CHARMS- Change Request Management: - Developement (ECC flow)- Non-Emergency Process:

Transaction types used: (YMHF(old)/YNHF(new))


Below are the available statuses in WebChCRQs
Created
 Check if any one of DRD (Detailed Requirement document)/BRD (Business Requirement document) documents are
present in CSM based on project type.
SDD/FS In-Progress
SDD/FS Completed
 SDD/FS author will upload SDD/FS document in CSM under respective Object ID or upload it’s url in AC
SDD/FS Approved
 COE/SDD/FS approvers will approve the SDD/FS
TDD in progress
 Developer has to prepare and upload 3pt estimate document in CSM and update it’s URL in the attachment section
of AC.
TDD completed
 Developer has to prepare and upload TDD document in CSM and update it’s URL in the attachment section of AC.
TDD Approved
 Standard Cooper Automobiles team will review and approve the TDD
Development in progress
 Developer has to create customizing/Workbench TR in CRD 110 and captured required objects in it.
 Developer or Team lead will update the code start, TDD completion and code completion dates.
 Perform Q certify check before release the TR from CRD
 Developer has to prepare and send his objects for internal/Peer/Tech lead/SQA reviews and upon completion of SQA
review upload TP, Standard Cooper Delivery Note(ADN) documents in CSM and update their URLs in the attachment
section of AC.
Dependency Check (QA)
 Pass – To ensure objects planning to move to higher system do not have any kind of object dependencies. Use T-
code YTRDEPCHECK to check object dependency from CRD 110.
Integration Testing in Progress/ End to End testing In Process
 TR will move from CRQ to CRQ when AC status set to “End to End testing In Process”
User Testing In-Progress
 Email will be triggered to user who is doing UAT -
User Testing Completed
 CRP move date
 Attach UAT email
 COE Approver - Non Emergency (Field Update)
 Dependency Check (REG) - Pass
Regression Testing in progress -
SAPTRL1 team will move all TRs from CRQ to CRS on every Tuesday 4.30pm IST
 ART (Standard Cooper regression Team –Standard Cooper Automobiles) will run regression scripts/BPCA tool to
perform regression testing and then update below field status accordingly
 Regression testing Status (Field Update) – Pass/Fail/On Hold
 Production Manager Approval - Non Emergency - Friday day
Confirm to Production:
 TR will be moved from CRS to CRP on Sunday 11 AM IST on TR weekly role dates.

In Warranty - Automatically changed to In warranty


Closed – Automatically changes status to closed based on warranty period provided in AC
Cancelled – if requirement is cancelled by business or wrongly created ACs can be cancelled with proper justification by
updating in Notes section of respective AC
CHARMS FLOWCHART

SMARTFORMS

Tables and Fields to the Abaper


An example of an
Incoming Traveler
generated by
Order Admin (OE)
, showing the
Various
Document
Numbers created.
This will be
printed and be
attached to the
Engine as it
passes through to
repair.
FUNCTIONAL SPECIFICATION

Table of Contents

1 CHANGE HISTORY............................................................................................................................................3
2 DOCUMENT SUMMARY..................................................................................................................................3
2.1 G1112..............................................................................................................................................................4
3 BUSINESS OVERVIEW.....................................................................................................................................4
3.1 G1112..............................................................................................................................................................4
4 ASSUMPTIONS....................................................................................................................................................6
5 OUTSTANDING ISSUES....................................................................................................................................6
6 RISKS.....................................................................................................................................................................6
7 FUNCTIONAL REQUIREMENTS....................................................................................................................6
7.1 BASE BUSINESS OBJECT(S).............................................................................................................................6
7.1.1 G1112......................................................................................................................................................6
7.2 PROCESSING LOGIC.........................................................................................................................................7
7.2.1 G1112......................................................................................................................................................7
7.3 DATA MAP......................................................................................................................................................8
7.4 CUSTOM CONFIGURATION TABLES (YROT_VARV, ETC).............................................................................8
7.5 RELATED CUSTOMIZATION..............................................................................................................................9
7.6 SECURITY CONSIDERATIONS...........................................................................................................................9
7.7 EXCEPTION HANDLING....................................................................................................................................9
7.8 ERROR HANDLING...........................................................................................................................................9
7.9 EXPECTED DATA VOLUMES............................................................................................................................9
7.10 RE-RUN OPTION............................................................................................................................................10
7.11 ADDITIONAL COMMENTS..............................................................................................................................10
8 OBJECT SPECIFICATIONS............................................................................................................................10
8.1 GENERAL CHARACTERISTICS........................................................................................................................10
8.1.1 Access Method......................................................................................................................................10
8.1.2 Output Management..............................................................................................................................10
8.1.3 Describe Special Requirements............................................................................................................10
8.1.4 List of Related Objects..........................................................................................................................10
8.2 ENHANCEMENT SPECIFICATIONS (REQUIRED ONLY FOR ENHANCEMENTS)..................................................10
9 TEST CONDITIONS..........................................................................................................................................19
10 GLOSSARY.....................................................................................................................................................20
Versio GAP Description of Change Prepared By Business COE
n Number & Date Reviewer & Reviewer By
Date & Date

1 G1112 Initial Draft zomcurt

2 G1112 Change in field of item

1 DOCUMENT SUMMARY
Functional Specification ENH00004
ID
Functional Specification Zomcurt creation.
Title
Request Type Report Enhancement Form
Interface Conversion
GDM Process ID
GDM Process Description Zomcurt creation
Reference Document(s) Gap 1110
Affected Business order management Distribution
Models Aftermarket
Other ___________________________