Rencana Harian Pacal: No Lokasi Kerja
Rencana Harian Pacal: No Lokasi Kerja
Desember
No Lokasi Kerja
15-Dec
16-Dec
17-Dec
18-Dec
19-Dec
20-Dec
21-Dec
22-Dec
23-Dec
24-Dec
25-Dec
26-Dec
27-Dec
28-Dec
29-Dec
30-Dec
31-Dec
1 AP 1A Bs S1
2 AP 12 Bs Bs S1
3 AP 17 Bs Bs S1
4 AP 22 S4 Bs Bgs S5 Bs Bgs S6 Bs Bgs S7 Bs Bgs S8 Bs Bgs S9
5 AP 22 Pilar S1 Bs Bgs Bgs S2 Bs Bgs Bgs S3 Bs Bgs Bgs S4
6 AP 23 S5 Bs Bgs S6 Bs Bgs S7 Bs Bgs S8 Bs Bgs S9 Bs Bgs S10
7 AP 23 Pilar Bs Bgs Bgs S1 Bs Bgs Bgs S2
8 AP 27 Sirtu LC Bs S1
9 AP 32 Sirtu LC Bs S1
Bgkr Bgs
Bs Bgs S2 Bgkr Bgs Bs Bgs S3 Bgkr Bgs Bs Bgs S4 Bgkr Bgs Bs S6
AP 27
F
RENCANA HARIAN PACAL
Desember
No Lokasi Kerja
17-Des
18-Des
19-Des
20-Des
23-Des
24-Des
25-Des
26-Des
27-Des
29-Des
30-Des
31-Des
15-Des
16-Des
21-Des
22-Des
28-Des
1 AP 1A Bs S1
2 AP 12 Bs Bs S1
3 AP 17 Bs Bs S1
4 AP 22 S4 Bs Bgs S5 Bs Bgs S6 Bs Bgs S7 Bs Bgs S8 Bs Bgs S9
5 AP 22 Pilar S1 Bs Bgs Bgs S2 Bs Bgs Bgs S3 Bs Bgs Bgs S4
6 AP 23 S5 Bs Bgs S6 Bs Bgs S7 Bs Bgs S8 Bs Bgs S9 Bs Bgs S10
7 AP 23 Pilar Bs Bgs Bgs S1 Bs Bgs Bgs S2
8 AP 27 Sirtu LC Bs S1
9 AP 32 Sirtu LC Bs S1
RENCANA PENGECORAN (hingga 31/12/2021)
No Blok Stage Tanggal Volume
AP 12 Stage 1
AP 17 Stage 1
1 Sunday, December 19, 2021 325
AP 22 Stage 5
AP 23 Stage 6
2 AP 22 Pilar Stage 2 ### 86
AP 22 Stage 6
3 ### 180
AP 23 Stage 7
4 AP 1A Stage 1 ### 140
AP 22 Pilar Stage 3
AP 23 Pilar Stage 1
5 Friday, December 24, 2021 195
AP 27 Stage 1
AP 32 Stage 1
AP 22 Stage 7
6 ### 175
AP 23 Stage 8
AP 22 Stage 8
AP 22 Pilar Stage 4
7 ### 220
AP 23 Stage 9
AP 23 Pilar Stage 2
AP 22 Stage 9
8 Friday, December 31, 2021 285
AP 23 Stage 10
TOTAL 1,606.00
1606
Volume Total 5,731
Realisasi Bronjong 3,945 -
Sisa Pekerjaan 1,786 m3
DEVIASI
Rencana Bronjong Nov
Realisasi Bronjong
Realisasi Bronjong (23/11/2021) 2830,5
Rencana Bronjong (30/11/2021) 1169,5 +
4000 m3
DEVIASI
Rencana Bronjong November 5731
Realisasi Bronjong 4000 -
1731 m3