20 mm

Sr. Quantity In Cum. Cement Cum. Of Cement Agg. In Cum. Of 20 10 mm Cum. Of 10 mm Cum. Of Sand Flyash in Cum. Of Admixtu Cum. Of
No. DATE Month CH. No. Year Pedestal Raft Grade Part Of Structure m3 Quantity In Bag Bag Kg. mm Agg. Agg. In Kg. Agg. Sand In Kg. In Kg. Kg. Flyash In Kg. re In Kg. Admixture Remarks

27 01.03.20 March 0+115 2020 Indra Canal M-15 PCC Block Casting 21.00 698.50 0 2206 0 262933 0 175389 0 259093 0 0 0 1005 Subham

26 01.03.20 March Camp 2020 Casting Yard M-30 RCC Gantry Raft 16.50 715.00 118 2324 12293 275226 8200 183589 12095 271188 0 0 47 1052 Atepl Prod.

27 02.03.20 March Camp 2020 Casting Yard M-35 RCC Gantry wall 12.00 727.00 89 2413 8856 284082 5904 189493 8712 279900 0 0 40 1092 Atepl Prod.

28 03.03.20 March Camp 2020 Casting Yard M-30 RCC Pedestal Of Bed 4.00 731.00 29 2442 2980 287062 1988 191481 2932 282832 0 0 12 1104 Atepl Prod.

29 04.03.20 March Camp 2020 Camp M-30 RCC Weight Bridge Raft 6.00 737.00 43 2485 4470 291532 2982 194463 4398 287230 0 0 17 1121 Atepl Prod.

30 05.03.20 March Camp 2020 Camp M-30 RCC Weight Bridge Raft 2.00 739.00 14 2499 1490 293022 994 195457 1466 288696 0 0 6 1127 Atepl Prod.

28 05.03.20 March 0+115 2020 Indra Canal M-35 Pile Test Pile 32.00 791.25 0 2597 0 308777 0 205947 0 304613 0 0 0 1181 Subham

29 15.03.20 March 0+115 2020 Indra Canal M-15 PCC Block Casting 10.50 801.75 0 2597 0 308777 0 205947 0 304613 0 0 0 1181 Subham

30 19.03.20 March 0+115 2020 Indra Canal M-15 PCC Block Casting 8.00 809.75 0 2597 0 308777 0 205947 0 304613 0 0 0 1181 Subham

31 19.03.20 March 0+115 2020 Indra Canal M-50 RCC Pile Head 3.00 812.75 0 2597 0 308777 0 205947 0 304613 0 0 0 1181 Subham

32 20.03.20 March 0+115 2020 Indra Canal M-15 PCC Block Casting 16.50 829.25 0 2597 0 308777 0 205947 0 304613 0 0 0 1181 Subham

33 21.03.20 March 0+115 2020 Indra Canal M-15 PCC Block Casting 10.00 839.25 0 2597 0 308777 0 205947 0 304613 0 0 0 1181 Subham

34 21.03.20 March 1+449 2020 Khurdai Bajar M-35 Pile Test Pile 21.00 860.25 0 2597 0 308777 0 205947 0 304613 0 0 0 1181 Subham

1586 01.03.21 Mar 1+449 2021 LP4 M-35 RCC Pier Cap 68.00 24877.25 503 142025.5 39780 11969325 39780 10215988 52623 14439839 0 314275 226 64854 Atepl Prod.

1587 01.03.21 Mar 1+449 2021 LP3 M-35 RCC Pile Cap 75.00 24952.25 453 142478.5 46725 12016050 38325 10254313 56700 14496539 7200 321475 299 65153 Atepl Prod.

1588 01.03.21 Mar 13+163 2021 RA1/RA2 E-2 M-50 RCC I Girder 19.00 24971.25 171 142649.5 13034 12029084 8683 10262996 14497 14511036 0 321475 68 65221 Atepl Prod.

1589 01.03.21 Mar 19+923 2021 RCC M-15 PCC RCC bead Work 5.00 24976.25 18 142667.5 3385 12032469 2775 10265771 4105 14515141 310 321785 14 65235 Atepl Prod.

1590 01.03.21 Mar 5+383 2021 PCC M-15 PCC Cross Barrier 1.50 24977.75 5 142672.5 1232 12033701 833 10266604 1232 14516373 93 321878 4 65239 Atepl Prod.

1591 02.03.21 Mar 3+081 2021 RP1-3 M-35 RCC Pier Shaft 5.00 24982.75 37 142709.5 2925 12036626 2925 10269529 3855 14520228 0 321878 17 65256 Atepl Prod.

1592 02.03.21 Mar 5+383 2021 PCC M-15 PCC Cross Barrier 1.50 24984.25 5 142714.5 1227 12037853 833 10270362 1016 14521244 93 321971 4 65260 Atepl Prod.

1593 02.03.21 Mar 13+163 2021 LA2 M-45 RCC Pedestal 1.50 24985.75 13 142727.5 935 12038788 765 10271127 1128 14522372 0 321971 5 65265 Atepl Prod.

1594 02.03.21 Mar 15+404 2021 LA2 M-35 RCC Abutment Wall 1st Lift 12.50 24998.25 93 142820.5 9638 12048426 7313 10278440 7313 14529685 0 321971 42 65307 Atepl Prod.

1595 02.03.21 Mar 0+115 2021 A1 M-35 RCC Pile Cap 49.00 25047.25 296 143116.5 30527 12078953 24990 10303430 36848 14566533 4702 326673 196 65503 Atepl Prod.

1596 03.03.21 Mar 3+081 2021 RA1(M.C.W) M-40 RCC Pier Cap 35.50 25082.75 284 143400.5 24566 12103519 16366 10319796 27300 14593833 0 326673 121 65624 Atepl Prod.
Recd pnc Camp-1
1597 02.03.21 Mar 29+800 2021 RA1/1 M-35 Pile Pile 23.50 25106.25 0 143400.5 0 12103519 0 10319796 0 14593833 0 326673 0 65624 Atepl T.M
Recd pnc Camp-1
1598 02.03.21 Mar 22+062 2021 A1-A2 (LHS) M-35 RCC Beam No.15/16 (MNB) 10.00 25116.25 0 143400.5 0 12103519 0 10319796 0 14593833 0 326673 0 65624 Atepl T.M
Recd pnc Camp-1
1599 03.03.21 Mar 22+062 2021 A1-A2 (LHS) M-35 RCC Beam No.17/18 (MNB) 10.00 25126.25 0 143400.5 0 12103519 0 10319796 0 14593833 0 326673 0 65624 Atepl T.M

1600 03.03.21 Mar 3+081 2021 RP1-4 M-35 RCC Pier Shaft 5.00 25131.25 37 143437.5 2925 12106444 2925 10322721 3870 14597703 0 326673 17 65641 Atepl Prod.

1601 03.03.21 Mar 27+290 2021 LA2 M-45 RCC Pedestal 1.50 25132.75 13 143450.5 1133 12107577 765 10323486 935 14598638 0 326673 5 65646 Atepl Prod.

1602 03.03.21 Mar 3+081 2021 LP1/1 M-35 Pile Pile 24.50 25157.25 160 143610.5 14480 12122057 11834 10335320 17542 14616180 2524 329197 81 65727 Atepl Prod.

1603 03.03.21 Mar 19+923 2021 LA2 M-35 RCC Abutment Cap 32.00 25189.25 237 143847.5 18720 12140777 18720 10354040 24768 14640948 0 329197 107 65834 Atepl Prod.

1604 03.03.21 Mar 15+404 2021 PCC M-15 PCC RCC bead Work 2.50 25191.75 9 143856.5 1693 12142470 1388 10355428 2053 14643001 155 329352 7 65841 Atepl Prod.

1605 04.03.21 Mar 19+016 2021 Wall M-35 RCC Middle Wall 10.00 25201.75 74 143930.5 5850 12148320 5850 10361278 7710 14650711 0 329352 33 65874 Atepl Prod.

1606 04.03.21 Mar 15+404 2021 LA1 M-35 RCC Abutment Wall 9.50 25211.25 71 144001.5 5558 12153878 5558 10366836 7325 14658036 0 329352 32 65906 Atepl Prod.

1607 04.03.21 Mar 24+468 2021 LA1-LP1/E2 M-50 RCC IGirder 30.50 25241.75 274 144275.5 20923 12174801 13939 10380775 23150 14681186 0 329352 109 66015 Atepl Prod.

1608 04.03.21 Mar 1+449 2021 LP2/7 M-35 Pile Pile 20.00 25261.75 130 144405.5 11820 12186621 9660 10390435 14260 14695446 2060 331412 66 66081 Atepl Prod.

1609 04.03.21 Mar 5+383 2021 PCC M-15 PCC Cross Barrier 1.00 25262.75 4 144409.5 677 12187298 555 10390990 818 14696264 62 331474 3 66084 Atepl Prod.
A1-A2 (LHS)& A1-A2 Recd pnc Camp-1
1610 04.03.21 Mar 22+062 2021 RHS M-35 RCC Beam No.19 & BEAM/01/02 (MNB) 15.00 25277.75 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M
Recd pnc Camp-1
1611 04.03.21 Mar 19+016 2021 Wall M-35 RCC Middle Wall 7.00 25284.75 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M
Recd pnc Camp-1
1612 04.03.21 Mar 19+016 2021 A2 M-35 RCC Bottom Hunch 10.00 25294.75 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M
Recd pnc Camp-1
1613 04.03.21 Mar 17+009 2021 Wall M-35 RCC Wall 2nd lift 23.50 25318.25 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M
Recd pnc Camp-1
1614 05.03.21 Mar 29+800 2021 RA1/2 M-35 Pile Pile 23.00 25341.25 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M
Recd pnc Camp-1
1615 05.03.21 Mar 22+062 2021 A1-A2 RHS M-35 RCC Beam No.3/4/5/6/7 (MNB) 25.00 25366.25 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M
Recd pnc Camp-1
1616 05.03.21 Mar 22+062 2021 LA1 M-15 PCC Pile Cap PCC (MNB) 3.00 25369.25 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M
Recd pnc Camp-1
1617 05.03.21 Mar 22+062 2021 LA2 M-15 PCC 1/2/3/4 PCC 3.00 25372.25 0 144409.5 0 12187298 0 10390990 0 14696264 0 331474 0 66084 Atepl T.M

1618 05.03.21 Mar 27+290 2021 LA1 M-45 RCC Pedestal 1.50 25373.75 13 144422.5 935 12188233 764 10391754 1133 14697397 0 331474 5 66089 Atepl Prod.

1619 05.03.21 Mar 2+525 2021 RA2 M-35 RCC Abutment Cap 36.00 25409.75 266 144688.5 21060 12209293 21060 10412814 27828 14725225 0 331474 120 66209 Atepl Prod.

1620 05.03.21 Mar 3+081 2021 RP1-5 M-35 RCC Pier Shaft 5.00 25414.75 37 144725.5 2925 12212218 2925 10415739 3865 14729090 0 331474 17 66226 Atepl Prod.

1621 05.03.21 Mar 1+449 2021 LP2/8 M-35 Pile Pile 18.00 25432.75 117 144842.5 10638 12222856 8694 10424433 12888 14741978 1854 333328 59 66285 Atepl Prod.

1622 06.03.21 Mar 5+383 2021 RA1-RP1/RP1-RA2 M-35 RCC Deck Slab 117.00 25549.75 866 145708.5 68445 12291301 68445 10492878 90909 14832887 0 333328 390 66675 Atepl Prod.

1623 06.03.21 Mar 4+485 2021 RA1-RA2 M-35 RCC Deck Slab 91.50 25641.25 674 146382.5 53528 12344829 53528 10546406 71096 14903983 0 333328 305 66980 Atepl Prod.

1624 06.03.21 Mar 1+449 2021 LP2/5 M-35 Pile Pile 18.00 25659.25 117 146499.5 10638 12355467 8694 10555100 12942 14916925 1894 335222 59 67039 Atepl Prod.

1625 06.03.21 Mar 15+404 2021 LA1/LA2 M-2 M-50 RCC Igirder 9.00 25668.25 81 146580.5 6174 12361641 4113 10559213 6894 14923819 0 335222 32 67071 Atepl Prod.

1626 06.03.21 Mar 12+588 2021 LP2 M-45 RCC Pedestal 1.50 25669.75 13 146593.5 935 12362576 764 10559977 1140 14924959 0 335222 5 67076 Atepl Prod.
Recd pnc Camp-1
1627 06.03.21 Mar 22+062 2021 A1-A2 RHS M-35 RCC Beam No.8/9 (MNB) 10.00 25679.75 0 146593.5 0 12362576 0 10559977 0 14924959 0 335222 0 67076 Atepl T.M
Recd pnc Camp-1
1628 06.03.21 Mar 29+800 2021 RA1/3 M-35 Pile Pile 23.00 25702.75 0 146593.5 0 12362576 0 10559977 0 14924959 0 335222 0 67076 Atepl T.M
Recd pnc Camp-1
1629 07.03.21 Mar 22+062 2021 LA2-1 M-35 RCC 1Lift Pier Shaft 1.50 25704.25 0 146593.5 0 12362576 0 10559977 0 14924959 0 335222 0 67076 Atepl T.M
Recd pnc Camp-1
1630 07.03.21 Mar 22+062 2021 LA2-2 M-35 RCC 1Lift Pier Shaft 2.00 25706.25 0 146593.5 0 12362576 0 10559977 0 14924959 0 335222 0 67076 Atepl T.M

1631 07.03.21 Mar 1+449 2021 LA2 M-35 RCC Abutment Cap 40.00 25746.25 296 146889.5 23400 12385976 23400 10583377 30840 14955799 0 335222 133 67209 Atepl Prod.

1632 07.03.21 Mar 1+449 2021 LP3-1 M-40 RCC Pier Shaft 15.50 25761.75 124 147013.5 10726 12396702 7146 10590523 11873 14967672 0 335222 53 67262 Atepl Prod.

1633 07.03.21 Mar 3+081 2021 LA1 M-50 RCC Pile Head 1.00 25762.75 9 147022.5 686 12397388 457 10590980 759 14968431 0 335222 3 67265 Atepl Prod.

1634 07.03.21 Mar 13+163 2021 PCC M-15 PCC RCC bead Work 2.00 25764.75 7 147029.5 1354 12398742 1110 10592090 1636 14970067 124 335346 5 67270 Atepl Prod.

1635 07.03.21 Mar 17+009 2021 A1 M-35 RCC Side 4th Lift 18.00 25782.75 134 147163.5 10530 12409272 10530 10602620 13878 14983945 0 335346 60 67330 Atepl Prod.

1636 08.03.21 Mar 1+449 2021 LP2/6 M-35 Pile Pile 18.00 25800.75 117 147280.5 10638 12419910 8694 10611314 12888 14996833 1854 337200 59 67389 Atepl Prod.

1637 08.03.21 Mar 15+404 2021 LA1 M-35 RCC Abutment Wall 1ST Lift (S/R) 13.00 25813.75 97 147377.5 7605 12427515 7605 10618919 10062 15006895 0 337200 43 67432 Atepl Prod.

1638 08.03.21 Mar 15+404 2021 RA1 M-35 RCC Abutment Wall 2nd Lift 15.00 25828.75 111 147488.5 8775 12436290 8775 10627694 11610 15018505 0 337200 50 67482 Atepl Prod.

1639 08.03.21 Mar 15+404 2021 LA1/LA2 M-3 M-50 RCC Igirder 9.00 25837.75 81 147569.5 6174 12442464 4113 10631807 6867 15025372 0 337200 32 67514 Atepl Prod.

1640 08.03.21 Mar 1+449 2021 PCC M-15 PCC Crips Fitting Work 2.00 25839.75 7 147576.5 1110 12443574 1354 10633161 1642 15027014 124 337324 5 67519 Atepl Prod.

1641 08.03.21 Mar 29+800 2021 RA1/4 M-35 Pile Pile 6.50 25846.25 42 147618.5 3842 12447416 3140 10636301 4654 15031668 670 337994 22 67541 Atepl Prod.

1642 09.03.21 Mar 1+449 2021 LP2/4 M-35 Pile Pile 21.00 25867.25 137 147755.5 12411 12459827 10143 10646444 15099 15046767 2163 340157 69 67610 Atepl Prod.
Recd pnc Camp-1
1643 08.03.21 Mar 29+800 2021 RA1/4 M-35 Pile Pile 16.00 25883.25 0 147755.5 0 12459827 0 10646444 0 15046767 0 340157 0 67610 Atepl T.M
Recd pnc Camp-1
1644 08.03.21 Mar 22+062 2021 A1-A2 RHS M-35 RCC Beam No.10/11/12 (MNB) 15.00 25898.25 0 147755.5 0 12459827 0 10646444 0 15046767 0 340157 0 67610 Atepl T.M
Recd pnc Camp-1
1645 09.03.21 Mar 29+800 2021 LA1/1 M-35 Pile Pile 22.00 25920.25 0 147755.5 0 12459827 0 10646444 0 15046767 0 340157 0 67610 Atepl T.M
Recd pnc Camp-1
1646 09.03.21 Mar 17+009 2021 4Th M-35 RCC 2nd Wall 18.50 25938.75 0 147755.5 0 12459827 0 10646444 0 15046767 0 340157 0 67610 Atepl T.M

1647 09.03.21 Mar 3+081 2021 LP1/2 M-35 Pile Pile 26.00 25964.75 169 147924.5 15366 12475193 12558 10659002 18694 15065461 2678 342835 85 67695 Atepl Prod.

1648 09.03.21 Mar 0+115 2021 A2/3 M-40 Pile Pile 35.00 25999.75 240 148164.5 22260 12497453 14805 10673807 24640 15090101 3360 346195 108 67803 Atepl Prod.

1649 09.03.21 Mar 22+062 2021 LA2-1 M-35 RCC Pier Shaft Final Lift 5.00 26004.75 37 148201.5 2925 12500378 2925 10676732 3885 15093986 0 346195 17 67820 Atepl Prod.
1650 10.03.21 Mar 3+240 2021 S/R M-20 Karb 5.00 26009.75 24 148225.5 3115 12503493 2580 10679312 3805 15097791 440 346635 15 67835 Trans-From PNC T.M

1651 10.03.21 Mar 5+383 2021 LA1 M-35 RCC Abutment Cap 28.50 26038.25 211 148436.5 16673 12520166 16673 10695985 21974 15119765 0 346635 95 67930 Atepl Prod.

1652 10.03.21 Mar 13+163 2021 RA1 M-40 RCC Abutment Cap 31.00 26069.25 248 148684.5 21452 12541618 14291 10710276 23746 15143511 0 346635 106 68036 Atepl Prod.

1653 10.03.21 Mar 13+163 2021 LA1/LA2-E-1 M-50 RCC I Girder 19.00 26088.25 171 148855.5 13034 12554652 8683 10718959 14421 15157932 0 346635 68 68104 Atepl Prod.

1654 10.03.21 Mar 1+449 2021 LP3-2 M-40 RCC Pier Shaft Final Lift 15.00 26103.25 120 148975.5 10380 12565032 6915 10725874 11490 15169422 0 346635 51 68155 Atepl Prod.

1655 10.03.21 Mar 1+449 2021 RP3 M-35 RCC Pile Cap 62.50 26165.75 378 149353.5 38938 12603970 31875 10757749 47000 15216422 6000 352635 249 68404 Atepl Prod.

1656 10.03.21 Mar 1+449 2021 RP3 M-35 RCC Pile Cap 11.50 26177.25 85 149438.5 6228 12610198 6228 10763977 8867 15225289 0 352635 38 68442 Atepl Prod.

1657 10.03.21 Mar 1+449 2021 LP2/9 M-35 Pile Pile 18.00 26195.25 148 149586.5 11070 12621268 9054 10773031 13356 15238645 0 352635 59 68501 Atepl Prod.

1658 11.03.21 Mar 12+588 2021 RP2 M-45 RCC Pedestal 1.50 26196.75 13 149599.5 935 12622203 765 10773796 1118 15239763 0 352635 5 68506 Atepl Prod.

1659 11.03.21 Mar 13+163 2021 LA1 M-45 RCC Pedestal 1.50 26198.25 13 149612.5 935 12623138 765 10774561 1118 15240881 0 352635 5 68511 Atepl Prod.

1660 11.03.21 Mar 15+404 2021 PCC M-15 PCC RCC bead Work 2.50 26200.75 12 149624.5 1700 12624838 1393 10775954 2065 15242946 0 352635 7 68518 Atepl Prod.

1661 11.03.21 Mar 3+081 2021 LP1/3 M-35 Pile Pile 24.00 26224.75 197 149821.5 14760 12639598 12096 10788050 17880 15260826 0 352635 79 68597 Atepl Prod.

1662 11.03.21 Mar 15+404 2021 LA1/LA2 E-2 M-50 RCC Igirder 9.00 26233.75 81 149902.5 6174 12645772 4113 10792163 6867 15267693 0 352635 32 68629 Atepl Prod.
Recd pnc Camp-1
1663 11.03.21 Mar 29+800 2021 LA1/2 M-35 Pile Pile 22.00 26255.75 0 149902.5 0 12645772 0 10792163 0 15267693 0 352635 0 68629 Atepl T.M
Recd pnc Camp-1
1664 11.03.21 Mar 29+800 2021 RA1 M-15 PCC Pile Cap PCC 3.50 26259.25 0 149902.5 0 12645772 0 10792163 0 15267693 0 352635 0 68629 Atepl T.M
Recd pnc Camp-1
1665 11.03.21 Mar 22+062 2021 LA2 M-35 RCC Pile Cap (MNB) 20.00 26279.25 0 149902.5 0 12645772 0 10792163 0 15267693 0 352635 0 68629 Atepl T.M
Recd pnc Camp-1
1666 11.03.21 Mar 19+923 2021 PCC M-15 PCC RCC bead Work 1.50 26280.75 0 149902.5 0 12645772 0 10792163 0 15267693 0 352635 0 68629 Atepl T.M
Recd pnc Camp-1
1667 11.03.21 Mar 22+062 2021 A1-A2 RHS M-35 RCC RCC Beam No.13 (MNB) 5.00 26285.75 0 149902.5 0 12645772 0 10792163 0 15267693 0 352635 0 68629 Atepl T.M
Recd pnc Camp-1
1668 12.03.21 Mar 22+062 2021 A1-A2 RHS M-35 RCC RCC Beam No.14/15/16 (MNB) 15.00 26300.75 0 149902.5 0 12645772 0 10792163 0 15267693 0 352635 0 68629 Atepl T.M
Recd pnc Camp-1
1669 12.03.21 Mar 29+800 2021 LA1/3 M-35 Pile Pile 22.00 26322.75 0 149902.5 0 12645772 0 10792163 0 15267693 0 352635 0 68629 Atepl T.M

1670 12.03.21 Mar 24+468 2021 LA1/LP1- M-1 M-50 RCC IGIRDER 31.50 26354.25 282 150184.5 21609 12667381 14396 10806559 23909 15291602 0 352635 113 68742 Atepl Prod.

1671 12.03.21 Mar 19+923 2021 RA1 M-45 RCC Pedestal 1.50 26355.75 13 150197.5 935 12668316 765 10807324 1128 15292730 0 352635 5 68747 Atepl Prod.

1672 12.03.21 Mar 22+062 2021 LA2-2 M-35 RCC Abutment Shaft 6.50 26362.25 49 150246.5 3803 12672119 3803 10811127 5012 15297742 0 352635 22 68769 Atepl Prod.

1673 12.03.21 Mar 17+009 2021 Raft M-15 PCC Box Raft 26.00 26388.25 93 150339.5 17602 12689721 14404 10825531 21268 15319010 1550 354185 71 68840 Atepl Prod.

1674 12.03.21 Mar 1+449 2021 LP2/10 M-35 Pile Pile 18.00 26406.25 117 150456.5 16638 12706359 8694 10834225 12834 15331844 1854 356039 59 68899 Atepl Prod.

1675 12.03.21 Mar 17+009 2021 A1 3rd &A1 M-35 RCC A1 3rd lift Wall & A1 1st Lift Wall 41.00 26447.25 308 150764.5 31997 12738356 24278 10858503 24278 15356122 0 356039 138 69037 Atepl Prod.

1676 13.03.21 Mar 1+800 2021 Karb M-20 Road Karb 22.00 26469.25 105 150869.5 13882 12752238 11352 10869855 16808 15372930 1936 357975 47 69084 Trans-From PNC T.M

1677 13.03.21 Mar 12+588 2021 RA1 M-40 RCC Elevator poration 2.00 26471.25 16 150885.5 1384 12753622 922 10870777 1538 15374468 0 357975 7 69091 Atepl Prod.

1678 13.03.21 Mar 1+449 2021 RP3/1 M-40 RCC Pier Shaft 10.50 26481.75 84 150969.5 7266 12760888 4841 10875618 8075 15382543 0 357975 36 69127 Atepl Prod.

1679 13.03.21 Mar 1+449 2021 Rp1 M-15 PCC Crips Fitting Work 1.50 26483.25 6 150975.5 1232 12762120 833 10876451 1016 15383559 93 358068 4 69131 Atepl Prod.

1680 13.03.21 Mar 5+383 2021 RA1/RA2 L/S M-40 RCC Cross Barrier 4.50 26487.75 36 151011.5 3114 12765234 2075 10878526 3461 15387020 0 358068 16 69147 Atepl Prod.

1681 13.03.21 Mar 3+081 2021 LP1/4 M-35 Pile Pile 22.00 26509.75 143 151154.5 13002 12778236 10626 10889152 15752 15402772 2266 360334 72 69219 Atepl Prod.

1682 13.03.21 Mar 1+449 2021 LP2/11 M-35 Pile Pile 18.00 26527.75 117 151271.5 10638 12788874 8676 10897828 12888 15415660 1962 362296 59 69278 Atepl Prod.

1683 13.03.21 Mar 4+485 2021 LA1-LA2 M-35 RCC Deck Slab 90.00 26617.75 666 151937.5 52650 12841524 52830 10950658 69660 15485320 0 362296 300 69578 Atepl Prod.

1684 13.03.21 Mar 15+404 2021 LA1/LA2 M-E-1 M-50 RCC Igirder 9.00 26626.75 81 152018.5 6174 12847698 4113 10954771 6831 15492151 0 362296 32 69610 Atepl Prod.
Recd pnc Camp-1
1685 13.03.21 Mar 29+800 2021 LA1/4 M-35 Pile Pile 22.00 26648.75 0 152018.5 0 12847698 0 10954771 0 15492151 0 362296 0 69610 Atepl T.M
Recd pnc Camp-1
1686 13.03.21 Mar 22+062 2021 A1-A2 RHS M-35 RCC RCC Beam No.17/18 (MNB) 10.00 26658.75 0 152018.5 0 12847698 0 10954771 0 15492151 0 362296 0 69610 Atepl T.M
Recd pnc Camp-1
1687 13.03.21 Mar 22+062 2021 RA2-2 M-35 RCC Abutment Shaft 2.00 26660.75 0 152018.5 0 12847698 0 10954771 0 15492151 0 362296 0 69610 Atepl T.M

1688 14.03.21 Mar 0+115 2021 A1 M-50 RCC Abutment Shaft 17.50 26678.25 157 152175.5 12005 12859703 7998 10962769 13353 15505504 0 362296 63 69673 Atepl Prod.
1689 14.03.21 Mar 17+009 2021 PCC M-15 PCC Raft Work 3.50 26681.75 13 152188.5 2370 12862073 1943 10964712 2874 15508378 217 362513 10 69683 Atepl Prod.

1690 15.03.21 Mar 3+081 2021 LP1/5 M-35 Pile Pile 22.00 26703.75 143 152331.5 13002 12875075 10626 10975338 15686 15524064 2266 364779 72 69755 Atepl Prod.

1691 15.03.21 Mar 1+449 2021 RP3-2 M-40 RCC PierShaft 9.50 26713.25 76 152407.5 6574 12881649 4380 10979718 7277 15531341 0 364779 33 69788 Atepl Prod.

1692 15.03.21 Mar 3+081 2021 RA1/RA2 M-40 RCC Deck Slab (S/R) 73.00 26786.25 584 152991.5 505016 13386665 33653 11013371 55918 15587259 0 364779 249 70037 Atepl Prod.

1693 15.03.21 Mar 19+923 2021 RA2 M-45 RCC Pedestal 1.50 26787.75 13 153004.5 935 13387600 765 11014136 1128 15588387 0 364779 5 70042 Atepl Prod.

1694 15.03.21 Mar 12+588 2021 RP1 M-45 RCC Pedestal 1.00 26788.75 13 153017.5 935 13388535 765 11014901 1128 15589515 0 364779 5 70047 Atepl Prod.

1695 15.03.21 Mar 1+449 2021 LP2/12 M-35 Pile Pile 18.00 26806.75 117 153134.5 10638 13399173 8694 11023595 12834 15602349 1854 366633 59 70106 Atepl Prod.

1696 15.03.21 Mar 24+468 2021 LA1/LP1M-2 M-50 RCC IGIRDER 32.00 26838.75 287 153421.5 21952 13421125 14624 11038219 24288 15626637 0 366633 114 70220 Atepl Prod.

1697 15.03.21 Mar 5+383 2021 CrashBarriers M-40 RCC RA1/RA2L/S 4.50 26843.25 36 153457.5 3114 13424239 2075 11040294 3447 15630084 0 366633 16 70236 Atepl Prod.
Recd pnc Camp-1
1698 15.03.21 Mar 22+062 2021 A1-A2 RHS M-35 RCC BeamNo.19 (MNB) 5.00 26848.25 0 153457.5 0 13424239 0 11040294 0 15630084 0 366633 0 70236 Atepl T.M
Recd pnc Camp-1
1699 16.03.21 Mar 19+016 2021 A2 Side M-35 RCC Wall 1st Lift 16.00 26864.25 0 153457.5 0 13424239 0 11040294 0 15630084 0 366633 0 70236 Atepl T.M

1700 16.03.21 Mar 22+062 2021 RA2-1 M-35 RCC Abutment Shaft 5.00 26869.25 37 153494.5 2925 13427164 2925 11043219 3870 15633954 0 366633 17 70253 Atepl Prod.

1701 16.03.21 Mar 22+062 2021 RA2-2 M-35 RCC Abutment Shaft 5.00 26874.25 37 153531.5 2925 13430089 2925 11046144 3870 15637824 0 366633 17 70270 Atepl Prod.

1702 16.03.21 Mar 13+163 2021 RA1 M-45 RCC Pedestal 2.00 26876.25 17 153548.5 1246 13431335 1020 11047164 1510 15639334 0 366633 7 70277 Atepl Prod.

1703 16.03.21 Mar 10+827 2021 LP1 M-35 Pile Test Pile 21.50 26897.75 177 153725.5 13223 13444558 10815 11057979 16018 15655352 0 366633 71 70348 Atepl Prod.

1704 16.03.21 Mar 15+404 2021 PCC M-15 PCC PSC Bead Work 2.50 26900.25 9 153734.5 1693 13446251 1388 11059367 2053 15657405 155 366788 7 70355 Atepl Prod.

1705 16.03.21 Mar 0+115 2021 A2 M-15 PCC Pile Cap PCC 3.50 26903.75 13 153747.5 2874 13449125 1943 11061310 2874 15660279 217 367005 10 70365 Atepl Prod.

1706 16.03.21 Mar 1+449 2021 LP2/3 M-35 Pile Pile 18.00 26921.75 117 153864.5 10638 13459763 8694 11070004 12888 15673167 1854 368859 59 70424 Atepl Prod.

1707 17.03.21 Mar 1+449 2021 LP2/2 M-35 Pile Pile 18.00 26939.75 117 153981.5 10638 13470401 8694 11078698 12888 15686055 1854 370713 59 70483 Atepl Prod.

1708 17.03.21 Mar 1+449 2021 RA2 M-35 RCC Abutment Cap 53.50 26993.25 396 154377.5 31298 13501699 31298 11109996 41409 15727464 0 370713 178 70661 Atepl Prod.

1709 17.03.21 Mar 15+404 2021 LA1/LA2 M-1 M-50 RCC Igirder 9.00 27002.25 81 154458.5 6174 13507873 4113 11114109 6867 15734331 0 370713 32 70693 Atepl Prod.

1710 17.03.21 Mar 5+383 2021 CrashBarriers M-40 RCC LA1/LA2 L/S 5.00 27007.25 40 154498.5 3460 13511333 2305 11116414 3845 15738176 0 370713 17 70710 Atepl Prod.

1711 18.03.21 Mar 4+485 2021 CrashBarriers M-40 RCC RHS 8.00 27015.25 64 154562.5 5536 13516869 3688 11120102 6152 15744328 0 370713 28 70738 Atepl Prod.

1712 18.03.21 Mar 19+923 2021 LA1 M-45 RCC Pedestal 1.50 27016.75 13 154575.5 935 13517804 765 11120867 1133 15745461 0 370713 5 70743 Atepl Prod.

1713 18.03.21 Mar 15+404 2021 LA2 M-35 RCC Wall 2nd lift 10.00 27026.75 74 154649.5 5850 13523654 5850 11126717 7740 15753201 0 370713 33 70776 Atepl Prod.

1714 18.03.21 Mar 3+081 2021 LA1 M-15 PCC Pile Cap PCC 3.00 27029.75 11 154660.5 2031 13525685 1665 11128382 2463 15755664 186 370899 8 70784 Atepl Prod.

1715 18.03.21 Mar 0+115 2021 A2 M-15 PCC Pile Cap PCC 1.50 27031.25 6 154666.5 1016 13526701 833 11129215 1232 15756896 93 370992 4 70788 Atepl Prod.

1716 18.03.21 Mar 1+449 2021 LP2/1 M-35 Pile Pile 18.00 27049.25 117 154783.5 10638 13537339 8694 11137909 12888 15769784 1854 372846 59 70847 Atepl Prod.

1717 18.03.21 Mar 17+009 2021 A1 M-35 RCC 2nd Wall 3rd Lift 19.50 27068.75 145 154928.5 11408 13548747 11408 11149317 15093 15784877 0 372846 65 70912 Atepl Prod.

1718 19.03.21 Mar 5+383 2021 LA1/LA2 L/S M-40 RCC Crass Barrier 4.50 27073.25 36 154964.5 3114 13551861 2075 11151392 3461 15788338 0 372846 16 70928 Atepl Prod.

1719 19.03.21 Mar 12+588 2021 A1/P1 M-15 PCC Staging Work 2.50 27075.75 9 154973.5 1693 13553554 1388 11152780 2053 15790391 155 373001 7 70935 Atepl Prod.

1720 19.03.21 Mar 15+404 2021 LA1/LA2 M-2 M-50 RCC Igirder 9.00 27084.75 81 155054.5 6714 13560268 4113 11156893 6174 15796565 0 373001 32 70967 Atepl Prod.

1721 19.03.21 Mar 1+449 2021 RP2/1 M-35 Pile Pile 18.00 27102.75 117 155171.5 10638 13570906 8712 11165605 12888 15809453 1854 374855 59 71026 Atepl Prod.

1722 19.03.21 Mar 22+062 2021 LA2-3 M-35 RCC Abutment Shaft 1st lift 1.50 27104.25 11 155182.5 878 13571784 878 11166483 1161 15810614 0 374855 5 71031 Atepl Prod.

1723 19.03.21 Mar 17+009 2021 Wall M-35 RCC A2 Side Wall 1st Lift 18.00 27122.25 133 155315.5 10530 13582314 10530 11177013 13932 15824546 0 374855 60 71091 Atepl Prod.

1724 19.03.21 Mar 22+062 2021 Final M-35 RCC Pier Shaft 5.00 27127.25 37 155352.5 2925 13585239 2925 11179938 3870 15828416 0 374855 17 71108 Atepl Prod.

1725 19.03.21 Mar 22+062 2021 Pier Shaft M-35 RCC RA2-4 & 4 1st Lift 3.50 27130.75 26 155378.5 2048 13587287 2048 11181986 2709 15831125 0 374855 12 71120 Atepl Prod.
Recd pnc Camp-1
1726 19.03.21 Mar 29+800 2021 LA1 M-15 PCC Pile Cap PCC 3.50 27134.25 0 155378.5 0 13587287 0 11181986 0 15831125 0 374855 0 71120 Atepl T.M
Recd pnc Camp-1
1727 20.03.21 Mar 22+062 2021 LA1 M-35 RCC Pile Cap (MNB) 20.00 27154.25 0 155378.5 0 13587287 0 11181986 0 15831125 0 374855 0 71120 Atepl T.M
Recd pnc Camp-1
1728 20.03.21 Mar 15+404 2021 LA1-2 M-35 RCC Abutment Shaft (S/R) 6.00 27160.25 0 155378.5 0 13587287 0 11181986 0 15831125 0 374855 0 71120 Atepl T.M
Recd pnc Camp-1
1729 20.03.21 Mar 17+009 2021 A2 M-35 RCC A2 Side Wall 4th Lift 16.00 27176.25 0 155378.5 0 13587287 0 11181986 0 15831125 0 374855 0 71120 Atepl T.M

1730 20.03.21 Mar 1+449 2021 RP2/2 M-35 Pile Pile 18.00 27194.25 117 155495.5 10638 13597925 8694 11190680 13194 15844319 1854 376709 59 71179 Atepl Prod.

1731 20.03.21 Mar 13+163 2021 LA1/LA2 M-1 M-50 RCC I Girder 18.50 27212.75 166 155661.5 12691 13610616 8455 11199135 13801 15858120 0 376709 66 71245 Atepl Prod.

1732 20.03.21 Mar 12+588 2021 PCC M-15 PCC Staging Work 6.00 27218.75 22 155683.5 4062 13614678 3330 11202465 4908 15863028 372 377081 17 71262 Atepl Prod.

1733 20.03.21 Mar 19+923 2021 LA2 M-45 RCC Pedestal 1.50 27220.25 13 155696.5 935 13615613 764 11203229 1128 15864156 0 377081 5 71267 Atepl Prod.

1734 21.03.21 Mar 19+016 2021 Raft M-35 RCC Box Raft 18.00 27238.25 109 155805.5 11214 13626827 9180 11212409 13608 15877764 1854 378935 72 71339 Atepl Prod.

1735 21.03.21 Mar 12+588 2021 PCC M-15 PCC Staging Work 3.00 27241.25 11 155816.5 2031 13628858 1662 11214071 2463 15880227 186 379121 8 71347 Atepl Prod.
Recd pnc Camp-1
1736 21.03.21 Mar 19+016 2021 Raft M-35 RCC Box Raft 131.00 27372.25 0 155816.5 0 13628858 0 11214071 0 15880227 0 379121 0 71347 Atepl T.M

1737 22.03.21 Mar 15+404 2021 LA1/LA2 M-3 M-50 RCC Igirder 9.00 27381.25 81 155897.5 6174 13635032 4113 11218184 6831 15887058 0 379121 33 71380 Atepl Prod.

1738 22.03.21 Mar 4+485 2021 LHS M-40 RCC Crass Barrier 12.00 27393.25 96 155993.5 8304 13643336 5532 11223716 9192 15896250 0 379121 41 71421 Atepl Prod.

1739 22.03.21 Mar 3+081 2021 LP1 M-15 PCC Staging Work 2.00 27395.25 7 156000.5 1354 13644690 1110 11224826 1636 15897886 124 379245 5 71426 Atepl Prod.

1740 22.03.21 Mar 1+449 2021 PSC M-15 PCC igirder Bed Work 5.00 27400.25 18 156018.5 4090 13648780 2775 11227601 3385 15901271 310 379555 14 71440 Atepl Prod.

1741 22.03.21 Mar 1+449 2021 RP2/3 M-35 Pile Pile 19.50 27419.75 127 156145.5 11525 13660305 9419 11237020 13904 15915175 2009 381564 64 71504 Atepl Prod.

1742 23.03.21 Mar 1+449 2021 RP2/4 M-35 Pile Pile 18.00 27437.75 117 156262.5 10638 13670943 8694 11245714 12888 15928063 1854 383418 59 71563 Atepl Prod.

1743 23.03.21 Mar 1+449 2021 PSC M-15 PCC igirder Bed Work 4.50 27442.25 16 156278.5 3047 13673990 2493 11248207 3695 15931758 279 383697 12 71575 Atepl Prod.

1744 23.03.21 Mar 15+404 2021 LA2 M-35 RCC Abutment Wall 20.00 27462.25 148 156426.5 11700 13685690 11700 11259907 15480 15947238 0 383697 67 71642 Atepl Prod.

1745 23.03.21 Mar 3+081 2021 PCC M-15 PCC PCC Work 1.00 27463.25 4 156430.5 677 13686367 554 11260461 821 15948059 62 383759 3 71645 Atepl Prod.

1746 23.03.21 Mar 22+062 2021 LA2-3& RA2-4 M-35 RCC Pier Shaft 9.50 27472.75 71 156501.5 5558 13691925 5558 11266019 7353 15955412 0 383759 32 71677 Atepl Prod.

1747 24.03.21 Mar 15+404 2021 LA1-LA2 E-2 M-50 RCC Igirder 8.50 27481.25 77 156578.5 5831 13697756 3876 11269895 6290 15961702 0 383759 31 71708 Atepl Prod.

1748 24.03.21 Mar 1+449 2021 RP2/5 M-35 Pile Pile 18.50 27499.75 121 156699.5 10933 13708689 8936 11278831 13246 15974948 1905 385664 61 71769 Atepl Prod.

1749 24.03.21 Mar 6+200 2021 Glob Infra M-35 RE R/Panel 13.00 27512.75 94 156793.5 8398 13717087 6851 11285682 10140 15985088 0 385664 40 71809 Trans-From PNC T.M

1750 24.03.21 Mar Camp-2 2021 Sarban Enter. M-35 RE R/Panel 13.00 27525.75 94 156887.5 8398 13725485 6851 11292533 10140 15995228 0 385664 40 71849 Trans-From PNC T.M

1751 25.03.21 Mar 22+062 2021 RA2-3 M-35 RCC Pier Shaft Final Lift 5.00 27530.75 17 156904.5 2925 13728410 2925 11295458 3870 15999098 0 385664 17 71866 Atepl Prod.

1752 25.03.21 Mar 13+163 2021 PCC M-15 PCC igirder Bed Work 2.00 27532.75 7 156911.5 1354 13729764 1108 11296566 1642 16000740 124 385788 5 71871 Atepl Prod.

1753 25.03.21 Mar 15+404 2021 RA1/1 M-35 RCC Abutment Wall & R/Wall 13.50 27546.25 100 157011.5 7898 13737662 7898 11304464 10449 16011189 0 385788 45 71916 Atepl Prod.

1754 25.03.21 Mar 5+383 2021 RCC M-30 RCC R/Post 0.50 27546.75 4 157015.5 325 13737987 265 11304729 382 16011571 0 385788 2 71918 Atepl Prod.

1755 25.03.21 Mar 1+449 2021 RP1 M-35 RCC Pier Cap 127.00 27673.75 940 157955.5 74295 13812282 74295 11379024 98298 16109869 0 385788 423 72341 Atepl Prod.

1756 25.03.21 Mar 1+449 2021 RP2/6 M-35 Pile Pile 18.00 27691.75 117 158072.5 10638 13822920 8676 11387700 12888 16122757 1854 387642 59 72400 Atepl Prod.

1757 26.03.21 Mar 3+081 2021 RP1 M-40 RCC Pier Cap 36.00 27727.75 288 158360.5 24912 13847832 16596 11404296 27684 16150441 0 387642 123 72523 Atepl Prod.

1758 26.03.21 Mar 1+449 2021 LP3 M-35 RCC Pier Cap 76.50 27804.25 567 158927.5 44753 13892585 44753 11449049 59211 16209652 0 387642 255 72778 Atepl Prod.

1759 26.03.21 Mar 1+449 2021 RP2/7 M-35 Pile Pile 18.00 27822.25 117 159044.5 10638 13903223 8676 11457725 12888 16222540 1854 389496 59 72837 Atepl Prod.

1760 27.03.21 Mar 0+115 2021 A2 M-50 RCC PileHead 1.50 27823.75 13 159057.5 1029 13904252 687 11458412 1144 16223684 0 389496 5 72842 Atepl Prod.

1761 27.03.21 Mar 5+383 2021 RCC M-40 RCC Hand Raililg Post 1.00 27824.75 8 159065.5 692 13904944 461 11458873 769 16224453 0 389496 4 72846 Atepl Prod.

1762 27.03.21 Mar 4+485 2021 LA1-LA2 M-40 RCC Crass Barrier 12.00 27836.75 96 159161.5 8304 13913248 5532 11464405 9228 16233681 0 389496 41 72887 Atepl Prod.

1763 27.03.21 Mar 10+827 2021 Head M-50 RCC PileHead 0.50 27837.25 4 159165.5 343 13913591 229 11464634 381 16234062 0 389496 2 72889 Atepl Prod.

1764 27.03.21 Mar 3+081 2021 LP1/5 M-35 RCC PierShaft 4.50 27841.75 33 159198.5 2632 13916223 2632 11467266 3483 16237545 0 389496 15 72904 Atepl Prod.

1765 31.03.21 Mar 3+081 2021 LP1-4 M-35 RCC PierShaft 4.50 27846.25 33 159231.5 2632 13918855 2632 11469898 3483 16241028 0 389496 15 72919 Atepl Prod.

1766 31.03.21 Mar 12+588 2021 LP3 M-50 RCC Pedestal 1.00 27847.25 9 159240.5 686 13919541 458 11470356 763 16241791 0 389496 3 72922 Atepl Prod.
3231 01.03.22 March 12+588 2022 RA1-RP1 M-45 RCC Deck Slab (Box Girder) 218.5 53870.50 1857 300799 136126 25917015 110998 20912577 166716 30483402 0 830636 743 135727.5 Atepl Prod.

3232 01.03.22 March 0+232 2022 VA2/3 M-35 RCC Piers Shaft 1st List 5 53875.50 37 300836 3230 25920245 2635 20915212 3945 30487347 0 830636 17 135744.5 Atepl Prod.

3233 01.03.22 March 0+232 2022 VA2/4 M-35 RCC Piers Shaft Final Lift 4.5 53880.00 34 300870 2907 25923152 2372 20917584 3551 30490898 0 830636 15 135759.5 Atepl Prod.

3234 01.03.22 March 0+115 2022 P1 M-50 RCC Pedestal (As per D-M-45) 2 53882.00 18 300888 1368 25924520 908 20918492 1524 30492422 0 830636 7 135766.5 Atepl Prod.

3235 02.03.22 March 1+449 2022 LA2-LP4 M-40 RCC Deck Slab 104 53986.00 832 301720 66040 25990560 53872 20972364 80600 30573022 0 830636 354 136120.5 Atepl Prod.

3236 02.03.22 March 2+525 2022 RP1 M-40 RCC Pier Cap 128.5 54114.50 1028 302748 81598 26072158 66563 21038927 99588 30672610 0 830636 437 136557.5 Atepl Prod.

3237 03.03.22 March 24+468 2022 RA1-RP1 M-40 RCC Deck Slab 78 54192.50 624 303372 49530 26121688 40404 21079331 60450 30733060 0 830636 265 136822.5 Atepl Prod.

3238 03.03.22 March 10+827 2022 LP1 M-40 RCC Pier Cap 70.5 54263.00 564 303936 44768 26166456 36519 21115850 54638 30787698 0 830636 240 137062.5 Atepl Prod.
Recd.PNCCamp-1
3239 03.03.22 March 24+468 2022 RA1-RP1 M-40 RCC Deck Slab 72 54335.00 0 303936 0 26166456 0 21115850 0 30787698 0 830636 0 137062.5 ATEPL T.M
Recd.PNCCamp-1
3240 03.03.22 March 24+166 2022 LA1-LA2 M-40 RCC Crash Barrier LHS 6.5 54341.50 0 303936 0 26166456 0 21115850 0 30787698 0 830636 0 137062.5 ATEPL T.M
Recd.PNCCamp-1
3241 04.03.22 March 17+009 2022 RA1-RA2 (SR) M-35 RCC Hand Rail Bottom Beam 6.5 54348.00 0 303936 0 26166456 0 21115850 0 30787698 0 830636 0 137062.5 ATEPL T.M

3242 04.03.22 March 29+800 2022 RP2/3 M-40 RCC Pier Shaft 16 54364.00 128 304064 10160 26176616 8288 21124138 12400 30800098 0 830636 54 137116.5 Atepl Prod.

3243 04.03.22 March 29+800 2022 LP2/1 M-40 RCC Pier Shaft 16 54380.00 128 304192 10160 26186776 8288 21132426 12400 30812498 0 830636 54 137170.5 Atepl Prod.

3244 04.03.22 March 12+588 2022 LP3-LA2 M-40 RCC Crash Barrier (Median Side) 12 54392.00 96 304288 7620 26194396 6216 21138642 9300 30821798 0 830636 41 137211.5 Atepl Prod.

3245 04.03.22 March 12+588 2022 LA2 M-35 RCC Dirt Wall 1st Lift 4.5 54396.50 33 304321 2907 26197303 2372 21141014 3546 30825344 0 830636 15 137226.5 Atepl Prod.

3246 04.03.22 March 1+449 2022 RP1-Rp2,RA-1-RP1,LP1-LP2 M-40 RCC End Cross Girder 10 54406.50 80 304401 6350 26203653 5180 21146194 7750 30833094 0 830636 34 137260.5 Atepl Prod.
Recd.PNCCamp-1
3247 05.03.22 March 24+166 2022 RA1-RA2 LHS M-40 RCC Crash Barrier 7 54413.50 0 304401 0 26203653 0 21146194 0 30833094 0 830636 0 137260.5 ATEPL T.M

3248 05.03.22 March 0+232 2022 VA2/2 M-35 RCC Pier Shaft 1st Lift 5 54418.50 37 304438 3230 26206883 2640 21148834 3895 30836989 0 830636 17 137277.5 Atepl Prod.

3249 05.03.22 March 0+232 2022 VA2/3 M-35 RCC Pier Shaft Final Lift 4.5 54423.00 33 304471 2907 26209790 2376 21151210 3506 30840495 0 830636 15 137292.5 Atepl Prod.

3250 05.03.22 March 24+468 2022 RP1-RP2 M-45 RCC End Cross Girder (As P d M-40) 9.5 54432.50 81 304552 5919 26215709 4826 21156036 7154 30847649 0 830636 32 137324.5 Atepl Prod.

3251 05.03.22 March 2+525 2022 RP1 M-40 RCC Pier Cap Elevated Portion 12 54444.50 96 304648 7620 26223329 6216 21162252 9192 30856841 0 830636 41 137365.5 Atepl Prod.

3252 07.03.22 March 12+588 2022 LP3-LA2 M-40 RCC Crash Barrier (Outer Side) 12 54456.50 96 304744 7620 26230949 6216 21168468 9156 30865997 0 830636 41 137406.5 Atepl Prod.

3253 07.03.22 March 1+449 2022 RA1-RP1 M-40 RCC End Coss Girder (Ra1 Side)5 nos 5.5 54462.00 44 304788 3493 26234442 2849 21171317 4197 30870194 0 830636 19 137425.5 Atepl Prod.

3254 07.03.22 March 1+449 2022 RP1-RP2 M-40 RCC End Coss Girder (RP2 Side)2 nos 1.5 54463.50 12 304800 953 26235395 777 21172094 1144 30871338 0 830636 5 137430.5 Atepl Prod.

3255 07.03.22 March 1+449 2022 RP1-RP2 M-40 RCC End Coss Girder (RP1 Side)2 nos 1.5 54465.00 12 304812 953 26236348 777 21172871 1144 30872482 0 830636 5 137435.5 Atepl Prod.

3256 08.03.22 March 29+800 2022 LP2/2 M-40 RCC Pier Shaft 16 54481.00 128 304940 10160 26246508 8304 21181175 12176 30884658 0 830636 55 137490.5 Atepl Prod.

3257 08.03.22 March 29+800 2022 LP2/3 M-40 RCC Pier Shaft 16 54497.00 128 305068 10160 26256668 8304 21189479 12176 30896834 0 830636 55 137545.5 Atepl Prod.

3258 08.03.22 March 0+115 2022 P-2 M-50 RCC Pedestal (As per D-M-45) 2 54499.00 18 305086 1372 26258040 914 21190393 1508 30898342 0 830636 7 137552.5 Atepl Prod.

3259 08.03.22 March 0+232 2022 VA2/2 M-40 RCC Pier Shaft Final Lift 4.5 54503.50 33 305119 2907 26260947 2376 21192769 3483 30901825 0 830636 15 137567.5 Atepl Prod.

3260 08.03.22 March 0+232 2022 VA2/1 M-40 RCC Pier Shaft 1st Lift 5 54508.50 37 305156 3230 26264177 2640 21195409 3870 30905695 0 830636 17 137584.5 Atepl Prod.

3261 09.03.22 March 0+115 2022 A2 M-50 RCC Pedestal (As per D-M-45) 1.5 54510.00 14 305170 1026 26265203 681 21196090 1119 30906814 0 830636 5 137589.5 Atepl Prod.

3262 09.03.22 March 10+827 2022 LP2 (A2 Side) M-50 RCC Pedestal (As per D-M-45) 2 54512.00 18 305188 1368 26266571 908 21196998 1492 30908306 0 830636 7 137596.5 Atepl Prod.
Recd.PNCCamp-1
3263 10.03.22 March 17+009 2022 RA1-RA2 M-35 RCC Hand Rail Post (SR) 1 54513.00 0 305188 0 26266571 0 21196998 0 30908306 0 830636 0 137596.5 ATEPL T.M

3264 10.03.22 March 12+588 2022 RP3-RA2 M-40 RCC Crash Barrier (Median side) 12 54525.00 96 305284 7620 26274191 6216 21203214 9204 30917510 0 830636 41 137637.5 Atepl Prod.

3265 10.03.22 March 24+166 2022 RA1-RA2 M-40 RCC Crash Barrier (RHS) 6.5 54531.50 52 305336 4128 26278319 3367 21206581 4986 30922496 0 830636 22 137659.5 Atepl Prod.

3266 10.03.22 March 24+468 2022 RP1-RP2 M-40 RCC Intermediate Cross Girder (4 nos) 8.5 54540.00 68 305404 5398 26283717 4403 21210984 6520 30929016 0 830636 29 137688.5 Atepl Prod.

3267 10.03.22 March 24+468 2022 LP1-LP2 M-40 RCC Intermediate Cross Girder (8 nos) 17 54557.00 136 305540 10795 26294512 8806 21219790 13039 30942055 0 830636 58 137746.5 Atepl Prod.

3268 11.03.22 March 0+232 2022 VA2/1 M-35 RCC Pier Shaft Final Lift 5 54562.00 37 305577 3230 26297742 2640 21222430 3875 30945930 0 830636 17 137763.5 Atepl Prod.

3269 11.03.22 March 1+449 2022 LP1-LP2 M-40 RCC (LP2 Side,RP2 Side,RP1 Side,RP1,Ra1) End Cross Girder 9.5 54571.50 76 305653 6033 26303775 4921 21227351 7229 30953159 0 830636 32 137795.5 Atepl Prod.
Recd.PNCCamp-1
3270 12.03.22 March 17+009 2022 RA1-RA2 M-35 RCC Hand Rail Post (SR) 0.5 54572.00 0 305653 0 26303775 0 21227351 0 30953159 0 830636 0 137795.5 ATEPL T.M

3271 13.03.22 March 12+588 2022 RP3-RA2 M-40 RCC Crash Barrier (Footpath Side) 12 54584.00 96 305749 7620 26311395 6216 21233567 9156 30962315 0 830636 41 137836.5 Atepl Prod.

3272 14.03.22 March 10+827 2022 LA2 M-50 RCC Pedestal (As per D-M-45) 1.75 54585.75 16 305765 1197 26312592 796 21234363 1309 30963624 0 830636 6 137842.5 Atepl Prod.

3273 15.03.22 March 1+449 2022 LA1-LP1 M-40 RCC Cross Girder (LP1 Side) 4 54589.75 32 305797 2540 26315132 2072 21236435 3044 30966668 0 830636 14 137856.5 Atepl Prod.

3274 16.03.22 March 12+588 2022 RP2-RP3 M-40 RCC Crash Barrier (Footpath Side) 17 54606.75 136 305933 10795 26325927 8806 21245241 12937 30979605 0 830636 58 137914.5 Atepl Prod.

3275 17.03.22 March 1+449 2022 LA1-LP1 M-40 RCC Cross Girder (LA1 Side) 4 54610.75 32 305965 2540 26328467 2072 21247313 3044 30982649 0 830636 14 137928.5 Atepl Prod.

3276 20.03.22 March 12+588 2022 RP2-RP3 M-40 RCC Crash Barrier (Median side) 17 54627.75 136 306101 10795 26339262 8806 21256119 12971 30995620 0 830636 58 137986.5 Atepl Prod.

3277 22.03.22 March 0+232 2022 VA2 M-10 PCC PCC for Pier Cap Stagging Work 2.5 54630.25 9 306110 1455 26340717 1455 21257574 2358 30997978 0 830636 6 137992.5 Atepl Prod.

3278 22.03.22 March 1+449 2022 LA1-LP1 M-40 RCC Cross Girder (LA1 Side) 4 nos 4 54634.25 32 306142 2540 26343257 2072 21259646 3052 31001030 0 830636 14 138006.5 Atepl Prod.

3279 22.03.22 March 10+827 2022 RA1 M-50 RCC Pedestal (As per D-M-45) 1.75 54636.00 16 306158 1197 26344454 795 21260441 1311 31002341 0 830636 6 138012.5 Atepl Prod.

3280 23.03.22 March 12+588 2022 RP1-RP2 M-40 RCC Deck Slab 126 54762.00 1008 307166 80010 26424464 65268 21325709 96390 31098731 0 830636 428 138440.5 Atepl Prod.

3281 23.03.22 March 1+449 2022 LP3-LP4 M-40 RCC Deck Slab 106 54868.00 848 308014 67310 26491774 54908 21380617 81090 31179821 0 830636 361 138801.5 Atepl Prod.

3282 24.03.22 March 29+800 2022 RP1 M-50 RCC Pier Cap 108 54976.00 968 308982 73872 26565646 49032 21429649 80460 31260281 0 830636 387 139188.5 Atepl Prod.

3283 25.03.22 March 10+827 2022 RP1 M-50 RCC Pedestal (A1 Side,As per D-M-45) 2 54978.00 18 309000 1368 26567014 908 21430557 1490 31261771 0 830636 7 139195.5 Atepl Prod.

3284 26.03.22 March 0+232 2022 VA2 M-15 PCC Pier Cap Staging work 1.5 54979.50 7 309007 1020 26568034 833 21431390 1220 31262991 0 830636 4 139199.5 Atepl Prod.

3285 29.03.22 March 10+827 2022 LP1 M-50 RCC Pedestal (A1 Side,As per D-M-45) 2 54981.50 18 309025 1368 26569402 908 21432298 1492 31264483 0 830636 7 139206.5 Atepl Prod.

3286 31.03.22 March 1+449 2022 LA1-LP1 M-40 RCC Cross Girder (LA1 Side) 2 54983.50 16 309041 1270 26570672 1036 21433334 1520 31266003 0 830636 7 139213.5 Atepl Prod.

3287 31.03.22 March 1+449 2022 RP1-RP2 M-40 RCC Cross Girder (RP2 Side) 4.5 54988.00 36 309077 2858 26573530 2331 21435665 3420 31269423 0 830636 15 139228.5 Atepl Prod.

3288 31.03.22 March 1+449 2022 LP2-LP3 M-40 RCC Deck Slab 121 55109.00 968 310045 76835 26650365 62678 21498343 91960 31361383 0 830636 411 139639.5 Atepl Prod.
LUCKNOW PLANT PRODUCTION REPORT (PLANT CODE-1054)
BATCHING PLANT (CUM) CAMP-2 (ATEPL Plant)(Upto March.2023) Transfer To PNC
MONTH M-15 M-15 M-20 M-20 M-25 M-30 M-30 M-35 RE M-35 RE M-35 RCC M-35 RCC M-40 RCC
M-10 M-40
Cement FLY ASH Cement FLY ASH CEMENT Cement Flyash CEMENT Flyash CEMENT FLYASH FLYASH
Jan-20
Feb-20
March-20
April-20
May-20
June-20 69.50 16.00 75.50 6.00 167.00
July-20 70.50 3.50 229.50 13.50 317.00
Aug-20 19.50 2.50 55.50 166.50 244.00
Sep-20 12.00 102.00 114.00
Oct-20 67.00 67.00
Nov-20 -
Dec-20 12.00 12.00 24.00
Jan-21 6.00 12.00 67.50 53.00 103.00 241.50
Feb-21 17.00 15.00 2.50 98.00 4.50 6.50 143.50
March-21 27.00 26.00 53.00
April-21 18.00 32.00 50.00
May-21 25.50 158.00 13.00 196.50
June-21 30.00 95.00 53.00 13.00 12.00 71.00 274.00
July-21 3.00 18.00 21.00
Aug-21 6.00 6.00
Sep-21 21.50 14.00 63.50 99.00
Oct-21 9.50 12.00 1.50 30.00 53.00
Nov-21 6.50 6.00 12.50
Dec-21 -
Jan-22 6.00 18.00 24.00
Feb-22 16.00 6.00 12.50 6.50 15.00 56.00
March-22 -
April-22 31.00 7.00 34.00 1.50 4.50 24.50 102.50
May-22 -
June-22 14.00 2.00 16.00
July-22 15.00 6.00 17.50 23.00 16.00 77.50
Aug-22 12.5 19 29 59.5 120.00
Sep-22 6 25 12.5 3.5 12.5 13 19.5 40.5 18.5 151.00
Oct-22 6 6.5 12.50
Nov-22 6.5 13 8 6 33.50
Dec-22 -
Jan-23 2 54 14.5 7 77.50
Feb-23 24 54 6.75 7.25 92.00
March-23 -
-
-
-
-
Total 235.00 176.00 120.00 189.00 41.50 64.75 32.00 700.75 345.00 435.00 134.00 260.50 112.00 2845.5
LUCKNOW PLANT PRODUCTION REPORT
BATCHING PLANT (CUM) CAMP-1 & 2 (PNC Plant)(Upto March.2023) Receive to PNC
MONTH M-15 M-15 M-25 M-35 PILE M-35 M-35 RCC M-35 M-40 M-45 M-45 Pile
M-10 PILE RCC M-40 RCC M-50 M-55
Cement FLY ASH CEMENT CEMENT FLY ASH CEMENT FLYASH FLYASH CEMENT FLY ASH
Jan-20
Feb-20
March-20
April-20
May-20
June-20
July-20 15.00 15.00
Aug-20 -
Sep-20 70.50 70.50
Oct-20 10.00 6.00 16.00
Nov-20 58.50 142.50 160.00 5.50 366.50
Dec-20 94.00 450.00 1,318.50 30.00 1,892.50
Jan-21 27.50 505.50 758.50 73.50 1,365.00
Feb-21 63.00 388.00 1,017.00 14.00 1,482.00
March-21 14.50 173.50 393.50 581.50
April-21 3.50 269.50 151.50 63.50 488.00
May-21 8.00 197.50 267.00 9.50 40.00 522.00
June-21 3.00 165.00 297.00 8.50 473.50
July-21 11.00 305.00 341.50 107.00 6.00 770.50
Aug-21 18.00 104.50 391.50 1.00 515.00
Sep-21 6.50 204.50 475.00 177.00 1.50 864.50
Oct-21 20.50 657.00 425.50 160.00 31.00 1,294.00
Nov-21 57.00 469.00 416.00 4.00 946.00
Dec-21 16.00 650.75 33.00 12.00 711.75
Jan-22 3.00 400.00 63.00 10.50 476.50
Feb-22 3.00 114.50 115.00 3.00 1.50 237.00
March-22 8.00 85.50 93.50
April-22 30.00 30.00
May-22 5.50 6.50 57.00 69.00
June-22 5.50 44.50 54.50 104.50
July-22 37.50 0.50 4.00 42.00
Aug-22 -
Sep-22 -
Oct-22 -
Nov-22 344 344.00
Dec-22 48.5 2.5 1 52.00
Jan-23 1.5 24.5 19.5 45.50
Feb-23 12 12.00
March-23 6.5 6.50
-
-
-
-
Total 418.00 82.00 4,133.50 7,592.25 1,392.00 1.50 59.00 40.00 168.50 13886.75
LUCKNOW PLANT PRODUCTION REPORT

Recieve to Shubham RMC (LRR) (Upto June-2020)

MONTH M-15 M-25 M-30 M-35 PILE


Cement CEMENT Cement CEMENT M-50

Jan-20 8.00 5.50


Feb-20 315.00
March-20 66.00 53.00 3.00
April-20
May-20
June-20 27.00
Total 381.00 8.00 5.50 80.00 3.00 477.50
LUCKNOW PLANT PRODUCTION REPORT (PLANT CODE-1054)
BATCHING PLANT (CUM) CAMP-2 (ATEPL Plant)(Upto March.2023) Transfer To LKEP

MONTH M-35 M-35 M-40


M-15 M-15 M-20 M-20 M-25 M-30 PILE M-35 PILE M-35 RCC RCC M-40 RCC
Cement FLY ASH Cement FLY ASH CEMENT Cement FLY ASH CEMENT
CEMENT FLYASH FLYASH
June-22 57.5 17 29 14 117.5
July-22 179.00 6.00 20.00 158.00 12.00 40.50 251.50 667.00
Aug-22 117 12 58 232.5 192.5 612
Sep-22 42 80.5 162 25 184 189 682.5
Oct-22 100.5 32 105 20.5 69.5 184 9.5 116.5 22 659.5
Nov-22 0
Dec-22 26 23.5 49.5
Jan-23
Feb-23
March-23

Total 226.00 425.50 18.00 20.00 512.00 26.00 20.5 94.50 641.00 9.5 773.00 22 2,788.00
LUCKNOW PLANT PRODUCTION REPORT (PLANT CODE-1054)
BATCHING PLANT (CUM) CAMP-2 (ATEPL Plant)(Upto Sept.2022) ATPL LRR Production
MONTH M-15 M-15 M-20 M-25 M-30 M-35 PILE M-35 PILE M-35 RCC M-35 RCC M-40 Pile M-40 Pile M-40 RCC M-40 RCC M-45 Pile M-45
M-10 M-50 M-55
Cement FLY ASH Cement CEMENT Cement CEMENT FLY ASH CEMENT FLYASH Cement FLYASH Cement FLYASH CEMENT CEMENT
Jan-20
Feb-20 96.00 189.50 63.50 349.00
March-20 20.25 28.50 12.00 60.75
April-20 -
May-20 181.00 8.50 8.50 50.50 23.50 3.50 275.50
June-20 74.00 140.50 58.50 2.50 275.50
July-20 34.50 37.00 929.00 194.50 23.50 2.50 1,221.00
Aug-20 44.50 7.50 646.50 148.00 123.50 67.50 1,037.50
Sep-20 36.50 419.50 220.50 282.50 328.00 1,287.00
Oct-20 178.00 10.50 746.50 164.00 212.50 313.00 4.50 404.50 2,033.50
Nov-20 240.50 992.50 439.50 487.50 1.50 256.00 2,417.50
Dec-20 161.00 4.00 1,457.50 87.50 1123 116.00 626.50 48.00 3,623.50
Jan-21 43.50 114.50 1.50 171.00 550.00 425.00 929.50 722.00 5.00 57.50 3,019.50
Feb-21 91.00 9.50 390.50 661.00 509.00 142.50 263.00 7.00 132.50 2,206.00
March-21 2.50 83.00 0.50 63.50 432.00 1,041.50 204.50 35.00 279.50 18.00 243.50 2,403.50
April-21 53.00 329.00 275.50 192.50 1.00 99.50 950.50
May-21 4.50 16.00 68.50 102.50 307.00 268.50 296.50 199.50 113.50 1,376.50
June-21 23.50 779.00 291.50 223.50 317.00 240.00 65.00 1,939.50
July-21 82.50 607.50 328.00 19.50 428.50 142.50 54.00 341.00 2,003.50
Aug-21 75.00 6.00 93.50 333.00 153.00 487.50 268.00 402.50 1,818.50
Sep-21 37.00 48.50 17.00 103.50 99.50 349.50 526.50 15.00 311.00 1,507.50
Oct-21 101.00 4.00 13.50 464.00 723.00 130.50 309.00 256.00 296.50 2,297.50
Nov-21 105.50 13.00 6.00 6.00 117.50 39.00 346.00 40.50 427.50 1,101.00
Dec-21 92.00 16.00 281.50 558.00 148.50 66.00 415.50 460.50 2,038.00
Jan-22 2.50 26.00 20.50 77.50 518.00 439.50 103.00 128.00 1,315.00
Feb-22 26.50 401.50 565.50 267.50 111.50 1,372.50
March-22 2.50 1.50 28.50 980.00 228.00 123.00 1,363.50
April-22 47.00 600.00 188.25 835.25
May-22 2.00 34.50 12.00 22.00 59.00 447.50 287.00 53.00 917.00
June-22 69.50 16.50 462.50 28.50 69.50 368.50 140.00 2.00 1,157.00
July-22 88.50 61.50 192.50 165.00 7.25 514.75
Aug-22 0.5 280.5 165.5 48.5 114.25 609.25
Sep-22 28.5 45 64 20.5 9.5 167.50
Oct-22 5.5 36 26 26 21.5 16.5 131.50
Nov-22 19 6 509 13.5 54.75 34.5 636.75
Dec-22 3 13 95.75 54.25 57.5 223.50
Jan-23 9.5 3.75 120.5 67 200.75
Feb-23 30.5 293.5 48.5 372.50
March-23 2 17.75 7 14.5 39.75 81.00
-
-
-
Total 33.50 1,335.75 858.50 14.50 711.50 237.50 6,206.50 3,852.50 9,189.25 2,598.50 212.50 177.50 10,445.00 104.50 756.00 3,343.00 5,063.50 45,140.00
LUCKNOW PLANT PRODUCTION REPORT (PLANT CODE-1054)
BATCHING PLANT (CUM) CAMP-2 (ATEPL Plant)(Upto March.2023) ATPL LKEP to ATPL LRR
M-40 M-45
MONTH M-15 M-15 M-20 M-25 M-30 M-35 M-35 M-35 M-35 M-40 Pile M-40 M-40 Pile M-45
M-10 PILE PILE RCC RCC Pile RCC RCC CEMEN M-50 M-55
Cement FLY ASH Cement CEMENT Cement CEMENT FLY ASH CEMENT FLYASH Cement FLYAS Cement FLYASH CEME T
H NT
Dec-22 5 5.00
Jan-23
Feb-23
March-23 -
Total - - - - 5.00 - - - - - - - - - - - - 5.00