F2.35 Project Overview

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 54

Deutsc Russi ZF Friedrichshafen AG

h an
English

Project scheduling Supplier Part definition

Quality characteristics
SQ-sheet FW-characteristics FWD-characteristics QW-caracteristics

Current ZF part Predecessor ZF


Date of initial sample Current ZF
Milestone Creditor number Supplier Name Part name number part number
[DD.MM.YYYY] drawing index
[xxxx.xxx.xxx] [xxxx.xxx.xxx]
Number of
released, Total number Number of Planned Total number planned Total number Number of Number of fail-
capable
open of FWs capable FWs 100% checks of FWDs 100% checks of QWs capable QWs safe QWs
FWDs

QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 1 of 54


QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 2 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 3 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 4 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 5 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 6 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 7 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 8 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 9 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 10 of 54
Project Overview

Product maturity

cteristics Quality specification document FMEA DMC Feasibility Study


All characteristics
PW-caracteristics (only for semi-finished parts) KW-characteristics 0000.703.213 Product/process Product Process Part KLT, pallet Supplier

Level of fulfilment
accepted, accepted, % not required,
Total number of Number of Number of fail- Total number Number of fail-safe Total number of Number of deviating Level of released, approved,
rejected, Number rejected, (if supplier has released,
PWs capable PWs safe PWs of KWs KWs characteristics characteristics design fulfilment % open with deviation, rejected
open open open
responsability)

QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 11 of 54


QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 12 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 13 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 14 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 15 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 16 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 17 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 18 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 19 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 20 of 54
Process maturity Release of product and pro

Status of project acc. to


QD83
Warranty
Capacity for
Finished process Process qualification Approval of process agreement
Level of Availability of serial Level of Availability of serial test Level of serial maturity Approval by supplier
Availability of serial process definition finished date by supplier accepted,
fulfilment % tools fulfilment % equipment fulfilment % validation R&D
[DD.MM.YYYY] [DD.MM.YYYY] [DD.MM.YYYY] rejected,
available
open
rated by supplier

QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 21 of 54


QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 22 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 23 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 24 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 25 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 26 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 27 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 28 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 29 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 30 of 54
Release of product and process

Q-sampling type Q-sampling status

F = released
FA = released on parole
Initial sample / prototype
A = rejected

QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 31 of 54


QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 32 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 33 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 34 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 35 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 36 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 37 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 38 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 39 of 54
QD83 F2.35 - Project Overview - Rev. 1.2 - Feb. 2019 Page 40 of 54
ZF Friedrichshafen AG
Business Unit Automated Transmissions
Q-maturity level purchased parts
Quality characteristics are "special
characteristics" according to QR83 chapter 1.7
Site Saarbrücken Series monitoring sheet
& 1.8

Project scheduling Supplier Part definition Product maturity Process maturity

Quality characteristics Quality specification document FMEA DMC Feasibility Study Status of project acc. to
All characteristics
SQ-sheet FW-characteristics FWD-characteristics QW-caracteristics PW-caracteristics (only for semi-finished parts) KW-characteristics 0000.703.213 Product/process Product Process Part KLT, pallet Supplier QR83
Current ZF part Predecessor ZF Finished process Process qualification
Date of initial sample Current ZF Level of Availability of serial Level of Availability of serial test Level of
Milestone Creditor number Supplier name Part name number part number Level of Availability of serial process definition finished date
[DD.MM.YYYY] drawing index Number of accepted, accepted, not required, fulfilment % tools fulfilment % equipment fulfilment %
[xxxx.xxx.xxx] [xxxx.xxx.xxx] released, Total number Number of Planned Total number planned Total number Number of Number of fail- Total number of Number of Number of fail- Total number Number of fail-safe Total number of Number of deviating fulfilment % Level of released, approved, [DD.MM.YYYY] [DD.MM.YYYY]
capable rejected, Number rejected, (if supplier has released, rated by supplier
open of FWs capable FWs 100% checks of FWDs 100% checks of QWs capable QWs safe QWs PWs capable PWs safe PWs of KWs KWs characteristics characteristics fulfilment % open with deviation, rejected
FWDs open open design open
responsability)

12/15/2015 2/1/2015 123456 Example Ltd. Part 1 0123.456.789 a 1234.567.890 released 10 9 1 10 6 4 20 12 11 5 3 2 5 5 45 2 accepted 1087.700.345 accepted 82% 95% not required released approved 2 close-to-production process (C - sample) 20% prototype tool 35% surrogate inspection equipment 47% 11/18/2015 11/19/2015
12/15/2015 Part 2
12/15/2015 Part 3
2/15/2016 Part 1
DataMatrix-Code on the part or
2/15/2016 Part 2
the Euro container(KLT)/pallet
2/15/2016 Part 3 Acceptance of th Quality Specification for supplies to ZF Acceptance of part-specific quality Please enter the status of the inspection equipment at the
Please enter the status of the manufacturing process at the date of date of the milestone.
Plants of the Business Unit Automatic Transmissions specifications
Function-Relevant Function-Relevant characteristics the milestone.
Characteristics of importance to processes according to (0000.703.213)
characteristics according to with Special Documentation
QR83 chapter 1.7
QR83 chapter 1.7 according to QR83 chapter 1.8
Is enough capcacity available to prove
that the manufacturing processes fulfill
Prototypes are draft samples of a later series production, which are used to test function and durability characteristics. According to the project development phases qualitative and quantitative requirements
(gates) , a distinction between A-, B-, C- and D-sample is made: Customer relevant characteristics according to Please enter the overall rating of the under high workload in the preliminary
Please enter the status of the tool at the date of series phase?
QR83 chapter 1.7 project status at the date of the
- A-samples are functional models for confirmation of the concept. the milestone.
milestone.
- B-samples: same as A-samples, however appropriate for first benchmark test and testing in vehicle, installation dimensions comply with series. Please insert the degree of
Characteristics of importance to processes according
- C-samples: parts from close-to-production or serial tools and close-to-production processes. completion. Enter the number
to QR83 chapter 1.7 (only for semi-finished parts)
(0-100) without percent sign in
Preliminary series samples (D-samples) are parts, which are manufactured, assembled and checked with series tools, series equipment and series processes. Parts, the respective cell (percent sign
that pass through initial sampling with the objective of series release, originate from these samples. is added automatically).
  
Initials samples are products that are manufactured under series conditions (machine, plant, operating and test equipment, processing conditions).
urity Release of product and process

Q-sampling type Q-sampling status


Warranty
Capacity for
Approval of process agreement
serial maturity Approval by supplier
by supplier accepted, F = released
validation R&D
[DD.MM.YYYY] rejected, FA = released on parole
available Initial sample / prototype
open A = rejected

yes 11/28/2015 yes accepted prototype (A - sample) FA

Status of the warranty


agreement

Is enough capcacity available to prove


that the manufacturing processes fulfill
qualitative and quantitative requirements
under high workload in the preliminary
series phase?

Please document the process


aproval with the form for initial
samples.
ZF Friedrichshafen AG
Business Unit Automatgetriebe
Standort Saarbrücken

Projektterminplan Lieferant Bautei

Erstmustertermin
Meilenstein Kreditornummer Lieferantenname Teilebenennung
[TT.MM.JJJJ]

12/15/2015 2/1/2015 123456 Beispiel GmbH Bauteil 1


12/15/2015 Bauteil 2
12/15/2015 Bauteil 3
2/15/2016 Bauteil 1
2/15/2016 Bauteil 2
2/15/2016 Bauteil 3

Prototypen sind Entwurfsmuster einer späteren Serienfertigung, die zur Erprobung von Funktions- und Dauerhaltbark
einzelnen Projektentwicklungsphasen (Gates) unterscheidet man A-, B-, C- und D-Muster:

- A-Muster sind erste Funktionsmuster zur Bestätigung des Konzeptes


- B-Muster: Wie A-Muster, jedoch geeignet für erste Erprobung auf dem Prüfstand und im Fahrzeug, Einbaumaße en
- C-Muster: Teile aus seriennahen oder serienfallenden Werkzeugen und seriennahen Fertigungsverfahren.  

 
Vorserienmuster (D-Muster) sind Teile, die mit Serienwerkzeugen, Serienvorrichtungen und Serienprozessen gefertig
werden Teile entnommen, mit welchen eine Erstbemusterung durchgeführt wird, mit dem Ziel der Serienfreigabe.

  
Erstmuster sind unter Serienbedingungen (Maschine, Anlage, Betriebs- und Prüfmittel, Bearbeitungsbedingungen) g
 
Serienüberwachungsblatt

Bauteildefinition

SQ-Blatt FW- Merkmale


Vorgänger
Aktuelle Aktueller
ZF -
ZF-Teilenummer ZF-
Teilenummer Anzahl
[xxxx.xxx.xxx] Zeichnungs-index freigegeben, Anzahl
[xxxx.xxx.xxx] FWs
offen fähiger FWs
insgesamt

0123.456.789 a 1234.567.890 freigegeben 10 9

Funktionswichtige Merkmale
nach QR83 Kapitel 1.7

ktions- und Dauerhaltbarkeitseigenschaften dienen. Entsprechend der

ahrzeug, Einbaumaße entsprechen der Serie.


gungsverfahren.  

Serienprozessen gefertigt, montiert und geprüft sind. Aus diesen Mustern


Ziel der Serienfreigabe.

rbeitungsbedingungen) gefertigte und geprüfte Produkte.


Qualitätsmerkmale sind "Besondere Merkmale"
gemäß QR83 / Kapitel 1.7 & 1.8

Qualitätsmerkmale
W- Merkmale FWD- Merkmale QW- Merkmale

geplante Anzahl Anzahl geplante Anzahl Anzahl Anzahl


100% FWDs fähiger 100% QWs fähiger abgesicherter
Prüfungen insgesamt FWDs Prüfungen insgesamt QWs QW-Merkmale

1 10 6 4 20 12 11

ge Merkmale Funktionswichtige und


Prozesswichtige Merkmale nach QR83 Kapitel 1.7
pitel 1.7 Dokumentationspflichtige Merkmale
nach QR83 Kapitel 1.8
Produktreife

Alle Merkmale
PW-Merkmale (nur für Halbfertigteile) KW- Merkmale

Anzahl Anzahl Anzahl Anzahl


Anzahl geplante 100%
fähiger KWs abgesicherter KW- Merkmale
PWs insgesamt Prüfungen
PWs insgesamt Merkmale insgesamt

5 3 2 5 5 45

Akzeptanz des Lastenheftes Qu


an ZF Werke des Geschäftfelds
erkmale nach QR83 Kapitel 1.7 (0000.703.213)

Kundenwichtige Merkmale nach QR83


Kapitel 1.7

Prozesswichtige Merkmale nach QR83 Kapitel 1.7


(ausschließlich relevant für Halbfertigteile)
Q-Projektreifegrad Kaufteile

Lastenheft FMEA
Alle Merkmale
0000.703.213 Produkt/Prozess Produkt

Anzahl akzeptiert, akzeptiert, Erfüllungsgrad %


Merkmale abgelehnt, Nummer abgelehnt, (Bei Lieferanten mit
Entwicklungs-
abweichend offen offen verantwortung)

2 akzeptiert 1087.700.345 akzeptiert 82%

Akzeptanz des Lastenheftes Qualität für Lieferungen Akzeptanz bauteilspezifischer


an ZF Werke des Geschäftfelds Automatgetriebe Lastenhefte
(0000.703.213)
eile

FMEA DMC HSA


Prozess Bauteil KLT, Palette Lieferant

nicht vorhanden, bestätigt,


freigegeben,
Erfüllungsgrad % freigegeben, mit Abweichung,
offen
offen abgelehnt

95% nicht vorhanden freigegeben bestätigt

DataMatrix-Code auf Bauteil oder


Kleinladungsträger(KLT)/Palette
Herstellbarkeitsanalyse

Bitte den Erfüllungsgrad angeben.


Dabei die Zahl (0-100) ohne
nachfolgendes Prozentzeichen in die
jeweilige Zelle eintragen
(Prozentzeichen wird automatisch
ergänzt).
Proze

Projektstatus Kaufteile
nach QR83

Serienprozess Erfüllungs- Serienwerkzeug


vorhanden grad % vorhanden
Bewertung
Lieferant

2 Vorserienprozess (A,B - Muster) 20% Prototypwerkzeug

Herstellbarkeitsanalyse Bitte den Status des Herstellprozesses zum


Meilenstein eintragen.

Bitte die Gesamtbewertung des Bitte den Status des Werkzeu


Projektstatus zum jeweiligen Meilenstein eintragen.
Meilenstein eintragen.
Prozessreife

Prozessdefinition Prozess-qualifikation
Erfüllungs- Serienprüfmittel Erfüllungs- abgeschlossen abgeschlossen
grad % vorhanden grad % Datum Datum
[TT.MM.JJJJ] [TT.MM.JJJJ]

35% Ersatzprüfmittel 47% 11/18/2015 11/19/2015

Bitte den Status der Prüfmittel zum


Meilenstein eintragen.

Steht ausreichend Kapazität zur Verfügung,


Bitte den Status des Werkzeugs zum um in der Vorserienphase nachzuweisen,
Meilenstein eintragen. dass die Produktionsprozesse in der Lage
sind unter höchster Fertigungsauslastung
den qualitativen und quantitativen
Anforderungen gerecht zu werden?
Produkt- und Prozessfreigab

Kapazität zur GWV


Prozessfreigabe Entwicklungs-
Validierung akzeptiert,
Lieferant freigabe Lieferant
Serienreife abgelehnt,
[TT.MM.JJJJ] erteilt
vorhanden offen

ja 11/28/2015 ja akzeptiert

Status der
Gewährleistungsvereinbarung

Die Prozessfreigabe bitte mit


Formblatt für Erstbemusterung
dokumentieren.

d Kapazität zur Verfügung,


enphase nachzuweisen,
ionsprozesse in der Lage
er Fertigungsauslastung
und quantitativen
erecht zu werden?
Produkt- und Prozessfreigabe

Q-Bemusterungstyp Q-Bemusterungsstatus

F = frei
FA = frei mit Auflage
Erstmuster / Prototyp
A = abgelehnt

Prototyp B - Muster FA
Date Rev Description

3/20/2018 1.0 First publication of revised form

Extension of the proposed Date Entries for


cells in colum A (Dropdown) ; deletion of
1/31/2019 1.1
previous proposed dates; replacement with
dates up to 15.02.2022
2/12/2019 1.2 Changing some language settings
Remark