Sketch Plan: Lot 1033-B, Csd-07

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LMB Form No.

GSD-C-1

LINE
TECHNICAL DESCRIPTIONS
BEARING DISTANCE
CERTIFICATION
"Under pains of administrative sanction, it is hereby
N ORIGINAL SURVEY Surveyed: Approved:
Cad-
BOUNDARY certified that the provisions of Sections 379 and 586 of the
Revised Manual Land Surveying Regulations in the Lot No. Patent No. Date
1 2 35.13 m. Philippines were faithfully complied, reflecting on the plan all Decree No. Date LRC Rec. No.
2 3 12.17 m. permanent structures on the area. Further, the person for
3 4 35.08 m. whom this survey was conducted exercises possessory OCT No. Dated Issued to
4 1 12.30 m. rights over the area as well as the permanent improvements TCT No. Dated Issued to
LOT 1033-B-PART- (A=85 Sq.m.)
found therein which was manifestly observed by the
undersigned during the conduct of the actual ground survey."
1 2 17.58 m. SUBDIVISION
2
3
3
4
2.46
35.13
m.
m. SKETCH PLAN

E=20,392.539
4 5 2.39 m. MILAGROS C. MOSQUEDA
Geodetic Engineer
5 1 17.54 m. Lot 1033-B, Csd-07
LOT 1033-B-PART- (A=129 Sq.m.)
1 2 7.35 m. AS SURVEYED FOR
2 3 17.62 m.
3
4
4
1
7.34
17.58
m.
m.
ALAN DANGOY ET AL.
LOT 1033-B-PART- (A=215 Sq.m.)
SITUATED IN THE
1 2 17.54 m.
2 3 9.78 m.
3 4 35.08 m. BARANGAY OF : CANAMUCAN
4 5 2.50 m.
MUNICIPALITY OF : COMPOSTELA
5 6 17.62 m.
PROVINCE OF : CEBU
6 1 7.35 m.
ISLAND OF : CEBU
Containing an area of 429 Sq.M.
PPCS-TM/PRS-92 ZONE NO: IV
BEARINGS : TRUE
SCALE 1: 200
ide)

Old P.S. 1 N=20,921.779 0 1 2 3 4 5 10 20


Lot 1
m. W

3 033-
A, Cs
d-07 I hereby certify that this is a correct plan of the survey made by me personally or
0.00

2 under my direct supervision in conformity with the provisions of RA 8560, as amended,


otherwise known as "The Geodetic Engineering Act of 1998" and the rules and
ad (2

4
regulations of the Department of Environment and Natural Resources.
o

I further certify that this plan accurately indicates the boundaries of the property as
nal R

pointed to me on the ground by the survey claimant or his authorized representative


LOT and/or based on the available legal and/or official technical documents and that I
Natio

103
3-B- assume full responsibility for the technical correctness of the survey and the accuracy
A=8 PA
5 Sq.m RT-1 of the monument setting.
.
LOT 1 Date of Survey:
103 1
3
A=1 -B-P 1
3 29 S ART MILAGROS C. MOSQUEDA
q.m -2
. GEODETIC ENGINEER
5
Valid Until: Nov. 2025 PRC ID No. 3460 Date 02-06-1985
N=20,910.46 2
Old P.S. 4 PTR No. 2304634 Date 01-04-2023
4 Old P.S.
4 TIN No. 118-918-373

ore)
5

h
Seas
2 Republic of the Philippines
2 LOT
1 033 Department of Environment and Natural Resources

From
A=2 -B-P
6 15 S RA Technical Services
q.m T-3
.

Wide
Regional Office VII
Ecotech Center, Sudlon, Lahug, Cebu City

0 m.
The survey plotted herein is found to be in order as per submitted survey returns

12.0
of the Geodetic Engineer and therefore recommended for approval.

0 TO
d 9.0
Lot 1 MARIA FE C. BAQUIRQUIR
032, ASST.CHIEF, SURVEYS AND MAPPING DIVISION
Pls-9

a Be
82 3
Date Approved:
Old P.S. 3

d Se
This approved plan, however, shall not be construed as title to the land.

(Drie
LEONISITA A. SEMBLANTE
CHIEF, SURVEYS AND MAPPING
DIVISION

Date Submitted / Documents


Date Returned Remarks Received by:
Re-submitted

Printed name & Signature Date


Position verified by: ..........................................................................................................
Projected on P.M. ................................ N ............................ E. by: .................................
Field Notes checked by: ...................................................................................................
Traverse Computation checked by: ..................................................................................
Astronomical Computation checked by: ...........................................................................
NOTE: Lot Data Computation checked by: ..................................................................................
All corners marked "Old P.S." are cyl. conc. mons. 15x60 cm. With my conformity CADD/Processed by: ........................................................................................................
All corners not otherwise described are P.S. cyl. conc. mons. 15x40 cm. CERTIFICATION Traced by: .........................................................................................................................
I hereby certify to the completeness and technical Checked & Verified by: .....................................................................................................
Principal use of the land: RESIDENTIAL ANTONIO DANGOY ET AL.
correctness of the herein survey. Errors in this survey
Original cadastral survey claimant is ANTONIO DANGOY ET AL. which maybe found out later after the approval of the Land Owner ADDITIONAL INFORMATION AFTER DATE OF APPROVAL
Surveyed in accordance with the survey authority issued by CENRO (FOR SIMPLE SUBDIVISON ONLY)
D.E.N.R. and which may prejudice the interest of the lot
dated per inspection report by owner, shall be my professional responsibility pursuant to
Sec. 24 of the Republic Act 8560.
Cadastral cost in the amount of has been paid under O.R. No. dated VERIFICATION FEE
This lot is a portion of or identical to a previously approved isolated survey Lot 1033, Pls-982
Paid Under
This lot is within Alienable and Disposable, Block No. L.C. Project No.
E=20,407.42

MILAGROS C. MOSQUEDA O.R. No.


per L.C. Map No. of certified on
Geodetic Engineer Date :
as per certification issued by CENRO dated
This lot is outside P.P. No.
3 Lot/s 15 Corners
S
SU RVEY I NG
DA Printed by:
E

O
QU

FF

S MOSQUEDA SURVEYING OFFICE


MOS

I CE

19 85

P Address: Poblacion, Lilo-an, Cebu


Geodetic Surveying &
Authorized by: Land Management Bureau
Engineering Services
Until February 08, 2026