paper
.,
0-
:5
o
0-
••
:5
C.Y. <YEAR> PROJECT .•..a
.,
(;
".,
ClI ••
CONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR ClI
"CD
E
<NAME OF PROJECT> a
J::
E E
E E
o
..., <SECTION> If)
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Conceptual Design Plan prepared and approved by the Regional Office (for Design and Build Projects)
15mm from edge of th e paper
15mm from edge of the paper
IAnnex"A - 15" I
E
<NAME OF PROJECT> o
.j:
E E
E E
o
,..., <SECTION> It'l
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Conceptual Design Plan prepared by the Regional Office, checked and approved at the Central Office (for Design and Build Projects)
15mm from edge of the paper
15mm from edge of the paper
:5 :5
.•..o .•..o
., C.Y. <YEAR> PROJECT
..,'" .,
..,'".,
CONCEPTUAL DESIGN PLAN (DESIGN AND BUILD) FOR
"
E E
~o <NAME OF PROJECT> ~o
E E
E
~ <SECTION> to
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Conceptual Design Plan prepared by UPMO, checked and approved at the Central Office (for Design and Build Projects)
15mm from edge of the paper
15mm from edge of the paper
IAnnex"e _1"1
iQ. •..
o
Q.
'"
Q.
o
Q.
'"
-
:5
a
'"
C.Y. <YEAR> PROJECT H=6.4Omm (
StyIe=Aria/
TeJrtHelght=6.4Omm
)
'"
:5
'0
'i'"
Style-Ariel ) '"
DETAILED ENGINEERING DESIGN PLAN FOR H=6.4Omm ( TexI~=6.4Dmm
"'"'"
E
o
.l:: <NAME OF PROJECT> H= B.OOmm (
Style = Anal Bold
TeJrt He;;jIrt = 8.00mm
)
E E
E E
o <SECTION> It)
'"
<LOCATION>
Style = Arlal )
<STATION LIMITS> H=6.0Omm ( TeJrt HeIght = 6.00mm
<NET LENGTH>
I H=3.0mm (
Style-Aria!
TexlHeiglll=3.aomm
)
HK4.40mm (
Style - Aria!Bold
TeJrtH.,;ght=4.4Omm
)
HK3.00mm (
Style-Ariel
TeJrt~=3.00mm
)
H-2.50mm
Style = Aria! )
SUBMITTED: RECOMMENDED: ( Text ~l = 2.5Omm
APPROVED:
Detailed Engineering Design Plan prepared and approved by the District Engineering Office
15mm from edge of the paper
15mm from edge of the poper
IAnnex"8 - 2"1
.,
Q.
:5 :5
.•..o
., C.Y. <YEAR> PROJECT '0
.,
~'" DETAILED ENGINEERING DESIGN PLAN FOR .,'"
"0
E E
o
J:: <NAME OF PROJECT> o
J::
E E
E E
o
I") <SECTION> 10
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
Detailed Engineering Design Plan prepared by the Consultant and approved by the District Engineering Office
15mm from edge of the paper
15mm from edge of the paper
'"
:S
.,
Q.
:S
(; C.Y. <YEAR> PROJECT (;
'"
]'" DETAILED ENGINEERING DESIGN PLAN FOR ''""
"0
E
'E"
~o <NAME OF PROJECT> o
~
E E
E E
,..,
o <SECTION> 10
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Detailed Engineering Design Plan prepared by the District Engineering Office and approved by the concerned Regional Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex -B - 4"1
:5" Q)
:5
(; C.Y. <YEAR> PROJECT .•..o
.""
Q)
01
DETAILED ENGINEERING DESIGN PLAN FOR 01
."
" Q)
E
<NAME OF PROJECT> o
.t:
E
E
g <SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
1'H!'-"CCII\8U.TMTlIW.I.lIElfiIl'\U"~I'Of!ne.
.Tl'lUCI'UIIAI. OEnC''' ••1\_Of JHI! '_'~'(I,lII1'O
~AU.'N__ ~-'»J)~1'QfJ-'rolllMl'
--
~_WltIIOU1'1'lcE~Ol'1'H!~T~
-
SUBMITTED: RECOMMENDED: APPROVED:
Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
15mm from edge of the paper
15mm from edge of the paper
••
:5 '"
:5
(; C.Y. <YEAR> PROJECT (;
., '"
"., ".,
0> 0>
DETAILED ENGINEERING DESIGN PLAN FOR
s
J:: <NAME OF PROJECT>
E
0
J::
E E
E E
,..,
0
<SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Detailed Engineering Design Plan prepared and approved by the Regional Office
15mm from edge of the paper
15mm from edge of th e paper
••
:S ••
£;
(; C.Y. <YEAR> PROJECT .•.
0
Q)
co Q)
co
"0
•• DETAILED ENGINEERING DESIGN PLAN FOR "0
••
E
~ <NAME OF PROJECT> 0
.t:
E E
E E
0
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
~-
-
SUBMITTED: RECOMMENDED: APPROVED:
Detailed Engineering Design Plan prepared by the Consultant and approved by the Regional Office
15mm from edge of the paper
15mm from edge of the paper
.,
Q. Q.
-.,
:5
0
.,'"
"0
C.Y. <YEAR> PROJECT
DETAILED ENGINEERING DESIGN PLAN FOR
-
'"
:5
0
''""
"0
§ 'E"
.::: <NAME OF PROJECT> .:::0
E E
E E
0
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE 10>
Detailed Engineering Design Plan prepared by the Regional Office and approved at the Central Office
15mm from edge of the paper
15mm from edge of the paper
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at the Central Office
15mm from edge of the poper
15mm from edge of the paper
.,
Q.
:5
.,
Q.
:5
E E
0
.l: <NAME OF PROJECT> 0
.l:
E E
..,E
0
<SECTION>
E
~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Detailed Engineering Design Plan prepared by the concemed UPMO Cluster and approved at the Central Office
15mm from edge of the paper
15mm from edge of the paper
••
:5
Q)
:5
.....
'0 C.Y. <YEAR> PROJECT 0
•• Q)
'"••
"0 DETAILED ENGINEERING DESIGN PLAN FOR '"
"0
Q)
E
~ <NAME OF PROJECT> ~0
E E
E
,..,
0 <SECTION> J5
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
15mm from edge of the paper
15mm from edge of the poper
IAnnex"B _11" I
"
0- "
0-
•• ••
-••
:5
o C.Y. <YEAR> PROJECT
:5
(;
'"
il DETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR ..,••'"
••
E E
o
.j:: <NAME OF PROJECT> o
.j::
E E
E E
o
..., <SECTION> 10
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
TIIIi_outD_Q~-".tolR~-.&_
lIl£~QI'l..j[DCl_~~PC_
~OFne:lI'1IIUCI\lIIe~CJfTrC~!ll.Cl't
__ ncllOlII'rHEi~EtITJI't_
1Ml!Cl)fRM(:'IOIIl_l.HBJ)A.uY~FQlO'THE-..cntIW.
~""1'tIll~·~CUE·IO---'J" _
__ lI __ WEClD.1DdUCPl'l'llI'IlIEQttofOOU_
1lfTM;lo.Irll'lE~0l' •••••QOII11IW:TOIt
Detailed Engineering Design Plan prepared by the Contractor and approved by the District Engineering Office (for Design and Build Projects)
15mm from edge of the paper
15mm from edge of the poper
.,
Q.
:5
o
.,
Q.
:5
.,
(; C.Y. <YEAR> PROJECT .,
(;
.,'"
"0
DETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR .,'"
"0
E E
o
.l:: <NAME OF PROJECT> o
.l::
E E
E E
o <SECTION> 10
'"
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
"'~
1IlIi DIi __ -.o~lOll-'" ilIi IOUaY IIE-.& FOIl
lIE~TYIYT-EWAUD_t8IGIlI,...1t*
='::~~Of1>lli'"-""'CVAl.CWl
_COIlTlW;1Oll-..c • .-...ofI.UV~I'llIiTHE~ __
DIi~~OI.' __ ~~OlL'JO"""'l"f~
::::::.~..a:...~~FQfIMo....-e-
Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
15mm from edge of the paper
15mm from edge of the paper
:5
o
.,
a.
:5
.,
'0 C.Y. <YEAR> PROJECT .,
'0
.,'"
"0
DETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR .,'"
"0
E E
o
J:: <NAME OF PROJECT> o
J::
E
E
,..,
o <SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Detailed Engineering Design Plan prepared by the Contractor and approved by the Regional Office (for Design and Build Projects)
15mm from edge of the paper
15mm from edge of the poper
:5
.,
Q.
.•..o :5
C.Y. <YEAR> PROJECT .•..o
., .,
.,
0>
"0
DETAILED ENGINEERING DESIGN PLAN (DESIGN AND BUILD) FOR .,
0>
"0
E
<NAME OF PROJECT> o
.l:
E E
E E
o
..., <SECTION> It)
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office (for Design and BuRd Projects)
15mm from edge of the poper
15mm from edge of the poper
E E
o
J: <NAME OF PROJECT> o
J:
E E
E
,.,
o <SECTION> E
0{)
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
___ -..t:OIimocfOlll~.9QI.R~_li_
lIIE~OFHEDETMlttI_CIiia:lN1MJlK
~QFTHf-STllUC!'Ulll!IIlIIbI"!C:TfoQFT>E .N.M
__ 1JJHIJr''I1tE~a<rtn'.
'IIlII'1X)ImMC'JOII_l.HBllF\,UY~oao'l1tElJTI'I.IC'TII _
_ -CT~QE_~DO.IElO"""lY_
~1l!DIIIOIt_lII"!CII'Dt_ucvrroA~O\O.NlIa~
wrrtIOUrlMriCXWOlllr.YOF"JH!Cl.:IIfTM(:T(:l
~-
-
SUBMITTED: RECOMMENDED: APPROVED:
Detailed Engineering Design Plan prepared by the Contractor, checkBd and recommended by the concerned UPMO Cluster and approved at the Central Office (for Design and Build Projects)
15mm from edge of the poper
15mm from edge of the paper
IAnnex we _ 1"1
:=J
H=9.00mm ( TextHeIght-9.00mm
:5
'0 C.Y. <YEAR> PROJECT H=6.4Omm
Style'-
( Text Heig/1I= 6.40mm
)
'0
"'"
"0
liAS-STAKED" PLAN FOR style'Aria! )
Q)
o E
J::
<NAME OF PROJECT> H-8.00mm
style- Ariel Bold
( TextHeig/1l=6.00mm
) a
J::
E
E
<SECTION> III
<LOCATION>
<STATION LIMITS> H-6.00mm
style=-
( TextHelght-6.00mm
)
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
I H=3.0mm UZ:~~·3.00mm)
Style, Mol Bokl
H=4.4Omm ( TextHeig/1l-4.4Omm
) SlyIe'MoI
H=3.00mm ( Text Height. 3.00rnm
)
"As-Staked" Plan prepared by the Contractor and approved by the District Engineering Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex we _ 2"1
"••
E
0
~ <NAME OF PROJECT> E
0
E
~
E E
~ <SECTION> E
~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
·As-Staked" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
15mm from edge of the paper
15mm from edge of the poper
IAnnex we - 3"1
.,
0- 0
0-
••
:S :S
.•..0 .•..0
., C.Y. <YEAR> PROJECT
..,.,'" liAS-STAKED" PLAN FOR ..,••'"
E
••
0 E
~ <NAME OF PROJECT> 0
./::
E
E
E
~ <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
.,
Q.
:5
Q.
••
:5
(; C.Y. <YEAR> PROJECT (;
'" ••
.,'"
"0 "AS-STAKED" PLAN FOR '"••
"0
E E
,g <NAME OF PROJECT> 0
J:
E E
E E
0
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
·As-Staked· Plan prepared by the Contractor, checked by the Regional Office and approved at the Central Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex"C - 5"1
••
:5 ••
:5
.•...
'0 C.Y. <YEAR> PROJECT 0
•• ••
'"'"•• "AS-STAKED" PLAN FOR '"••
'0
E
~ <NAME OF PROJECT> ~0
E E
E E
0
", <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
"As-Staked" Plan prepared by the Contractor, checked by the concerned UPMO Cluster and approved at the Central Office
15mm from edge of the paper
15mm from edge of the poper
E E
o
J:: <NAME OF PROJECT> o
J::
E E
E E
...,
o
<SECTION> It)
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE 10>
'As-Staked" Plan for UPMO implemented projects with Construction Supervision Consultant. prepared by the Contractor, checked by the Consultant,
15mm from edge of the poper checked and recommended by UPMO, and approved at the Central Office
15mm from edge of the paper
.,
•...
0-
H-6.4Omm TextHeight=6.40mm
.,
•...
0-
.,
o
0-
:5
o
.,
0-
:5
'0
C>
C.Y. <YEAR> PROJECT S\yIe • Ariel
H-6.4Omm ( TextHeight=6.40mm
)
.,
'0
en
~ REVISED PLAN FOR S\yIe = Ariel
H-6.4Omm ( TextHeight=6.4Omm
)
.,
en
'0
E E
~o <NAME OF PROJECT> S\yIe = Artel Bold
H-8.0Omm ( Text Height. 6.00mm
)
~o
E
E
<SECTION> on
<LOCATION>
Style - Arial )
<STATION LIMITS> H-6.0Omm ( Text~'6.00mm
<NET LENGTH>
I H=3.0mm (
S\jIIe=_
TOldHe;ght-3.00mm
)
H-4.40mm
Style- Anol Bold
( TextHeight-4.4Omm
) StyIe'Ariol
H=3.00mm ( Text Height. 3.0Qmm
)
Revised Plan prepared by the Contractor and approved by the District Engineering Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex RD - 2"1
..,co
Q)
E E
.g <NAME OF PROJECT> "
.to
E E
E
~ <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
_1O''' •••
1lU
'0I'_1lI
~l
•••
-.cT1:lIIJO
_
_
1'l:l_~Of
_ ••n.
__
"-"_Af"'"
~HXJIWIQtA __
_,
__ __ ~~lfS~ TI>IS_llU.loIO< __ ••••••• _....,rv _
Revised Plan prepared by the Contractor, concurred by the Design Consultant and approved by the District Engineering Office
15mm from edge of the paper
15mm from edge of the paper
§ E
J: <NAME OF PROJECT> 0
J:
E E
E E
0
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Revised Plan prepared by the Contractor. checked and recommended by the District Engineering Office and approved by the concerned Regional Office
15mm from edge of the paper
15mm from edge of the paper
.,
0 L.
Q)
0-
0-
0
:5 0-
Q)
.,
'0
C.Y. <YEAR> PROJECT :5
.,
0>
"0
REVISED PLAN FOR .,
'0
0>
"0
E Q)
g
E
<NAME OF PROJECT> E
0
J:
E
a E
P')
<SECTION> E
~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
- ..---_ ...~_A_
"'-,
gn ••.••__
"O
_
-..
__
10".•••' •••__
._'
.••••
••••
•
•••._OII'I!I-...r
QI' __
...,...,.·_000 .••.
OOIIlIll.T"" ••••
•••.•.
_~TOY
OHla:._ ••••
ICf __ ~_IiImrt'_
__
_
_
__
-,-
--
PREPARED; REVIEWED AND SUBMITTED: RECOMMENDED:
APPROVED:
"Cll
REVISED PLAN FOR
CD
Cll
~ "0
••
E E
a
.l:: <NAME OF PROJECT> a
.j:
E E
~ E
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
Revised Plan prepared by the Contractor and approved by the Regional Office
15mm from edge of th e paper
15mm from edge of the paper
IAnnex 80 - 6"1
.,
0
0-
:5
0
0-
CD
:5
.•. C.Y. <YEAR> PROJECT
.,
0 '0
.,'"
"'tl
REVISED PLAN FOR
CD
'"
"'tl
CD
E E
0
J: <NAME OF PROJECT> 0
J:
E E
E E
,...,
0
<SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
~l"'DIHIQB"'mr...-rrrr<l!ll_
,••
000.
_-..c:ntJMTO""'"
lC(IOIl_lMl
I'IODIlI::l'_~
__
_
••••lHl!IIflIIY_
_
Revised Plan prepared by the Contractor, concurred by the Design Conslultant and approved by the Regional Office
15mm from edge of the paper
15mm from edge of the poper
.,
0 0
0. 0.
'"
:5 :5
.•..0 .•..
C.Y. <YEAR> PROJECT 0
.,
'"'"
"0
'"
REVISED PLAN FOR '".,
"0
E E
0
J:: <NAME OF PROJECT> 0
J::
E E
E E
0
'" <SECTION> :!!
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE 10>
Revised Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office
15mm from edge of the poper
15mm from edge of the paper
IAnnex no - 8"1
••
:5 ••
:5
'0 C.Y. <YEAR> PROJECT '0
••
0\ ••
"•• REVISED PLAN FOR 0\
"••
E
~ <NAME OF PROJECT> 0
J=
E E
E E
0
I') <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
_'lO!TW'....- . •.••
DlT ~1JolO1 ••.•• __ 1j)_
.••• __ ""'*CIl' :lOflICE.N:CliIFOIIO. __
a-_"',__
_ •.•_--..-
' •••__ llll,l._....- __ ~_
___ OF••• ..-"..1'ClII1VQl
Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the Regional Office and approved at the Central Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex no - g"1
"
Q.
Q)
"
Q.
Q)
:5 :5
(; C.Y. <YEAR> PROJECT (;
Q)
••
"••'" REVISED PLAN FOR "'"
Q)
E
~ <NAME OF PROJECT> ~a
E E
0
E
<SECTION> ,g
'"
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
Revised Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
15mm from edge of the paper
15mm from edge of the poper
:5 '"
:5
'0
., C.Y. <YEAR> PROJECT '0
.,
..,'"
'"
il REVISED PLAN FOR
E
'E"
"
./::: <NAME OF PROJECT> "
./:::
E E
E E
,..,
0
<SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
___
••.•••
-.._a._<lFItlu-.r.
'''''~
TJOtIot>
' __
•••
g~~
__
__
•••••.••
__
__
111)1 ••••••
~
__
---.
__
_
"""'"'
Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
15mm from edge of the poper
15mm from edge of the paper
IAnnex"O - 11" I
'"
:S '"
:S
'0 C.Y. <YEAR> PROJECT '0
'" ''""
'"
"0 REVISED PLAN FOR "0
'" '"
~ <NAME OF PROJECT> ~
E E
.5 <SECTION>
E
10
'"
<LOCATION>
<STATION LIMITS>
<NET LENGTH> ___ c_.._~
_TOI
Dn
1'(>
•.•••
101'__
~
__ fl._~,_1Wof""'_*L..:!l_'"
CQoIU.T
~
__
__
TIOlI
~
Wl_JIlIl.THI
TllYMr
•• r..wr
",*"", __ T"~<ll''''~f<lfllllJ:k.
Revised Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by the Consultant,
15mm from edge of the paper checked and recommended by UPMO, and approved at the Central Office
15mm from edge of the paper
IAnnex"E - 1"1
~
0-
"-
II>
o 0-
o
0- 0-
Il>
'"
:S :S
Style- Arial )
'0 C.Y. <YEAR> PROJECT H=6.4Omm ( Text HelgIlt _ 6.4Onvn '0
'"'"
"0 liAS-BUILT" PLAN FOR H=6.4Omm (
StyIe-Arlai
Text.:i..ight _ 6.4Onvn
)
'"'"
"0
'" 'E"
~ <NAME OF PROJECT> H=8.0Omm (
Style- Arial Bold
Text HeIght = 8.00mm
)
~o
E E
E E
o
'" <SECTION> on
<LOCATION>
<STATION LIMITS> H 6 oOm m (Style
=. = Arial
TextHeighl=6.00mm
)
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
I H=J.Omm (
Style-Arial
TextHeight-3.00mm
)
H=4.40mm (
StyIe-AriatBold
TextHeight-4.4Omm
)
H-J.OOmm (
Style = Arial
Text Height = 3.00mm
)
H-2.50mm
Style- Mol )
PREPARED: SUBMmED: RECOMMENDED: APPROVED: ( Text Hoight,=2.5Omm
"As-Built" Plan prepared by the Contractor and approved by the District Engineering Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex"E - 2"1
E E
,g <NAME OF PROJECT> a
J::
E E
E E
0
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION / BRIDGE ID>
"As-Built" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
15mm from edge of the paper
15mm from edge of the paper
••
:5 ••
.•.
0 C.Y. <YEAR> PROJECT
:5
'0
•• ••
'"
II "AS-BUILT" PLAN FOR "'"••
E E
0
J:: <NAME OF PROJECT> 0
J::
E E
E
...,
0
<SECTION> .R
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
'As-Builr Plan prepared by the Contractor and approved by the Regional Office
15mm from edge of the paper
15mm from edge of the paper
IAnnex"E -4"1
:5 :5
'0
., C.Y. <YEAR> PROJECT '0
.,
'".,
0>
"AS-BUlL T" PLAN FOR '".,
0>
E E
.g <NAME OF PROJECT> .g
E E
E E
0
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE 10>
"As-Built" Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office
15mm from edge of the paper
15mm from edge of the paper
.,
Q. 0
Q.
.s
.•... .s••
.,
0 C.Y. <YEAR> PROJECT '0
.,
.,'"
"0
"AS-BUILT" PLAN FOR .,'"
"0
E E
0
.t: <NAME OF PROJECT> g
E E
E E
0
'" <SECTION> ~
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
<ROAD SECTION I BRIDGE ID>
'As-Built' Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
15mm from edge of the poper
15mm from edge of the paper
Q. Q.
••
:5 ••
:5
'0 C.Y. <YEAR> PROJECT '0
..,••
0>
"AS-BUILT" PLAN FOR ..,••
0>
•• ••
E E
£ <NAME OF PROJECT> o
ol=
E
E
,..,
o <SECTION>
<LOCATION>
<STATION LIMITS>
<NET LENGTH>
....•.
~_a.wmBOIFWCHl~frt_~
"'_""'~fVMI,-"""'~ __ OF
"As-Builf' Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by the Consultant,
15mm from edge of the paper checked and recommended by UPMO, and approved at the Central Office
r- 15 mm romegeo
d f th e poper
I Annex"F - 1" I
• DliPA~ --~-~
<DISTRICT~
OF PU8UCWORKS AND .-.wAYS
•...
-"""'
..........
99.00
OFFICE>
FftO.ECfNAUE"NI:llClCllT1Olt
74.00
$o!fEfCONTENT5:
74.00
"..,.,."
PflIEPAED:
~r>
60.00
>
~"'STOIlESDtCONCf.PT·
- ~RI
52.00 I
....,.,.,.
<SIGNATURE OVER NAME>
CItEF.Pt.ANHlNGoI.NDCElIGNSECTtON
~~
52.00 I
--
<SIGNATURE OVER NAME>
.~ """'ANTDIS1llICT~
52.00 I
-.,
<SIGNATURE OVER NAME>
WiTIl:ll;TINIJIE£H
52.00 I
,."
@
..
17.00
e
I
....,..,.
17.00
.,
549.00
~
Q.
Conceptual Design Plan prepared and approved by the District Engineering Office
.,
0
•
Q.
.,
0
-, -.,. •.....,.
.,'" PROJl!CTN.WE.IlNDtOOlo~
"""'''''''''''''
--~~---. R£W!W£OAS TOORlQtI ~
- "'''''
e
<LOGOIS>
-
<SIGNA'lllli,W ••••UE> DEPAR11IEVr OF PUIIUC WORKS AND HlGtMAY8
•...
-"""'
E
0
E
<CONSUL TANTIS>
<SIGNA-",~E>
.........
<DISTRICTENGINEERINGOfACE> <SIGNATURE OVER NAME>
QlIl!F.f'lANoIlNGNoDDEIlIGNsecnow
<SIGNATURE OVER NAME>
~n
ASSISTAN'l"llISrRlC1~eR
<SIGNATURE OVER NAME>
~n
OBTRICTI~ @
E
o 58.00 I 58.00 I 74.00 I 74.00 99.00 52.00 52.00 52.00 17.00 17.00
'" 549.00
L Conceptual Design Plan prepared by the Consultant and approved by the District Engineering Office
• _~_"LP'~
fIM).leCT~ANDLOCA'Jk»t
"""'- """""'" -, ...-.0, -- """""" "'''''
....,..,.
09AR1'IIeNTOf PU8UC WORIUJAND HIOtfW'AVS
.......•. """' •...
95.00
-
<OIST1llCTENGINEERINGOFFICE>
60.00 80.00
<SIGNATURE OVER NAME>
~~
52.00
<SIGNATURE
~~
52.00
OVER NAME>
aftt,I'I..MoNNO»IDDEa:lIlI!IECTION
<SIGNATURE OVER NAME>
~~
~.PL,OlIIlNllOIGAMlCUll;lNOIIlllIOIC
52.00 I
<SIGNATURE OVER NAME>
~~
DIlITR1CTEffClMEER
52.00 I
<SIGNATURE OVER NAME>
~~
REGIOIIII\i.I»lECTlJR
52.00
@
I 17.00
e
I 17.00
549.00
Conceptual Design Plan prepared by the District Engineering Office and approved by the Regional Office
<LOGOIS>
<CONSUL TANTIS>
55.00 I
-,
""'""'"
<SIGNA~R
<SlG~~E>
58.00
NAUE>
I
PROlECT~.t.HDLOCAT1ON·
71.50 I
"""-
11.50 I
~=-==::=~Y1
-
.-
<OlSTRCT~OfFICE>
53.00 I
RtVIEWEDASTODESl3HCONCePT:
52.00 I
<SIGNATURE OVER NAME>
cttI'.~ANDIJESIONIMIKN
52.00
--
<SIGNATURE OVER NAME>
Dlll:iTI(1CI~1III
52.00
"""""".
52.00
@
"'''''
17.00
e
....,..,.
17:00
549.00
Conceptual Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the Regional Office
I Annex"F - 2" I
<REGIOl'W.OfFICE No.>
....•.......
99.00
PAOJE<lTNAJ.EANDl.OCA1Pf:
74.00 I
'-';ET~NTS:
74.00 I
_
"""""
~1lWE>
.
60.00
>
-
<SIGNATURE OVER NAME>
~~
cteEF,~1JelIOtt8ECTlClN>
52.00
....".,
<SIGNAlURE
CHEF. P\NNItG
~~
.
OVER NAME>
AIG DE8QtI C1'JI8IOH
52.00 I
-
.....-
<SIGNA lURE OVER NAME.
MlAlrM1R!:~~
52.00 I
-
<SIGNA lURE OVER NAME.
~~
REGION\l.lllREC1tIR
52.00
@8
I
"''''
17.00 I
,"",NO.
17.00
549.00
.,
'-
Q.
0 Conceptual Design Plan prepared and approved by the Regional Office
.,
Q.
_.
:5
.,
0
'"
E
<lOOOlS>
<SIGNA~NAUE>
PROJECT,IjAtM;.AltDLOCAl1l:*,
"""""""""
e I\fNlE.'Wa) M TO DEaDf CONCEPT;
-- - "'''' '"""NO.
0
E
<CONSUL TANTIS>
"",,",D
•••••••• ,~UE>
~~"::-===~d .........
<AEOICW.LOFACEltI>
<SIGNAlURE
QtI~f,~UIJelllO"~
OVER NAME. <SIGNATURE OVER NAME.
OIEl',I'Vo-..GANDUESllJIICl/1IICN
<SIGNATURE OVER NAME.
AIIIllST....,.~~'t.-.
<SlGNATtRE OVER
R~DflECTOI'I
NAME>
@8
E
o
I') 55.00 I 56.00 I 71.50 I 71.50 I 53.00 I 52.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00
L
549.00
Conceptual Design Plan prepared by the Consultant and approved by the Regional Office
.......,.
<REGIOl'W.OFFCENo>
95.00
PJIOJECTIoIAUEANDLOC'AnoN:
52.50
'""""""""'"
52.50
PREPARED;
"""'"'"
-'W
55.00
NAME
'
>
""""'"
M~ """""~-
52.00
_.
<SlGNAlURE
~~
OVER NAME>
IIEOIONI\LDIR£ClOfI
52.00
M~
(SEE COVER SHEET)
<NAME>
~ORr\I>IIIJREAllIJl"CIl:.lIU\l
52.00
M~
(SEE CCNER SHEET)
~~RR
<NAME>
52.00
_.
-
(SEE COVER SHEET)
<NAME>
\IMlUI5HA1I:lMYKM
""'""'-----
52.00
@8
"''''
17.00
'""'NO.
17.00
549.00
Conceptual Design Plan prepared by the Regional Office, checked and approved at the Central Office
<tOGOIS>
PREPARED: PROJECTNAMEAHOt.OCATtON: ...•. - e ,- RIMIiWEl)ASlOOESlGN~;
""""'""'"
•...... "'''' ,"""NO.
-.•.••....
(SEE COVER SHEET) (SEE COVER SHEET) (SEE C<NER SHEET)
..-
..-mo.
....-...""'"... @ 8
REf'\,A1LI::OI'nE~
••••.•~Ol'....-uc'llflDltaMD~ <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<CONSUlTANTfS>
> ....•....... DIItI',~ANlDElICiINcv.-..
....•.•.~......
1HEF.~DESlGNOI\/I!IION> REGIIOIW.DI*:CTlJR ~OR'MtDPtlBiIIGlt All5I$T~r
""'""'-......,..
.•tn'FOfl ~~
50.00 I 50.00 I 45.00 I 45.00 I 53.00 I 45.33 I 45.33 I 45.33 I 45.33 I 45.33 45.34 I 17.00 I 17.00
549.00
Conceptual Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at the Central Office
I Annex"F - 3" I
<\JPMOCLUSTER>
"""'""""
95.00
AND HICIHWA'R
PROJ£CTNAMENIlJLl'JCfIJ1QN:
I 52.50 I
SliE1:TCCWTENf$:
52.50 I
_0
--- <.~~
55.00
••••••••
..
"".....,
<SIGNATURE OVER NAME>
ctEf'.~~DIVJ8lON>o
"'"E'''''''''''''''
52.00
.............,
<SIGNATURE OVER NAME>
.....,a.us_
I'IlWeUfDIRECTCR
52.00
(SEE COYER SHEET)
<NAME>
52.00
(SEE COVER stEET)
<NAME>
~ANlSECRElN'rr~
m>HCN.••••••••
52.00
-(SEE COVER SHEET)
<NAME>
I.NlERSECRETARVFOR
17.00
e
'-NO.
17.00
.,...
549.00
a. Conceptual Design Plan prepared by UPMO, checked and approved at the Central Office
.,
0
Q.
.,
0
.,
co
.•. """" PftOJECTIWoIE1MOLOCATlON:
"""- """"'" ~AS'JODI!SlGNOONCI!PT; ,,~ I-- "'''' '-NO.
tit
e
<LOOOlS>
E (SEE COVER stEEl) (SEE COVER SHEET) (SEE CCNER SHEET)
e
E
<CONSULTANTlS>
"""""",.
IllY'I..eI..J::OFTHE~
~-o.."""'::_AND""'"
....,""""'"
""""""""
<SIGNATURE OVER NAME>
F'I'Itl.ECTUOIWIGl'R
c$IGNATURE
atlEF.~==~
OVER NAME> <SIGNATURE
"::~
OVER NAME>
-<~,.~"""" MISIT~.ynf'lJR
1».11!'~SERV1:E8 Illt.TF
~.Q",~
~8ElMC1!S
@
E
o
'" 50.00 I 50.00 I 45.00 I 45.00 53.00 45.33 45.33 45.33 45.33 45.33 45.34 17.00 17.00
L
549.00
Conceptual Design Plan prepared by the Consultant, checked and recommended by UPMO and approved at the Central Office
•-~-~ DEP~
~AO::)
Of PUBLK: WORKS ANO HIGHWAYS
BUREAU OF DeSIGN
<CONCERr.ED1lMSION>
DlWE. PORT AAEA,1oWIIlA
99.00
PRO.E'CTNAMEf1H)lOCA11l:iN:
74.00
8HEETCONTENTS:
74.00
_.
"""""
~~r'E>
~r.g>
60.00
""""""
~~
ctIEF.~~~
52.00
..-me
~~
(SEE COVER SHEET)
~
<NAME>
••••,~!Jf~
52.00 I
--
(SEE COVER SHEET)
~~ -........ -
<NAME>
l\&IIIGA""RCllliTNn'l'l;R
52.00 I
-(SEE COVER SHEET)
~IMI'fOR
<NAME>
"""""'
52.00
........ @
I
"''''
17.00 I
e
....,NO.
17.00
549.00
<LOoolS>
<CONT~TORJS>
56.00 I
.......... ,
....."'"
<SlGNA~NAUE>
<SIG"H,WW'UE>
56.00 I
PROJECTNJ.UEH«)L0C4TICtI'
74.00 I
'""''''''''''''
74.00 I
•~~~-- DEPARTIIeNT OF PUllUCWORKS
4lEBIOroW.OFfJCEIfD.>
<lllS111ICTE~NG
99.00
AND HIGHWAY'S
OFfiCE>
I
..-...
<SIGNATURE OVER NAME>
GttEF.~INBIUA)a:wJM-';IJ;JN
52.00 I
--
<SIGNATURE OVER NAME>
A551iT_IDli!I'lI'\,.'~ER
52.00 I
_.
<SIGNATURE OVER NAME>
[ETJU;TII~
52.00
@
I
""'"
17.00 I
e
.-NO
17.00
549.00
Conceptual Design Plan prepared by the Contractor and approved by the District Engineering Office
(for Design and Build Projects)
I Annex"F - 4" I
........, ~IUMEAMDl.OCo\11ON:
"""""""'"'
e ""'""'" """"""'" - "''''' ....".,.
e
<LOGO/S>
--
<SIGN.\~R ••••••.•
~~~~~"
@
-
<SIGNAlURE OVER NAME> <SIGNAlURE OVER NAME> <SIGNAlURE OVER NAME> <SIGNATURE OVER NAME>
<CONTRACTOR/S>
- --
.umrr:TlNOtlE~OFf'lC£> Q'W',f'l.AllrNHGNlDDESIiIJj~ CI'E'.I'lJ\NIIlNJAlllPDIlSlGN~ DlJflnCI~ IlE(lIONN..~CfDIII
66.00 I 66.00 71.50 I 11.50 I 53.00 52.00 52.00 52.00 52.00 I 17.00 I 17.00
549.00
a;
Co
Conceptual Design Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
.,
0
_
Co
(for Design and Build Projects)
.,
0
.,
01 .
I'RQlI!CT!<lI\loEANDL.ClC.'TION IllEETCONl'E!NT&:
tit
........,
-- """""" "''''' ......".,.
e
<LOGOIS>
E <SIGNA~V NAU&
e
E
E
<CONTRACTORIS> """'"'"
~~M'"
p..un-.n OF..-.: ••••
P:I!!PUIUC0l' 1'HE PHIJ'PWE$
-""""
- •...
AoNO
••••• <SIGNAlURE OVER NAME>
Ct'IEF,~IUGDESilt8l1ClJCN
<SIGNA lURE OVER NAME>
--
g; •••.•~AJrIC~tN'MCIN
<SIGNATURE OVER NAME>
-
A8EJ1T~I'E(lII[JfW.~IUH
<SIGNATURE
--
~DIIECfO'l
OVER NAME>
@
o
I') 55.00 I 66.00 I 71.50 I 11.50 53.00 52.00 52.00 52.00 52.00 I 17.00 I 17.00
L
549.00
Conceptual Design Plan prepared by the Contractor and approved by the Regional Office
(for Design and Build Projects)
.."""",. !'ROJ£CTNoWE~l..OCATION -
...•..
tit
CHECKED: ~ """""""', "''''' ...•.. '"
e
<I.OGOIS>
< > (SEE COVER SHEET) (SEE COVER SHEET) """'- (SEE CCNER SHEET)
~ICOFntEl'HU'I'IfE$
@
-
.-mo,
-
Of !"talC Wl:IllCIAMJ •••••• <SIGNATURE OVER NAME> <SIGNATURE OVER NAME,.
~?R,,,,,,
<CONTRACT~
< > -"""' •...
-
[;t1U',P\.ANIIINOo\JDDEllIGNIW&:lN
...............
QoIEF.~DE!lKlNDNlI!ION>
<SIGNA~~:QfINAME>
I)MU;rOl'l~CWDa8ON .....,.~~~""f'OW
"""""'''''''''''' TEt't/NOri, SE!WCES
50.00 50.00 45.00 I 45.00 I 53.00 I 45.33 I 45.33 I 45.33 I 45.33 45.33 45.34 17.00 17.00
549.00
Conceptual Design Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office
(for Design and Build Projects)
.. ....,-
"""'" PROJIECT*ME1III£JlOCA~'
,,=1~ .. @
~r...~
""","",' _~~~Y""'A <SIGNATURE OVER NAME> <SIGNATURE OYER NAME:> <SIGNATURE OVER NAME>
<CO~ORIS> """ .........
- PROJECTIMfIIWEH Oftf.~UI.1ll!:IIQN~
""~ 8lJflIEMIlN'DBlIlliN
~1l1R"'OI'lJliSQN Mi8IIJT~.un'RM
""""'" ....••. """"""' """"
50.00 50.00 45.00 45.00 53.00 I 45.33 I 45.33 I 45.33 I 45.33 I 45.33 45.34 17.00 17.00
549.00
Conceptual Design Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
(for Design and Build Projects)
I Annex"G - 1" I
• DEPAwn.NTOF ~~--~
PU8UC WORKS AND HIGHWAYS
~omcr'*"~
-
<OISTRICTENGIEERING OffICE>
99.00 I
PAClJECTNAMEAIC)lOCll'OON:
74.00 I
!lHEETCONl1::NTS,
74.00 I
""""',
"""""",,
~~>
60.00
>
I
....•.....
<SIGNATURE OVER NAME>
~~
ENQIoIS:RI
52.00 I
......"",
<SIGNATURE OVER NAME>
ctlEF.f'LAN4IN1jAMJIJI35IliN8EClIJN
52.00 I
""""""""
52.00 I
-,
<SIGNATURE OVER NAME>
DBTRICT
52.00
INOWEBl @
I
""'"
17.00
e
I
"""'NO.
17.00
549.00
~
••
Q.
Detailed Engineering Design Plan prepared and approved by the District Engineering Office
"
Q.
•~~---
••
:S
0
..,••'" .. --..n,
•• -- f'ftOdECTNo\I.E.NelOCA'f1ON: liN!ETCONl'Bf'J$: ~ """""'" ""'"
....,NO.
e
<LOGOIS>
E <SIGNA.T~NA"& DePARl1IIeNT Of PUBUCWOItK8 AND HIGHWAYS
o
@
«EGll)W.OFFICENov
J::
"*""" ..........
<llISTFIlCTENGtlEERlNGOffICE> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <StGNA.TURE OVER NAME>
o
E
E -
<CONSUl. TNolTIS> ~F, f'1.JI.II'QoKiNolOmBl3Wl£ClION AmIIITNfTIlETRlCTEMl»EER CII!I-m!l:TENQIlt£I;.I(
I') 56.00 I 5ll.00 I 74.00 I 74.00 I 99.00 I 52.00 I 52.00 52.00 I 17.00 I 17.00
L
549.00
Detailed Engineering Design Plan prepared by the Consultant and approved by the District Engineering Office
• DEPARTIIENT ~~-~
OF PUBLIC WORKS AND HIGHWAYS
..•••....
95.00
"""'"
..........
<llIS1RICTENGIEERlNG OfFICE>
PROJECTNAUEANO~1IOIot
60.00
"""""""'"
60.00
PR:EPAREO;
<StGNATURE
~Il
52.00
OVER NAME>
......"",
<SIGNATURE OVER NAME>
ctIU'.Pl.AfNNlJNmDE8lJlN~
52.00
...-.,
<SIGNATURE OVER NAME>
CMEf",~AND_UIIIlIalIf
52.00
--
<SIGNATURE OVER NAME>
DllinllCf~
52.00
""A'M'"
<SIGNATURE OVER NAME>
1tOIOtW.~"'UIf
52.00
@
""'"
17.00
e
•••••
17.00
NO.
549.00
Detailed Engineering Design Plan prepared by the District Engineering Office and approved by the concerned Regional Office
e
<LOGO1$>
<SIGNA~NAUE>
-~
<CONSUl TANTIS>
"""'"""
<S""'~UE>
AI!PIJl!lLlCOl'ntE~
liIP.unwsn::.-:O::'AIlO
.......••.
<f:lI8'I"RI:'Tt~OfFlCE'
••••••. Yl <SIGNATURE OVER NAME>
CHI&,
~~
PlJUrHNa AND DEIlIiIN liI:CllCtI
<SIGNATURE OVER NAME>
~~
OEF.Pl.AlNNGAND~1M8JN
<SIGNATURE OVER NAME>
~~
DllJJRICTENGNEER
<SIGNATURE OVER NAME>
~~
REGK»W.OR;:[;T(JR @
55.00 55.00 71.50 71.50 53.00 52.00 52.00 I 52.00 52.00 17.00 17.00
549.00
Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
-
<REGIOIW.OFFICENo.>
99.00 I
PROJECTIWEN«ltOCATDt:
74.00 I
!lHi:ETCOIfI1!:IITS:
74.00
_.
0•• ",,,
~1Ir>
<SIGNA~NAME>
60.00
.........,
<SIGNATURE OVER NAME>
CMEF,~DDEBQNlJECT1CNl>
52.00
..wm;o·
52.00
--
<SIGNATURE OVER NAME>
AS5l8T1WTflBJKltW.ClRECTOlt
52.00
-
<SIGNATURE OVER NAME>
REGIlltW-DlRECTOft
52.00
@
""'"
17.00
e
,"""NO.
17.00
549.00
~
"
0-
0 Detailed Engineering Design Plan prepared and approved by the Regional Office
0-
"
0
"
0>
"" <tOOO/S>
_. PAQlEC'tNAAiENflJ!,.OCATJCItI: Sl£ETCONY~
It - -- _. .•"'" ....".,.
E
e
<SIGNA~~RNAME>
0
~ ~~~..:::=- @
-
<SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNA 1\JRE OVER NAME> <SIGNATURE OVER NAME>
<CONSUL TANTIS> <AEGDW.CJI'RCE ~. ~,PI.NHIfONlDDEtIlQN&a:11ON CIOI1f,R.ANMI«lANDOOSlQIII~ ABlnTNfT~~I~ REI;llOIoIf<L.Dll'ECTOR
E
E
<SIG",~& ~~ ~~ ~~ ~=
o
'" 55.00 56.00 71.SO 71.50 53.00 52.00 52.00 52.00 52.00 I 17.00 I 17.00
L
549.00
Detailed Engineering Design Plan prepared by the Consultant and approved by the Regional Office
-.
<REGlOtW. OFFK:E No,>
95.00
PAOJECTNAMElMllOCAl1ON:
52.SO
IlI£eTCCNTENrS:
52.50
...•.....••.
<"""""WNAME>
SUlIIo!lTTI!o:
55.00
>
""""'"
52.00
...,"""""'"
~~
1lEGDrW.~0P:
52.00
~~
(SEE COVER SHEET)
<NAME>
DIIleCTORIV.~Cf'~
52.00
(SEE COVER SHEET)
<NAME>
ASSIBTMfl'I;IB;IIETNfI'f'afI
~~ ""'"""""""'"
52.00
"""""'"
~~
(SEE COVER SHEET)
<NAME>
"""""'
52.00
....
UNDERSECAETARY' fOlIl
"""
@
"'''''
17.00
e
....,"'.
17.00
549.00
Detailed Engineering Design Plan prepared by the Regional Office and approved at the Central Office
"'''''''''' "'AOJECTPWoCEAt«>LOC#\TlON"
'""""'"""'"
It .•...•
CHEC*ED:
"""""" .. """"""" ~ "''''' '"""'"
e
<lOGO/S>
< > (SEE COVER St£ET) (SEE COVER SHEET) (SEE COlER SHEET)
<CON~TIS>
"""""".
< >
lO'.,.....,~...::c~
~OFflCENlIo.~
"""""'"
<SIGNATURE
cttEI',~NWJ_DII'&:JN
~
OVER NAME> <SIGNATURE OVER NAME>
QtEf,
........,~""""
<OONCaMW DUIQN IWIlICN>
<StGNATURE
~~CllJll'l
OVER NAME::-
UI'II:~'Qlf1SOt"DIliIIlGIt
~w
"""~~"'"
~~-""""'" I~=
~m.."",
"""""".....,..
@
SO.OO SO.OO 45.00 45.00 53.00 45.33 45.33 45.33 45.33 45.33 46.34 17.00 17.00
549.00
Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the Regional Office and approved at the
Central Office
I Annex"G - 3" I
<UPMOClUSTER>
95.00
...........
WORKS AND tDfWAYI
PIlOSECT/IlAWi:~lOQ\ltON:
I 52.50
&£ET CCNTEKTS:
52.SO I
..•....•
"""'"'"'
<81GNA:MIM
55.00
hWoIE"
>
I
.......",
<SIGNATURE OVER NAME>
~, I!UREAUOFDESIGN
52.00 I
-
~~ ....""""",
<SIGNA lURE OVER NAME>
PftOJECTDIlECroR
52.00 I
~~
(SEE COVER SHEET)
<NAME>
~Q'I"'.alRe'AUDFDe8IUN
52.00 I
~~
(SEE Co.tER SHEET)
-.......,..
<NAME>
.-.sl!II5TANTIIECIl:ETNn'FCil
52.00 I
-,
(SEE COVER SHEET)
<NAME>
\NJIiRlll:CftlTARY ~OR
""'"''''''''''''''''
52.00
@8
I
"' ...
11.00 I
-StlERNO.
11.00
549.00
~
"
0.
Detailed Engineering Design Plan prepared by the concerned UPMO Cluster and approved at the Central Office
"
0.
"
:5
0
"'"
"E <1..00015>
....•....•• "fk>JECT,.,.ANOlOCATlON
....,""""""
It
CHfCllED:
""""'" ..- (SEE COVER StEEl) (SEE COVER SHEET)
•..•...
(SEE COlER SHEET)
"' ... ...., •..
e
E
<CONSUlTANTIS:>
""""",,, ~~..:.;e.:::=~
..••...........
"""""
<SIGNATURE
~~
OVER NAME>
I'ftO.E:CTw.NJI.GDl
<SIGNATURE OVER NAME>
....•...~......
a.IEF·.~.....-..c:n..EDDE:IAOH~
<SIGNATURE
~~
OVER NAME>
~~0I"0B;lIQI\I
~~RM
~= @8
E
,..,
o
50.00 I SO.OO I 45.00 I 45.00 I 53.00 I 45.33 I 45.33 I 45.33 I 45.33 I 45.33 I 45.34 I 11.00 I 11.00
L
549.00
Detailed Engineering Design Plan prepared by the Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
•~~--- DEPARTMENT OF
~AClODfWE.
PUBUC WORKS AND tlQlfWAYS
BUREAU Of DESIGN
<CONCERt.EDIlIVISIOO>
99.00
PORTJJlEA,IWaA
PROJECT NAUENCI LDCATDt
14.00
8tEElCONTEHT'S'
14.00
PflEl'AAED:
""""".
~~>
~~>
60.00
-
<SIGNATURE
"""""~
52.00
OVER NAME>
..•..
CIfioF.~uoeBlONlll'tI16IIJJP
"""""'"
(SEE COVER SHEET)
~IUMIV,~UI'~
<NAME>
52.00
-
Mn
(SEE COVER SHEET)
<NAME>
_l_'~'AIn'~~
-"""""
52.00
_.
(SEE COVER SHEET)
Mn
<NAME>
~:::.c":
52.00
@8
"' ...
11.00
........
11.00
549.00
<lOGOlS>
<CONTRACTOR/&-
56.00
I'\IlEPARED:
•••••mo
<SIGNA~NAUE>
<SIG~UE>
58.00
l'ftOJECt,....t.EANDlOCATION:
14.00
StEeT COh"TEHJS:
14.00
• DEPARllIENT ~~-- _
Of PUBUC WORK8 AND HIGHWAYS
4tEQlCHIJ.OFfJC£No.>
<DIS1RICTENGINEERING
..••..•••.
OFFICE>
99.00
<SIGNATURE
~~
.
OVER NAME>
CIIEl',f'LAN'INOANDDlCtiKiNIif;CIIJN
52.00
""""""'"
-
~lNfTDI5IR1C1ENQlN15eR
52.00
-
<SIGNA TlRE OVER NAME>
~n
OIITRICllNGHllII:
52.00
@8
"' ...
11.00
....."'.
11.00
549.00
Detailed Engineering Design Plan prepared by the Contractor and approved by the District Engineering Office
(for Design and Build Projects)
I Annex"G - 4" I
_ .
I'llO..IECTJ<lAWNfDlOCATlON· ...... - e ......... --. """""", '"''''' ".""0.
- ---
<LOOOIS>
-~WOWlE>
~"::'=:=--T1
•.. <SIGNAlURE OVER NAME> <SIGNA lURE OVER NAME> <SIGNA lURE OVER NAME> <SIGNATURE OVER NAME>
@8
-
<CONTRACTORIS>
55.00 I
<S~E>
53.00
cnIt".~NfDCtiR;;JrltM:l1DN
52.00 I
OIif.I'\AIIIIlNGANDIlIi8iftDVllACN
52.00 I
lJRITKICTENGIIEER
52.00 I
.- REGIONN.lMECTDR
549.00
.,
•..
Q.
Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
.,
0
Q.
:5
(for Design and Build Projects)
.,
0
'"., <LOGOIS>
........", Pl'lOJECTIVIMENfDlOCo\T1ON SHEeTCONTaITS:
e .•..•..•.
- """""'" "'''''
....,.•.
-
E <SJGHA~W NAME>
e ~"':":~
.••..••.."v
__ Yl
<SlGNAruRE OVER NAME> <SIGNAlURE OVER NAME> <SlGNAlURE OVER NAME> <SIGNATURE
~~ OVER NAME>
@8
--
<CONTRACTORIs> cIl£GiICN,O,I. OFRCE O4I>F,,,,,,,*-NmDE8lQNSECTICN Ctl£F,Pl.ANNNIlAM:IIl£SlOltDVl8:lN A881T~~~~
E
E
o I I
'" 55.00 I 66.00 I 71.50 71.50 53.00 52.00 52.00 52.00 52.00 17.00 17.00
549.00
L Detailed Engineering Design Plan prepared by the Contractor and approved by the Regional Office
(for Design and Build Projects)
_ .
PRO.lECTJWE/>MIJl.OCATlQN
...,""""'"
e """"'" ....-. - """"'" "''''' ....,"'.
-,
<LooOlS>
(SEE COVER StEET) (SEE COVER SHEET) (SEE co.tER SHEET)
l!I'MT1&t~~~.-.m
.••..••..
_"""'No>
<SIGNATURE OVER NAME> <SIG~TURE OIER NAME> ~~~NAME>
"""li!l&•••. ",,,,
"""'"" ......... ..""'" @8
-- ~"'"
CHEF.~_~D\I"" CHEF,~Doe!l1GHOMlIION> ~crOR~ClfOEBIOfI
<CONTRACTORIS>
••••_ ~Of'DSlIIlilN
""""""'
50.00 I 50.00 I 45.00 I 45.00 I 53.00 45.33 45.33 45.33 45.33 45.33 45.34 I 17.00 I 17.00
549.00
Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office
(for Design and Build Projects)
<LOGOIS>
PREPAAEO ; PROJeCT NI\ME AI«) lOCATION ....,- It "''''''''
......... """"""'"
(SEE COVER St£ETJ (SEE COVER SHEET)
""""'"
(SEE COVERSHEET)
"''''' ....,NO.
<CONT~ORfS> - >
~~~..::::~.
.••..••..
",,",CWSlOR>
<SIGNATURE
-
OVER NAME>
PRWfCTM/roIW3£A
<SIGNATURE
OEI'.~DE:IIUN~
OVER NAME>
~UOf'DEIiIllN
<SIGNATURE
Mm
OVER NAME>
PfiQJ~clIllJa<l,;UJR
.....,"""""
~CIUR'B;Of"LJaIlGJf Aa!IIn'~"'"POIt
"""'"" ......... ~reCtltllQtlL_R\/ICeSi "'"
@8
50.00 I 50.00 I 45.00 45.00 I 53.00 45.33 45.33 45.33 45.33 45.33 45.34 I 17.00 I 17.00
549.00
Detailed Engineering Design Plan prepared by the Contractor, checked and recommended by the concemed UPMO Cluster and approved at the Central Office
(for Design and Build Projects)
I Annex"H _1"
I
<LOOO/S>
........... PlK)JECTNAMEANOlOCAT1ON
......""""'"
e '"""'"
......, - """"""",. - ••• on BHEl'TNO,
.cCONTRACTQRIS>
<SIGNATURE OVER NAME>
"""""' ......•..
~~~'='""",,,\'l
GlRl:T
---,.,
--
EHONERtfGOOU;>
<SIGNATURE OVER NAME>
I'flCIJE:T9IIJNER
<SIGNATURE OVER NAME>
~,4IP'I.DIIiNlINQss;naM>-
<SIGNATURE OVER NAME>
QIlil'.PI.AJONiAMJCESIl,OI\I~"JUll
<SIGNATURE OVER NAME>
A861SToWTDII51Rl!;l£MJIEI:II'
<SIGNAllRE
m~
OVER NAME>
DIBTRlCTfNGN:tJI @8
50.00 50.00 51.00 I 51.00 63.00 52.00 52.00 52.00 52.00 52.00 17.00 17.00
549.00
"-
II)
Q.
"As-Staked" Plan prepared by the Contractor and approved by the District Engineering Office
"
Q.
II)
0
II)
0>
II)
<LOoolS> - PflOJECTJWilI!foNOLOCl\.T1c.t SlEET CONfEHT$:
e _. - - - ••• on .-r...
E
e
E
E
<CONTRACTClR./S>
<SIGNATURE OVER NAME>
"""""' .....•••
~~~..::::s .•.••---,.,
<IlO1RlCI'......-.o""'"
""""",.
YI ~[):
<51~~
m~
t»ftI',~MDDEllIt;WDM&ION
<SIGNATURE OVER NAME>
m~
DRiTFlfCTB«lIEER
<SIGNATURE OVER NAUE>
m~
A&IlnANTRliGlONl'.l.~
<SIGNA TIRE OVER NAME>
m~
REGICNIIII.~CTlJR @8
o
I"l 50.00 50.00 50.00 50.00 63.00 54.00 52.00 52.00 52.00 52.00 17.00 17.00
L
549.00
"As-Staked" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
<LOoolS>
........... PROJECTNAMENI:lLC\CATlON'
..••..""""""
e - ......., - """""""" -
@8
••• on ..••.....
--
lI9A~~~~'l'1
<SIGNA lURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNAllRE OVER NAME>
<CONTRACTORIS>
- PRO.IfCTeNC»E£JI O'a,".--"-lrjfNi~l __ IIRi1IDNI\LDII£CTIlK
.~
F'ftOJlft;TIMNAQSt ~tIla'.~NrlDUl:3lGJllIt:(;llDN .v.llIlf'NofllC1:U1UM11t.~l~
~OFACf:No.~
M~ m~
50.00 50.00 51.00 51.00 I 63.00 52.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00
549.00
"As-Staked" Plan prepared by the Contractor and approved by the Regional Office
<LOOOIS>
..•. """ I>ROJECTNMlEN«)l.OCATlOtit
..••..""""""
e """"",
~~ME>
""""'" - (SEE COVER StEEl) (SEE COVER SHEET)
•.......
(SEE CCN'ER SHEET)
""on .-r...
<CONTRACTORIS>
<SIGNATURE OVER NAME>
"""""' .....•••
lEI'.urr:....~~~_'l'1
...•.....
_OFFICE ••••
"""""", >
<SIGNA.TURE OVER NAME>
DWEf',<:oNCElINEDDESICIN~
••.•••••0"••'••
<SIGNATURE
~~ECTali
OVER WJ.tE>
OIIlB;TOR'MbOl'DalIGJII AIlIIIT~oIJ«RJR
"""""'''''''''"'
~"'"
""""""' ....... @8
50.00 50.00 I 45.00 I 45.00 63.00 I 45.33 I 45.33 45.33 I 45.33 45.33 45.34 17.00 17.00
549.00
"As-Staked" Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office
<LOOOIS>
.........,. l>ltOJfCT~I>WJI.ocATlON
...,""""""
tit .......• ~_r'
-, ......... ............, 1-<-<- "'''' ...,NO.
e
(SEE COVER StEEl)
..
(SEE COVER SHEET) (SEE COlfER SHEET)
~~~..::::s.......,.
<~ORJS>
<SlGW,TURE
M~
"""""-
OVER NAME>
-
.....,""""'"
,
~&.IfME>
<$IGMI\TURE OVER NAME>
......., •..•....
t:HI:f. <alNCERNED DElIIUN DWBCN>
M
<SIGNATURE OIlER NAME>
I'I'l:O.£t;lUltct:f,;I~
.....,""""'"
~~OfDEBOlf
."
l\AIIT~oUffKlll
""""""""""'"
~fl!ctMO\L ""
8f:lMCflS
@
50.00 50.00 I 45.00 I 45.00 I 53.00 45.33 I 45.33 45.33 I 45.33 45.33 J 46.34 17.00 17.00
549.00
~
Q.
0
Q. "As-Staked" Plan prepared by the Contractor, checked by the concerned UPMO Cluster and approved at the Central Office
Q)
:S
a
--
Q)
co
..••..•...
e
Q) ~AN08U8IofTTED:
<LOGOIS> <LOGOIS> 0'''''''' """"'" """",", ,",",He.
E
~ -.-.-"
e
(SEE COVER SHEET) •••• COlIER 8HE£T) (SEE CO'v'ER SHEET)
<S~n.tRE OVERNAME> <StGNA.llJRE OVER NAME> ~~~.:::aMllilHWAYI <SfGNAruRE OVER NAME>
.~
<SIGNATURE OVER NAME> <SIGNATURE OVER NAJ.tE>.
...•"".
...•••.•. .....,a..•..•. .~
<NAY,>
E <~~
."
"""""'- <CONSUl TANT/S> l'lflO.IECT"""'OER
....,""""" DIlT!' 1lUREAlJ00OE&lGfrol
->
E 1M"
M"-""""'" _.'""""'"
o
I') 40.00 J 44.00 40.00 J 44.00 47.00 J 63.00 I 44.00 J 44.00 44.00 J 44.00 44.00 L 44.00 17.00
L
549.00
HAs-Staked"Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by the
Consultant, checked and recommended by UPMO, and approved at the Central Office
I Annex "1- 1· I
...•......•. Pfk).JfCTNIIUE'IlNDLOCATlOf.I
~"""""'"
tit
".,.,..,
--- ...-.. -- - "ro •• •••m'o,
_.
<l000lS>
-
<CONTRACTOIlJS>
50.00
<SIGNATURE OVER NAME>
- """'"'-
50.00 51.00 51.00
~~~~"
......"....-.. ......
53,00
<SIGNATURE OVER NAME>
~=
PROJIECTENGIN!EII
52.00
<SIGNATURE OVER NAME>
M=
CIWF.~SIiC1tDN>'
52.00
<SIGNATURE OVER NAME>
M=
CItIlII'f'l,NNNGI'Hl~HC11CN
52.00 I
<SIGNATURE OVER NAME>
~=
ASIlI5TANTml>I1QI;Ta«ON;lOR
52.00 I
<SIGNATURE OVER NAME>
~=
Dliffll!;T~
52.00
@
I 17.00
e
I 17,00
549.00
~
"
c.
0 Revised Plan prepared by the Contractor and approved by the District Engineering Office
c.
"
:5
0
"
0>
PftS'Il."l!D; PROJECTNo'lMEHlDl.OCAllON: eHl!ETOONTENI"a:
tit
CHrQCED: ......., - -......... -, "'oo. ~"',
e
<LOGo.'S>
E
e <SIGNATURE OVER NAME> ~~~
....•..•.. ......
..",.,,-
.... " <SIGNATURE OVER NAME> <SlGNA1\JRE OVER NAME> <SIGNA 1\JRE OVER NAME> <SIGNA 1\JRE OVER NAME> <SIGNATURE OVER NAME>
@
E
E
o
-
<CONTRACTORIS>
- """'"'''''''''''' ~=
"""""- M=
Cttti',<IIIII"t£Il9mN~
~=
CHl:f,~J\M)DElifQHIIIOC11ON
~=
••••• TI\HT~P«JIEER
~=
llImU::TINQ~
'" 50.00 50.00 51,00 51,00 53.00 52.00 52.00 I 52.00 I 52.00 I 52.00 I 17,00 I 17,00
L
549.00
Revised Plan prepared by the Contractor, concurred by the Design Consultant and approved by the District Engineering Office
<l000lS>
...•......•. ~JW.lI;/<MOLOCAT\OfrI;
S><HT"""",""
tit '''''''''' """""" """"""'" -, "ro •• ~"',
<CONTRACTORIS>
50.00 I
<SIGNATURE OVER NAME>
PROJECT w.HN3ER
<DlOlRlCT_
....•..•..
53.00
- -
OI'I'l.IaI:WQMSANI)
••••••
••••••.
I
<SI~_'lt""'"
54.00 I
<SlGNA1\JRE OVER NAME>
Ctfit",I'lAJININli'NrlD~1lMSlON
52.00 I
<SIGNA 1\JRE OVER NAME>
IJI5IItK;T~
52,00 I
<SIGNATURE OVER NAME>
MiIRI1NlT~~IUK
52.00 I
<SIGNATURE OVER NAME>
Rt.liIUtW.llMt.~'lJK
52.00
@
I 17.00
e
I 17,00
549.00
Revised Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned Regional Office
<LOOOIS>
"IlOJtCTNMlEANOl.ClCATlON'
~"""""'"
It ""'-, ...•.... -, .....-.. _ .
",oo. ~ •..
-
<CONTRACTORIS>
50.00
<SIGNATURE OVER NAME>
PROJECTIAANAGSl
~
<IlBlIJlrW.OFFlCEItiI
....•..•..
.•.
EJrQ&IlNGOf'f'P.>
53.00
<SIGNATURE OVER NAME>
PROJECT ENONBI
52.00 I
<SIGNA1\JRE OVER NAME>
~. <IlIII"LeIIENT
52.00
samtlN>
<SIGNATURE OVER NAME>
ctIEf·~MDDalGN5ECJIIJN
52.00
<SlGNA1\JRE OVER NAME>
tllimlCTENlJIrIi:ER
52.00
<SIGNATURE OVER NAME>
IlEOICltW.IlMECTOFl
52.00
@
17.00
e 17.00
549.00
Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked by the District Engineering Office and approved by the concerned Regional Office
<LOllOIS>
PJIOJECTNAMEANOtoCATlt:»l
MOT""""""
e """,",. ......., _ . _. .......... ",on ....,'"
-
<CONl1lACTORIS>
50.00 I
<SIGNATURE OVER NAME>
-
PAO.eCTMANAGER
I
.........
••••••••• 0fftCE
53.00
•••
<SIGNATURE OVER NAME>
I'ftO,JfCTENONDl
52.00
<SIGNATURE OVER NAME>
CH&, •••• PIJiMEHl'JrIGDMlIfl,1N>
52.00
<SIGNATURE OVER NAME>
~.P\AMDlGN&lI*IIiilt~
52.00
<SIGNATURE OVER NAME>
- ASIISTANTf£QOfrW.DlftEII;fCR
52.00
<SIGNATURE OVER NAME>
--
REGIOIW..DllECTCIt
52.00 I
@
17.00
e
I 17.00
549.00
~
'a.
" Revised Plan prepared by the Contractor and approved by the Regional Office
"
Q.
'"
:5
0
'"
"'"" <LOllOIS>
PIIOPARED', I'IlOJECTNoIIMEN-IDtoCATlflIlI: 8H!ETCONT1!NfS:
e """"'"
......., ...- - - ""on ...,'"
e
E
2
@
...•..
--
~~~~HllJ"'Yl
<SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
<CONTRACTORIS> "',,,,,,,"',, <flEGOW.QFfICENo.>
"'"""',.- ~,~CWIIiICN> ASBIITANTflUlIDIW..llI'CCJ'CR
--
cteF.f'I.}I,~NfDtJUIGIIlatYIBICN
--
REOIClIMl.DlRECTlJIiI
E M_ M_
E
o
'" 50.00 I 50.00 I 51.00 51.00 53.00 52.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00
L
549JlO
Revised Plan prepared by the Contractor, concurred by the Design Consultant and approved by the Regional Office
<l0ll0lS>
<CONTRACTORIS>
-
-
•..•..
e
*"","-,~~...;::::s_Yl
.......... •..
"""""""""'
O£m>,
~~>
SIJlIIjf'f1'B):
>
........ ,.
<SIGNATURE OVER NAME>
................
CNl!F..••••••••••.•••
""'uDl<_~
""""""""
llIft!CTOR~ut"CI:BUI'I
(SEE COYER SHEET)
A861S'~"H'f'OIIiI
M_ """'" """"'"
--
1_-
(SEE COolER SHEET)
~"'"
""""""', ..
,,""
@
"''''
e
••• ro".
50.00 50.00 45.00 I 45.00 I 53.00 I 45.33 I 45.33 45.33 45.33 45.33 45.34 17.00 17.00
549.00
Revised Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office
<l0ll0lS>
f'RfPAR!D; PlIO.ECT NME NolOLOCATION' ...,- It
O£m>,
-- """"""'"
~ "''''
...,.•..
e
~~ME> (SEE COVER StEET) (SEE COVER SHEET) (SEE. C<>JER SHEET)
<CQNTRACTORIS>
<SIGNATURE OVER NAME>
PMO.ECT UANAQER
~~...:;e...;::::s.••.•
.••.•.....
_0fftCE •••
Kr.
"""""",
>
<SIGNATURE CM:R NAME:o-
CHIEF,<OONCB'lNEDDl!i1llVH1JIVBDt,P
na." 8I.IlENJOFOE6IElN
<SIGNA~~NAME>
--
~MtCftlB!llClN
..-
ASIlISTSR'rM«R;lIIl
TI!CHNCAlBeIi'llk:a;
~rfR,"",
TECtfMlOl,L llElMa!8
@
50.00 50.00 45.00 45.00 53.00 45.33 I 45.33 I 45.33 I 45.33 I 45.33 I 45.34 I 17.00 I 17.00
549.00
Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the Regional Office and approved at the Central Office
e
<toOOIS>
••••••••• /f'ME> (SEE COVER St£ET) (SEE COVER SHEET) (SEE COVER SHEET)
~~~.::::slQlllAn @
-
<SIGNATURE OVER NAME> <SIG~TURE CNERNAME> <SIGNA~~ NAME>
<CONTRACTORIS>
~
Pl'IO.ET~ .-J""",,,,"
.......... )0
ctIEF.~Dl:IllQNDMIIlCN>
nt.TI' 1II.JAP,lJ0f'0ESIlilN
~D ~
~crtlR~OFDB!IGN
~D
ASSST~Mn'FOR
••••••••• """"'"
•••..•••
~FOM
lECtIIflOI\l.SlIMCEB
50.00 50.00 45.00 45.00 53.00 I 45.33 45.33 45.33 45.33 I 45.33 I 45.34 I 17.00 I 17.00
.,~
0.
Revised Plan prepared by the Contractor, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
549.00
o
.,
0.
:5
.,
-,
0
.,'"
"0
-- ","""", .......", ..•.."'.
tit
PItOJECTtMME/VVlOCATIOH, stEETCQN'lENT8;
""""""'" ""'"
e
<LOGOIS>
E ~~ME> (SEE COVER SfoEET) (SEE COVER SHEET) (SEE COlfER SHEET)
o
J: <SIGNATURE OVER NAME> ~~~.::::s " ..•......
.••••. <SIGNATURE CNER NAME> <SIGNATURE OVER NM4E>
@
E
E
o
<CONTRACTORJS>
~
l'ftOJECTMANAOER .-J""",,,,"
....",.....
CHEJ',~DElIICNl:WII9lON>
••••.••• 8IJIIIElWOFDEI8IQM
~
",:,::,;r: ~t:TUR~OFDS5ION
~D
~D
ASI!AST~"-R'(RlR
"""""" ••••••••
~~~
"""""' ..""'"
'" 50.00 I 50.00 45.00 45.00 I 53.00 I 45.33 I 45.33 I 45.33 I 45.33 I 45.33 I 45.34 I 17.00 I 17.00
L
549.00
Revised Plan prepared by the Contractor, concurred by the Design Consultant, checked and recommended by the concerned UPMO Cluster and approved at the Central Office
e
<LOGOIS> <tooo/s>
_ COlIERllI<EE'T) (SEE COlIER SHEET) (SEE COVER SHEET)
i ~t;t;T CONTENT;
<CONTRACTQRIS>
<S~TURE
PROJeCT~
OVERNAUE•.
<CONSU~ANT'S>
<SIGHA. lURE OVER NAME>
FftOJECTw.tWER
lII'~":":~~ttlIIMA
.....,
....•......
CWS1ER>
<SIGNATURE OVER NAME>
~"
- <SIGNA. T\JRE OYER
""""' .. """"
IIWl£> <SIGNA TIJRE OIlER NM,4E>
~UI'WIOCl.USTl!fl.>
~.~> ~>~>
-""''''''''''''
~ •• ~>
"""""""""'"
40.00 I 44.00 I 40.00 I 44.00 I 47.00 I 53.00 I 44.00 I 44.00 I 44.00 I 44.00 I 44.00 44.00 I 17.00
549.00
Revised Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by the
Consultant, checked and recommended by UPMO, and approved at the Central Office
I Annex"J _1" I
<LOGOIS>
..•.....•• PI'tOJECT"""""NIOI.OC:II"TIClN 9HEElc:otm:NTS:
e """"'" - ~.
"""""" """"
....,...
.-
<CONTRACTOR/$>
55.00
<SIGNATURE OVER NAME>
MW
"""""-
52.00 73.50 73.50
----
~,.,=:::;e::e.:::::a
••••
.........
<tllS'I1lCTlOlOIEEANloma;:~
53.00
Yl
<SIGNATURE OVER NAME>
MW
PAOJECTENON£R
52.00
<SIGNATURE OVER NAME>
Mtt
CI'W.~11ICil5lCl'lJNl>
52.00 I
<SIGNATURE OVER NAME>
Mtt
AS9IITAN1Ol3"TR1CTE~
52.00
<SIGNATURE OVER NAME>
Mtt
DIlITR£TiNOlllHIt
52.00
@8
17.00 17.00
549.00
~
••
Q.
0 "As-Built" Plan prepared by the Contractor and approved by the District Engineering Office
Q.
••
0
••
'" -- ....,.~ ""' •.....
-- - ....,..•.
E
<LOOOIS>
PllOJEC'TfrWoIE,\N01..OCA1'lOH;
It
~:~""Yl
""""",,, """"
e <SIGNATURE OVER NAME>
......•••
<SIGNATURE OVER NAME>
.~
<SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
""""" ...••.•. <SIGNATURE OVER NAME> <SIGNATURE OVER NAME>
@8
- """""
..•..•.•. -
<CONTRACTORIS> I'RlJECTENl3INEER D'IEF.~JJNG8ECQl.lN> ASSlBTANTfIE(lIOIoW.~lUJ( REQIDtW..~crgf
E
E
<OOTRICTENGf&IlItGOFR::E"
~~
o
'" 50.00 I 50.00 I 51.00 I 51.00 53.00 I 52.00 I 52.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00
L
549.00
"As-Built" Plan prepared by the Contractor, checked and recommended by the District Engineering Office and approved by the concerned
Regional Office
<LOGOIS>
.....•.• PRO.ECl' NAUE /\NO U)(;A:11ON
"""-
It '""""'" - """"""'" """""" "'''''
....,00.
<C~~ORIS>
<SlGNA.TURE
PRO.ECT
OVER NAME>
wtWJEft
~~~.:::::a~",
.........
""""""""',."
<SIGNATURE OVER NAME>
PftWECTellill'El<fl
<SIGNATURE OVER NAME>
cttI:F_~'N:lIll'lBlON"
<SIGNATURE OVER NAME>
Mtt
A5S151Hf1lt1:U1ONN,l;IIHH;llJW
<SIGNATURE OVER NAME>
Mtt
IIEQIJNN.[Mt.CHJH @8
55.00 52.00 73.50 73.50 53.00 52.00 52.00 52.00 52.00 17.00 17.00
549.00
"As-Built" Plan prepared by the Contractor and approved by the Regional Office
<CONTRACTORIS:>
<SIGNATURE OVER NAME>
"""""-
lJEI'AlmIEIff~...:1~ttelflIrA'fl
..•..•.•.
"""""'''''''',."
<SIGNATURE OVER NAME>
""""" ...•.... <SIGNATURE OVER NAME>
ctIl&',.cIMPLEIENllNOlJtIBCN>
<SIGNATURE OVER NAME>
R£GllCltW.DIlECT'QR
<SIGNATURE OVER NAME>
A8lI8TNIT~TNn'I'I;JfI
RE~0fI£M1'IClNIlI
<SIGNATURE OVER NAME>
~_
-"""'''''''
••••.•• FOR @8
50.00 I SO.OO I 51.00 I 51.00 I 53.00 I 52.00 I 52.00 I 52.00 I 52.00 I 52.00 I 17.00 I 17.00
549.00
'As-Bui"" Plan prepared by the Contractor, checked and recommended by the Regional Office and approved at the Central Office
I Annex"J - 2" I
e
(SEE COVER SHEET) (SEE COVER SHEET)
-
<CONTRACTORJS>
-
-..a_
<SIGNATURE OVER NAME> ~~...:..c~ .....• <SIGNATURE OVER NAME>
.....,.........
"tl
""""" ...•....
~n
<SIGNATURE OVER NAME>
~n
~T __
<SIGNATURE OVER NAME>
~n
PIKlJI!CTt8II:CTCIt
......,"""""
<SIGNATURE OVER NAME>
- ,,"">C•••••.••••
A8lIIlITIMT a:ao:l,1oftY RlR
<SIGNATURE OVER NAME>
~~ ....••..•."""
~I"""'FOR @
50.00 50.00 51.00 51.00 53.00 52.00 52.00 52.00 I 52.00 I 52.00 I 17.00 I 17.00
549.00
...I>
a.
0
a.
"As-Builf' Plan prepared by the Contractor, checked by the concerned UPMO Cluster and approved at the Central Office
I>
•...
I>
e
E (sa: COVER SHEET) (E£ rovER SHEET)
e
E
E -
<CONTRACTORIS>
<StGNAnJRE OVER NAME'
~n
l'ROJECTWoWlI38'I <CONSUlTANT/$>
~n
-..a_
<SaGNAruRE OVER NALfE>
,~
lIIlWmIENr~~.:;:::s""A
.....,cws_
..........
<StGNATURE
~n
OVER NAME> <SIGNA.11JRE OVER NAME>
~~ ~n
<SlGNt.TURE OVER NAME>
....,""""'" non:
...•"".
VPMO OPERAlION$
...•"" .
lAIOOPEMTJ:Ml
@
o
..., 40.00 44.00 40.00 I 44.00 74.00 I 53.00 44.00 I 44.00 I 44.00 I 44.00 I 44.00 I 17.00 I 17.00
L
549.00
"As-Built" Plan for UPMO implemented projects with Construction Supervision Consultant, prepared by the Contractor, checked by the
Consultant, checked ~nd recommended by UPMO, and approved at the Central Office
NOTE: r
THE ABOVE DATA ARE FOR REFERENCE ONLY. THE PROCURING ENTITY DOES NOT
GUARANTEE THAT THESE DATA ARE FULLY CORRECT, UP-Te-DATE, AND APPLICABLE
TO THE PROJECT AT HAND. THE CONTRACTOR IS RESPONSIBLE FOR THE ACCURACY
AND APPLICABILITY OF ALL DATA, INCLUDING THE ABOVE, THAT IT WILL USE IN ITS
DESIGN \ ~UILD PROPOSAL AND SERVICES.
L-------\--------~-~----~-------__J-
USE 1.25 mm FONT SIZE
IAnnex "K - 2"1
LIABILITY WAIVER
TO BE SIGNED BY THE DESIGN
CONSUL TANT/S FOR DETAILED ENGINEERING
DESIGN PLANS
NOTE:
fI
PURSUANT TO ITEM 5 OF ANNEX 'A' OF THE REVISED IMPLEMENTING RULES
AND REGULATION OF RA. 9184, THE APPROVAL BY THE AUTHORIZED
GOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNS
UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF
THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING
OFFICIALS. el
e~
gi!
THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE I
STRUCTURAL DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO
~
~
FAULTY AND/OR INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE
CHANGES MAD WITHOUT THE CONFORMITY OF THE CONSULTANTS. i
I
I
I
~-------
PROJECT MANAGER
<Consultantls>
~OO~
------------------------------1
rI
J
USE 1.25 mm FONT SIZE
IAnnex "K - 3"1
NOTE:
~
\ \
PROJECT MANAGER
<Contractor/s>
~~
-------------------~-----_1 I
'--- USE 1.25 mm FONT SIZE
IAnnex "K - 4"1
LIABILITY WAIVER
TO BE SIGNED BY THE CONSTRUCTION SUPERVISION
CONSUL TANT/S
FOR "AS-STAKED" AND "AS-BUILT" PLANS
NOTE:
PROJECT MANAGER
<Consultanl/s>
1--
~OO~
-------~~~--~--------.~~_._._--~---I I
USE 1.25 mm FONT SIZE
IAnnex UK - 5"'
;-r
NOTE:
PURSUANT TO ITEM 7 OF DPWH DEPARTMENT ORDER NO. 50. SERIES 2002. THE
II
DETAILED ENGINEERING DESIGN CONSULTANT ISSUE THIS NON-OBJECTION TO VARY
TO THE RECOMMENDATION OF THE IMPLEMENTING OFFICE. INCORPORATING MAJOR
CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT IMPLEMENTATION
PROVIDED. HOWEVER. THAT THIS ISSUANCE WILL NOT RELIEVE THE ENTITY WHICH
I
DESIGNED THF CHANGES OF ITS RESPONSIBILITY FOR SUCH. ~I
81
CONCURRED BY:
~I
PROJECT MANAGER
<OED Consullantls>
75.00mm
USE 1.25mmFONTS/ZE
IAnnex "K - 6" I
NOTE: TI
PURSUANT TO ITEM 7 OF DPWH DEPARTMENT ORDER NO. SO, SERIES 2002, THE I
DETAILED ENGINEERING DESIGN CONSULTANT ISSUE THIS NON-oBJECTION TO VARY
TO THE RECOMMENDATION OF THE CONSTRUCTION SUPERVISION CONSULTANT,
II
Il
INCORPORATING MAJOR CHANGES IN THE ORIGINAL DESIGN DURING THE PROJECT
~
IMPLEMENTATION PROVIDED. HOWEVER, THAT THIS ISSUANCE WILL NOT RELIEVE el
THE ENTITY WHICH DESIGNED THE CHANGES OF ITS RESPONSIBILITY FOR SUCH. ei
gi
CONCURRED BY:
~I II
i
r
I
PROJECT MANAGER
I
r
<OED Consullantls> I
J
\
L----~--\-----~---_. 75.00mm
<ADDRESS> H-6.4Omm (
SIyIe-AliaI
TextHeIght.6.4Omm
)
Style, Arlal )
<UPMO CLUSTER> H=7.8Omm ( TextHeight=7.BOmm
<ADDRESS> H=6.4Omm (
Style. AliaI
Text HeIght. 6.4Omm
)
MANILA SIyIo-Arial
H=6.4Omm ( Texl~t>6.4llmm
)
<SECTION>
<LOCATION>
<NET LENGTH>
I H=3.Omm
SCyIe=Arial
( T""t Heigh!= 3.00•••
)
H-4.4Omm
styIo = ArioI Bold
( TextHeight=4.40mm
)
H-3.00mm
styIo- Ariel
( Text ~h!> 3.00mm
)
H-2.5Omm
styIo Arial )
SUBMITTED: RECOMMENDED: ( TexIH.-=2.50mm
APPROVED:
70.00 72.00 96.50 72.00 96.50 72.00 70.00
DATE DATE
95.00
50.00
•.. Ii;
"
a. a.
"
a. "
a.
" "
:5
'0
"
.gI-
50.00
~:~=
H-1.<lIlmm
~=:=)9l*i)
("",--0 :5
'0
"'"
"0
"
E
"E
~o 60.00
~
E E
DANILO L. BALlSI H-2.Mrnm (,.._ArilIfBold)
52.00
...•..
QJ.C.·MiBIllT"'NT~TOIt,
"""""'
H-1.llQmm (_._)
."""
52.00
(SEE COVER SHEET) •••. 2.00mm (Stolte .,..)
52.00
(SEE COVER SHEET) H-2.00mm (_._)
(_
GlLBERTO S. REYES
AAaTANT
FOR l£aNCAL
••••••
SliCfllITARY
52.00
H-2.00mm
8SMCES
H-2.5Ilmm
H-1.&omm
.-
(St,.• '"MIl)
••• )
{~-...w~ H-2.5Omm
(_ •••••• H-l.ljllmm E~~~~~~OI
OPeRATIOIrflj;NmT'ECHNI::;.O.l saMCES
(_.~ H-l.!lOnm
<_.-0 H-1.51lmm
52.00
(~"AriII~ H-2.00mm
Roclua of Clrcte - 7.00mm
(•••.-0 H-l.5Ilmm
44.00
~ ~
••o
Q. ••
0-
Q.
o
••
:5
.,
0-
:5
74.00
'0 '0
.,
t H_1.5Omm
H-1.70rTwn
( __
(St)IlI.
c ArllIIHImIw, 0I'IIll:w. hforpoteds
MalNlnow,o..o."<DISTRICT
'*"-~
ENGlNEEflINGOffICE>o"
bytltRllgloNfOfllo&..
_ <REGIQNIf.L OFfCE
UPMOo.-.OI eu..uGf~
NO.:>-, l$If#;)<ClLlSTER» lit BUREAU Of oesaJN ~ IIDwhiCtl f:IlIU ~ "PfOtIclplen .,'"
-0
! 53.00
E
o
.l:
44.00
c:~TIJRE
44.00
OVER NAME:>- H-2.00rnm
H-l.5Omm
-1
(SI)4t•.•••.••BotJ)
(••••• _)
"NIIlII
H-UIOmm (~·MII}
~
••o
Q.
Q.
••
-••
:5
o
'"••
-0
E
o
.l:
E
E
,..,
o