GENERAL NOTES

POWER OUTLETS
GROUNDING DETAILS:

100mm2 BCW
GROUNDING TERMINAL

LIGHTING SYSTEM COPPER GROUNDING ROD


20mm x 3m

CLAMP

GROUNDING, BONDING AND LIGHTNING NOTE: LOCATION BASED ON ACTUAL


PROTECTION SITE CONDITION

SWITCHBOARD AND COMPONENTS

3.0 METERS FROM


FINISH FLOOR LINE

2 GEN. NOTES & GROUNDING DETAILS

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 1
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
10
1

X
N
4642 4500 4500 4500 4500 5910 17800 5910 17800

L
LEGENDS

2X40W LED LIGHT

K
5W 6" DL
3 WAY 2 GANG

5684

CHB WALL: 3.00 METERS


NO STEEL CAGE ABOVE

VERIFY ACTUAL
1 GANG SWITCH

CUTTER

HEIDELBERGLETTERPRESS
8854
2 GANG SWITCH
J

EXISTING FIREWALL SEPARATING

EXISTING FIREWALL SEPARATING


STEEL CAGE WALL: 3.00 METERS

STEEL CAGE WALL: 3.00 METERS

WAREHOUSE 110 & 111

WAREHOUSE 109 & 110


CHB WALL: 3.00 METERS

CHB WALL: 3.00 METERS

CUTTER
3WAY SWITCH
21869
6000

LP
1

CUTTER

NEWPRINTER
H

VERIFY ACTUAL

RYOBI5-COLOR
6000

CUTTER
LP
2

SLIDING DOORS
STEEL CAGE
G

SLIDING DOORS
LP

STEEL CAGE
4 LP
CHB WALL: 3.00 METERS 5 CHB WALL: 3.00 METERS
STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS
SLIDING DOORS
STEEL CAGE
6000

3700

RYOBI5-COLOR
HEIDELBERG SORM
F

10260

STEEL CAGE WALL: 3.00 METERS


CHB WALL: 3.00 METERS

HEIDELBERGLETTERPRESS2-COLOR
6000

LP
3
LP LP
3 6
E

LP
NOTE: THE PRINTING MACHINES IN THIS FLOOR
2
TRANSACTION WINDOWS

PLAN ARE JUST PLACEHOLDERS.


THEY ARE FLEXIBLE AND CAN STILL BE MOVED

AUTOPRINTVDP
AROUND TO ACCOMMODATE
THE MOST EFFICIENT LAYOUT AS DETERMINED
BY THE END-USERS. HEIDELBERGHELICOPTER
6000
D

16400
LP
4
COLTECCOLLATOR
TRANSACTION WINDOWS
6000

DPB-500GLUER W EXHAUST
C

CTP W AC
HAND
SINK

CHEMICALS
6000

STORAGE
PCSO RECORD STORAGE

SLOP
SINK
1600
1

1
HAND
SINK

RISER
2

2
RISER RISER
3

3
EXIT EXIT EXIT EXIT EXIT
B

EXIT

EXIT
EXIT
LP
5
UP 1

UP 1

UP 1
DN

DN

DN
3

3
LP
4500

15

15

15
2

2
1
2

2
14

14

14
1

1
3

3
13

13

13
4

4
12

12

12
5

5
11

11

11
6

6
10

10

10
7

7
9

9
8

8
A

GROUND FLOOR
1 LIGHTING LAYOUT

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 2
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
LEGENDS
2x40 WATTS LED LIGHT

3WAY SWITCH

2 GANG SWITCH

RISER RISER RISER

15
1

2
A: 57.75 m2 15
1

2
A: 57.75 m2 15
1

2
A: 57.75 m2
SPPD OFFICE SPPD OFFICE SPPD LOUNGE
14 14 14
3 3 3
13 13 13
4 4 4
12

11
5 (W/ AC) CH=2700 12

11
5 (W/ AC) CH=2700 12

11
5 (W/ AC) CH=2700
6 6 6
10 10 10
7 7 7
9 9 9
8 8 8

LIGHTING LAYOUT
1 SECOND FLOOR PLAN

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY R. PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DIVISION
E S -

GSIS WAREHOUSE
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY: EE - 2.1
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
10
1

X
N
4642 4500 4500 4500 4500 5910 17800 5910 17800

LEGENDS

L
DUPLEX OUTLET
EL

EMERGENCY LIGHT
K
K

5684

CHB WALL: 3.00 METERS


NO STEEL CAGE ABOVE

VERIFY ACTUAL

HEIDELBERGLETTERPRESS
CUTTER
8854
J

EXISTING FIREWALL SEPARATING


WAREHOUSE 109 & 110
EL
CUTTER
21869
6000

CHB WALL: 3.00


METERS
STEEL CAGE WALL:
3.00 METERS

CUTTER
STEEL CAGE WALL: 3.00 METERS

NEWPRINTER
CHB WALL: 3.00 METERS
H

VERIFY ACTUAL

RYOBI5-COLOR
10400
6000

CUTTER
SLIDING DOORS
STEEL CAGE
SLIDING DOORS
STEEL CAGE
PP
G

01 PP
02
CHB WALL: 3.00 METERS
STEEL CAGE WALL: 3.00 METERS
SLIDING DOORS
STEEL CAGE
6000

MAIN CIRCULATION CENTER


6800 11200 3700

HEIDELBERG SORM
(CAN ACCOMMODATE

STILL BE MOVED AROUND


MACHINES IN THIS FLOOR

MOST EFFICIENT LAYOUT


TO ACCOMMODATE THE

AS DETERMINED BY THE
ARE FLEXIBLE AND CAN

RYOBI5-COLOR
PLACEHOLDERS. THEY
NOTE: THE PRINTING
FORKLIFTS)

PLAN ARE JUST


8000

END-USERS.
F

10260

10260

EL
4517 3600 6600 6100 1700
VERIFY VERIFY VERIFY
6000

ACTUAL ACTUAL ACTUAL HEIDELBERGLETTERPRESS2-COLOR

3500

EL
PP
PP
03 04
E

HEIDELBERGHELICOPTER
TRANSACTION WINDOWS

AUTOPRINTVDP
8130
6000

PP
06
16360
EL
D

16400
COLTECCOLLATOR
TRANSACTION WINDOWS
6000

2000 5600 4500 2000


8230

PP
09
PP

EL

4200
11
C

CTP(W AC)

8500
1100

HAND
SINK

CHEMICALS
6000

3500 2000 5248 4852

STORAGE
2000
PCSO RECORD STORAGE

4100
SLOP
SINK
2400

1000
1600

1600
1

1
HAND
SINK

2
RISER RISER RISER
3

3
B

PP PP PP
05 07 08
UP 1

UP 1

UP 1
DN

DN

DN
3 15

3 15

3 15
4500

2
2

2
14

14

14
1 13

1 13

1 13
3

3
4

4
12

12

12
5

5
11

11

11
6

6
10

10

10
7

7
EL EL EL
9

9
8

8
A

GROUND FLOOR
1 POWER LAYOUT

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 3
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
LEGENDS
DUPLEX OUTLET
EL

EMERGENCY LIGHT

RISER RISER RISER


EL

EL
A: 57.75 m2 A: 57.75 m2 A: 57.75 m2
EL

1 1 1
15 15 15
2 2 2
14

13
3

4
SPPD OFFICE 14

13
3

4
SPPD OFFICE 14

13
3

4
SPPD LOUNGE
12

11
5

6
(W/ AC) CH=2700 12

11
5

6
(W/ AC) CH=2700 12

11
5

6
(W/ AC) CH=2700
10 10 10
7 7 7
9 9 9
8 8 8

SECOND FLOOR
1 POWER LAYOUT

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DIVISION
E S -

GSIS WAREHOUSE
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY: EE - 3.1
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
10

X
1

8
N
4642 4500 4500 4500 4500 5910 17800 5910 17800

L
LEGENDS
EQUIPMENT PANEL 1
ENCLOSED CB
K

5684

CHB WALL: 3.00 METERS


NO STEEL CAGE ABOVE

VERIFY ACTUAL

CUTTER
8854

HEIDELBERGLETTERPRESS
J

EXISTING FIREWALL SEPARATING


STEEL CAGE WALL: 3.00 METERS

STEEL CAGE WALL: 3.00 METERS

WAREHOUSE 110 & 111


CHB WALL: 3.00 METERS

CHB WALL: 3.00 METERS

CUTTER
21869
6000

CHB WALL: 3.00


METERS
STEEL CAGE WALL:
3.00 METERS

CUTTER
STEEL CAGE WALL: 3.00 METERS

NEWPRINTER
CHB WALL: 3.00 METERS
H

VERIFY ACTUAL

RYOBI5-COLOR
10400
6000

CUTTER
SLIDING DOORS
STEEL CAGE
SLIDING DOORS
STEEL CAGE
G

SLIDING DOORS
STEEL CAGE

CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS
STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS
SLIDING DOORS
STEEL CAGE

MAIN CIRCULATION CENTER


6000

6800 11200 3700

HEIDELBERG SORM
(CAN ACCOMMODATE

STILL BE MOVED AROUND


MACHINES IN THIS FLOOR

MOST EFFICIENT LAYOUT


TO ACCOMMODATE THE

AS DETERMINED BY THE
ARE FLEXIBLE AND CAN

RYOBI5-COLOR
PLACEHOLDERS. THEY
NOTE: THE PRINTING
FORKLIFTS)

PLAN ARE JUST


8000

END-USERS.
F

10260

10260
STEEL CAGE WALL: 3.00 METERS
CHB WALL: 3.00 METERS

4517 3600 6600 6100 1700


VERIFY VERIFY VERIFY
6000

ACTUAL ACTUAL ACTUAL HEIDELBERGLETTERPRESS2-COLOR


E

HEIDELBERGHELICOPTER
TRANSACTION WINDOWS

AUTOPRINTVDP
8130
6000

16360
D

COLTECCOLLATOR
TRANSACTION WINDOWS
6000

2000 5600 4500 2000


8230

4200
C

DPB-500GLUER(W EXHAUST)

CTP(W AC)

8500
1100

HAND
SINK

CHEMICALS
6000

3500 2000 5248 4852

STORAGE
2000
PCSO RECORD STORAGE
4100
SLOP
SINK
2400

1000
1600

1600
1

1
HAND
SINK

2
3

3
B

UP 1

UP 1

UP 1
DN

DN

DN
3

3
4500

15

15

15
2

2
2

2
14

14

14
1

1
3

3
13

13

13
4

4
12

12

12
5

5
11

11

11
6

6
10

10

10
7

7
9

9
8

8
A

GROUND FLOOR
1 EQUIPMENT LAYOUT

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 4A
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
10

X
1

8
N
4642 4500 4500 4500 4500 5910 17800 5910 17800

L
LEGENDS
EQUIPMENT PANEL 2

K
ENCLOSED CB

5684

CUTTER

HEIDELBERGLETTERPRESS
EXISTING FIREWALL SEPARATING
STEEL CAGE WALL: 3.00 METERS

STEEL CAGE WALL: 3.00 METERS

WAREHOUSE 110 & 111


CHB WALL: 3.00 METERS

CHB WALL: 3.00 METERS

CUTTER
21869
6000

CHB WALL: 3.00


METERS
STEEL CAGE WALL:
3.00 METERS

CUTTER

NEWPRINTER
H

RYOBI5 COLOR
6000

CUTTER
SLIDING DOORS
STEEL CAGE
SLIDING DOORS
STEEL CAGE
G

SLIDING DOORS
STEEL CAGE
CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS
STEEL CAGE WALL: 3.00 METERS
SLIDING DOORS STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS
STEEL CAGE
6000

MAIN CIRCULATION CENTER


6800 11200 3700

HEIDELBERG SORM
(CAN ACCOMMODATE

RYOBI5 COLOR
FORKLIFTS) 8000
F

10260

10260
STEEL CAGE WALL: 3.00 METERS
CHB WALL: 3.00 METERS

4517 3600 6600 6100 1700


VERIFY VERIFY VERIFY
6000

ACTUAL ACTUAL ACTUAL HEIDELBERGLETTERPRESS2 COLOR


E

HEIDELBERGHELICOPTER
TRANSACTION WINDOWS

AUTOPRINTVDP
8130
6000

16360
D

COLTECCOLLATOR
TRANSACTION WINDOWS
6000

2000 5600 4500 2000

8230

4200
C

DPB 500GLUER(W EXHAUST)

CTP(W AC)

8500
1100

HAND
SINK

CHEMICALS
6000

3500 2000 5248 4852

STORAGE
2000
PCSO RECORD STORAGE

4100
SLOP
SINK
2400

1000
1600

1600
1

1
HAND
SINK

2
3

3
B

UP 1

UP 1

UP 1
DN

DN

DN
3

3
4500

15

15

15
2

2
2

2
14

14

14
1

1
3

3
13

13

13
4

4
12

12

12
5

5
11 10

11 10

11 10
6

6
7

7
9

9
8

8
A

GROUND FLOOR
1 EQUIPMENT LAYOUT

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 4B
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
10
1

X
N
4642 4500 4500 4500 4500 5910 17800 5910 17800

L
K

5684

CHB WALL: 3.00 METERS


NO STEEL CAGE ABOVE

VERIFY ACTUAL

HEIDELBERGLETTERPRESS
CUTTER
8854
J

EXISTING FIREWALL SEPARATING

EXISTING FIREWALL SEPARATING


STEEL CAGE WALL: 3.00 METERS

STEEL CAGE WALL: 3.00 METERS

WAREHOUSE 110 & 111

WAREHOUSE 109 & 110


CHB WALL: 3.00 METERS

CHB WALL: 3.00 METERS

CUTTER
21869
6000
CHB WALL: 3.00
METERS
STEEL CAGE WALL:
3.00 METERS

CUTTER
STEEL CAGE WALL: 3.00 METERS

NEWPRINTER
CHB WALL: 3.00 METERS
H

VERIFY ACTUAL

RYOBI5-COLOR
10400
6000

CUTTER
SLIDING DOORS
STEEL CAGE
SLIDING DOORS
STEEL CAGE
G

SLIDING DOORS
STEEL CAGE
CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS
STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS

SLIDING DOORS
STEEL CAGE

MAIN CIRCULATION CENTER


6000

6800 11200 3700

HEIDELBERG SORM
(CAN ACCOMMODATE

STILL BE MOVED AROUND


MACHINES IN THIS FLOOR

MOST EFFICIENT LAYOUT


TO ACCOMMODATE THE

AS DETERMINED BY THE
ARE FLEXIBLE AND CAN

RYOBI5-COLOR
PLACEHOLDERS. THEY
NOTE: THE PRINTING
FORKLIFTS)

PLAN ARE JUST


8000

END-USERS.
F

10260

10260
STEEL CAGE WALL: 3.00 METERS
CHB WALL: 3.00 METERS

4517 3600 6600 6100 1700


VERIFY VERIFY VERIFY
6000

ACTUAL ACTUAL ACTUAL HEIDELBERGLETTERPRESS2-COLOR

3500
E

HEIDELBERGHELICOPTER
TRANSACTION WINDOWS

AUTOPRINTVDP
8130
6000

16360
D

16400
COLTECCOLLATOR
TRANSACTION WINDOWS
6000

2000 5600 4500 2000

8230
DPB-500GLUER(W EXHAUST)

4200
C

CTP(W AC)

8500
1100

HAND
SINK

CHEMICALS
6000

3500 2000 5248 4852

STORAGE
2000
PCSO RECORD STORAGE

4100
SLOP
SINK
2400

1000
1600

1600
1

1
HAND
SINK

2
3

3
B

UP 1

UP 1

UP 1
DN

DN

DN
3

3
4500

15

15

15
2

2
2

2
14

14

14
1 13

1 13

1 13
3

3
4

4
12

12

12
5

5
11 10

11 10

11 10
6

6
7

7
9

9
8

8
A

MDP PANEL TO METER CENTER 2

MANHOLE
ACCU PANRL TO METER CENTER 1

1 TAPPING POINT REP.

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 5
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
10
1

X
N
4642 4500 4500 4500 4500 5910 17800 5910 17800

L
K

5684

CHB WALL: 3.00 METERS


NO STEEL CAGE ABOVE

VERIFY ACTUAL

HEIDELBERGLETTERPRESS
CUTTER
8854
J

EXISTING FIREWALL SEPARATING

EXISTING FIREWALL SEPARATING


STEEL CAGE WALL: 3.00 METERS

STEEL CAGE WALL: 3.00 METERS

WAREHOUSE 110 & 111

WAREHOUSE 109 & 110


CHB WALL: 3.00 METERS

CHB WALL: 3.00 METERS

CUTTER
21869
6000
CHB WALL: 3.00
METERS
STEEL CAGE WALL:
3.00 METERS

CUTTER
STEEL CAGE WALL: 3.00 METERS

NEWPRINTER
CHB WALL: 3.00 METERS
H

VERIFY ACTUAL

RYOBI5-COLOR
10400
6000

CUTTER
SLIDING DOORS
STEEL CAGE
SLIDING DOORS
STEEL CAGE
G

SLIDING DOORS
STEEL CAGE
CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS CHB WALL: 3.00 METERS
STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS STEEL CAGE WALL: 3.00 METERS

SLIDING DOORS
STEEL CAGE

MAIN CIRCULATION CENTER


6000

6800 11200 3700

HEIDELBERG SORM
(CAN ACCOMMODATE

STILL BE MOVED AROUND


MACHINES IN THIS FLOOR

MOST EFFICIENT LAYOUT


TO ACCOMMODATE THE

AS DETERMINED BY THE
ARE FLEXIBLE AND CAN

RYOBI5-COLOR
PLACEHOLDERS. THEY
NOTE: THE PRINTING
FORKLIFTS)

PLAN ARE JUST


8000

END-USERS.
F

10260

10260
STEEL CAGE WALL: 3.00 METERS
CHB WALL: 3.00 METERS

4517 3600 6600 6100 1700


VERIFY VERIFY VERIFY
6000

ACTUAL ACTUAL ACTUAL HEIDELBERGLETTERPRESS2-COLOR

3500
E

HEIDELBERGHELICOPTER
TRANSACTION WINDOWS

AUTOPRINTVDP
8130
6000

16360
D

16400
COLTECCOLLATOR
TRANSACTION WINDOWS
6000

2000 5600 4500 2000

8230
DPB-500GLUER(W EXHAUST)

4200
C

CTP(W AC)

8500
1100

HAND
SINK

CHEMICALS
6000

3500 2000 5248 4852

STORAGE
2000
PCSO RECORD STORAGE

4100
SLOP
SINK
2400

1000
1600

1600
1

1
HAND
SINK

2
3

3
B

UP 1

UP 1

UP 1
DN

DN

DN
3

3
4500

15

15

15
2

2
2

2
14

14

14
1 13

1 13

1 13
3

3
4

4
12

12

12
5

5
11 10

11 10

11 10
6

6
7

7
9

9
8

8
A

MDP PANEL TO METER CENTER 2

MANHOLE
ACCU PANRL TO METER CENTER 1

1 TAPPING POINT REP.

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 5A
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
STEEL CAGE

HEIDEL ERGHELICOPTER
TRANSACTION WINDOWS

A TOPRINT DP
8130
16360

16400
COLTECCOLLATOR

TRANSACTION WINDOWS
2000 5600 4500 2000

8230
DP 500GL ER W E HA ST

4200

CTP W AC

8500
1100

HAND
SINK

CHEMICALS
3500 2000 5248 4852

STORAGE
2000
PCSO RECORD STORAGE

4100
SLOP
SINK
2400
1000
1600

1600
1

1
HAND
SINK

2
3

3
UP

UP

UP
DN

DN

DN
3

3
1

1
15

15

15
2

2
2

2
14

14

14
1

1
3

3
13

13

13
4

4
12

12

12
5

5
11

11

11
6

6
10

10

10
7

7
9

9
8

8
MDP PANEL TO METER CENTER 2

MANHOLE
ACCU PANRL TO METER CENTER 1

1 TAPPING POINT REP.

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 5B
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
34.5KV MECO
POWER SUPPLY
EXISTING
NEW/PROPOSED

LOAD BREAK SWITCH, 600A, 3P, 35KV,


40KA, MOMENTARY RATING MANUALLY
POWER FUSE, 300E, AMPS GANG OPERTED
MAXIMUM, 34.5KV, 1000MVA
I.C. DISTRIBUTION TYPE, 30AMP. REFILL
UNITS

LIGHTING ARRESTER, 27KV

METER CENTER 1

FUSE CUT OUT 35KV


W/ 15 AMPS FUSE CUT OUT
REFILL UNITS 35KV W/ 10 AMPS
REFILL UNITS
3-167KVA, 1PH, 20KV-139 / 277V
METER CENTER 2
DISTRIBUTION TRANSFORMERS 3-100KVA, 1PH, 20KV-139 / 277V
DISTRIBUTION TRANSFORMERS
1000AT, 3P, ACB IN 3 SETS OF (3-80mm2 THW
NEMAR 3R ENCL.
EXISTING BREAKER
UNIT UNIT UNIT
800AT, 3P, ACB IN
300AT EXISTING BREAKER 109 110 111 NEMAR 3R ENCL.
3P 150AT 800AT 150AT
3P 3P 3P
M M

UPGRADE
EXISTING
MDP
PANEL
ACU PANEL
300AT,3P 800AT,3P EXISTING
PANEL

1 400AT,3P 300AT,3P 2
150AT,3P
EQUIPMENT 1 EQUIPMENT 2
50AT,2P 50AT,2P
4HP 1 2 4HP
50AT,2P 50AT,2P
4HP 3 4 5HP 20AT,2P 20AT,2P
70AT,2P 70AT,2P EQUIP 1 LP1 1 2 LP2
6HP 5 6 6HP PANEL 20AT,2P 20AT,2P
70AT,2P 70AT,2P LP3 3 4 LP4
6HP 7 8 6HP
EXISTING
PANEL 100AT,3P 20AT,2P 20AT,2P
70AT,2P 70AT,2P LP5 5 6 LP6
6HP 9 10 6HP
20AT,2P 20AT,2P
70AT,2P 70AT,2P
150AT,3P LP7 7 8 LP8
6HP 11 12 6HP 30AT,2P 30AT,2P
70AT,2P 30AT,2P 60AT,3P 40AT,2P PP1 9 10 PP2
6HP 13 14 SPARE 1 2
DUPLO DPB-500 DELMAR-DM-900 30AT,2P 30AT,2P
30AT,2P 40AT,2P 60AT,3P EQUIP 2 PP3 11 12 PP4
SPARE 15 16 20AT,2P 20AT,2P 3 4
SPACE
LP9 1 2 LP10
LAMINATING MACHINE MACKO 800 PANEL 30AT,2P 20AT,2P
30AT,2P 60AT,3P PP5 13 14
SPACE 17 18 SPACE 20AT,2P 20AT,2P ECRM Inc. 5 6 HEIDELBERG
LP11 3 4 LP12
300AT,3P
200AT,3P 200AT,3P
SPACE 19 20AT,2P 20AT,2P 7 8
FACP 5 6 TTC
20AT,2P 20AT,2P
LP13 7 8 LP14 XFORMER 1 XFORMER 2
60AT,2P 50AT,3P
30AT,2P 30AT,2P Stitching Machine 1 2 AVR SVC 3-30KVA
9 10 XFORMER 1
PP6 PP7
60AT,3P 60AT,3P
30AT,2P 30AT,2P CUTTER 1 3 4 CUTTER 2
PP8 11 12 PP9 AVR1 AVR2
60AT,3P 60AT,3P
30AT,2P 20AT,2P CUTTER 3 5 6 CUTTER 4
PP10 13 14 PP11 ECB ECB
60AT,3P 60AT,3P
HELICOPTER 7 8 CHILLER
RYOBI 1 RYOBI 2
60AT,3P 60AT,3P
CHILLER 9 10 BAILING MACHINE
200AT,3P 60AT,3P
MIYAKOSHI 11 12 DPB GLUER - SPARE

SPARE 13
20AT,2P 20AT,2P
14 SPARE 1 SINGLE LINE DIAGRAM

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 6
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
MDP PANEL 230V 3PHASE 3 WIRES W/ GND
Location: Ground Floor, EE Room Main: 800AT/1000AF, 3P, 230V, MCCB
CIRCUIT VOLT PHASE CURRENT OCPD
LOAD DESCRIPTION VOLTS WIRES & CONDUIT
NO AMPERE AB BC CA 3PH POLE AT AF
1 EQUIPMENT 1 230 20,521.98 12 15 12 46.2 3 400 400 3-250mm2 THHN WIRE (L) + 1-60mm2 THHN WIRE (G) in 100mm IMC
2 EQUIPMENT 2 230 183,398 12 12 12 12 3 300 400 3-175mm2 THHN WIRE (L) + 1-50mm2 THHN WIRE (G) in 90mm IMC
TOTAL CONNECTED LOAD 203,920.07 20 22.5 20 354.7

It=22(1.732)+354.7 Feeder: 2 SETS OF 3-250mm2 THHN WIRE (L) + 1-60mm2 in 100mm IMC
It= 393.7 Amps @ 80% = 314.952 Amps
Main Protection 800AT/800AF , 3P , 230V MCCB

EQUIPMENT PANEL 1 230V 3PHASE


Location: Ground Floor, EE Room Main: 400AT/400AF, 3P, 230V, MCCB
CIRCUIT VOLT PHASE CURRENT OCPD
LOAD DESCRIPTION VOLTS WIRES & CONDUIT
NO AMPERE AB BC CA 3PH POLE AT AF
1 DUPLO DPB-500 230 1265 5.5 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
2 DELMAR DM-900 230 4780.32 12 2 40 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
3 Laminating Machine 230 4780.32 12 2 40 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
4 MACKO 800 EL85P 230 2760 12 2 30 100 2-5.5mm2 THHN WIRE (L) + 1-3.5mm2 THHN WIRE (G) in 20mm IMC
5 ECRM INC. 230 690 3 2 30 100 2-5.5mm2 THHN WIRE (L) + 1-3.5mm2 THHN WIRE (G) in 20mm IMC
6 HEIDELBERG SORMZ 230 9361 40.7 3 40 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
7 TRANSFORMER 1 3 3-80mm2 THHN WIRE (L) + 1-22mm2 THHN WIRE (G) in 50mm IMC
8 AVR1 3 3-80mm2 THHN WIRE (L) + 1-22mm2 THHN WIRE (G) in 50mm IMC
9 RYOBI 1 760E 29000 145 3 200 250 3-80mm2 THHN WIRE (L) + 1-22mm2 THHN WIRE (G) in 50mm IMC
10 TRANSFORMER 2 3 3-80mm2 THHN WIRE (L) + 1-22mm2 THHN WIRE (G) in 50mm IMC
11 AVR2 3 3-80mm2 THHN WIRE (L) + 1-22mm2 THHN WIRE (G) in 50mm IMC
12 RYOBI 2 760E 29000 145 3 200 250 3-80mm2 THHN WIRE (L) + 1-22mm2 THHN WIRE (G) in 50mm IMC
TOTAL CONNECTED LOAD 78, 521.98 12 15 12 336.2

It=15(1.732)+336.2+0.25(145) Feeder: 3-250mm2 THHN WIRE (L) + 1-50mm2 in 100mm IMC


It= 398.4 Amps @ 80% = 318.744 Amps
Main Protection 400AT/400AF , 3P , 230V MCCB

1 LOAD SCHEDULE

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 7A
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
ACU PANEL 230V 3PHASE
Location: Ground Floor, EE Room Main: 300AT/400AF, 3P, 230V, MCCB
CIRCUIT VOLT PHASE CURRENT OCPD
LOAD DESCRIPTION VOLTS WIRES & CONDUIT
NO AMPERE AB BC CA 3PH POLE AT AF
1 4HP 230 6440 28 2 50 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
2 4HP 230 6440 28 2 50 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
3 4HP 230 6440 28 2 50 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
4 5HP 230 6440 28 2 50 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
5 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
6 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
7 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
8 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
9 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
10 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
11 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
12 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
13 6HP 230 9200 40 2 70 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
14 SPARE 230 3910 17 2 30 100 2-5.5mm2 THHN WIRE (L) + 1-3.5mm2 THHN WIRE (G) in 20mm IMC
13 SPARE 230 3910 17 2 30 100 2-5.5mm2 THHN WIRE (L) + 1-3.5mm2 THHN WIRE (G) in 20mm IMC
12 SPACE 230
13 SPACE 230
14 SPACE 230
13 SPACE 230
TOTAL CONNECTED LOAD 116,380 176 165 165

It=176(1.732) Feeder: 3 sets of 3-80mm2 THHN WIRE (L) + 1-22mm2 in 50mm PVC Pipe
It= 304.832 Amps @ 80% = 243.866 Amps
Main Protection 300AT/250AF , 3P , 230V MCCB

EQUIPMENT PANEL 2 230V 3PHASE


Location: Ground Floor, EE Room Main: 300AT/400AF, 3P, 230V, MCCB
CIRCUIT VOLT PHASE CURRENT OCPD
LOAD DESCRIPTION VOLTS WIRES & CONDUIT
NO AMPERE AB BC CA 3PH POLE AT AF
1 STITCHING MACHINE 230 1650 7.5 2 60 100 2-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
2 AVR SVC 3-30KVA 230 30,000 45 3 50 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
3 CUTTER 1 230 5378 13.5 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
4 CUTTER 2 230 4701 11.8 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
5 CUTTER 3 230 7768 19.5 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
6 CUTTER 4 230 5577 14 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
7 HEIDELBERG HELICOPTER 230 2510 6.3 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
8 CHILLER 1 230 4940 12.4 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
9 CHILLER 2 230 4295 12.4 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
10 BAILING MACHINE 230 2709 6.8 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
11 MIYAKOSHI 230 108,000 166.82 3 200 250 3-80mm² THWN WIRES (L) + 22mm² THWN WIRE (G) in 50mm IMC
12 SPARE - GLUER 230 1840 5.5 3 60 100 3-8.0mm2 THHN WIRE (L) + 1-5.5mm2 THHN WIRE (G) in 32mm IMC
13 SPARE 230 1840 8 2 20
14 SPARE 230 1840 8 2 20
13
TOTAL CONNECTED LOAD 183,398.09 8 7.5 8 314

It=8(1.732)+314+0.25(166.82) Feeder: 3-175mm2 THHN WIRE (L) + 1-50mm2 in 90mm IMC 1 LOAD SCHEDULE
It= 364.061 Amps @ 80% = 295.65 Amps
Main Protection 300AT/400AF , 3P , 230V MCCB

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 7B
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
System
EXISTING PANEL @ warehouse 111 Voltage 230v
Location: EE Room Phase current
5W Down
Light
2X40W EXIT L. Volts VA AB BC CA 3PH 3PH POLE AT AF WIRES / CONDUITS
Circuit No Load Description
1 LP1 5 21 4 230 1,725 7.5 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
2 LP2 43 3 230 3,440 14.96 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
3 LP3 37 2 230 2,960 13 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
4 LP4 30 230 2,400 10.43 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
5 LP5 30 230 2,400 10.43 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
6 LP6 40 230 3,200 13.91 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
7 LP7 42 230 3,360 14.61 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
8 LP8 36 2 230 2,880 12.52 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
DUPLEX C.O EL
1 PP1 15 230 2,700 11.74 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
2 PP2 11 230 1,980 8.61 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
3 PP3 13 1 230 2,340 10.17 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
4 PP4 10 1 230 1,800 7.83 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
5 PP5 15 4 230 2,700 11.74 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
33,920.00 54.3 43.7 49.5 0.0
TOTAL CONNECTED LOAD
COMPUTATION
It= 54.3(1.732) Main: 150AT, 100AF, 3P, MCCB (Existing)
It= 94.13Amps @ 80%
It= 75.3Amps

System
EXISTING PANEL @ warehouse 109 Voltage 230v
Location: EE Room Phase current
WIRES / CONDUITS
Circuit No Load Description 2X40W Exit Light Volts VA AB BC CA 3PH 3PH POLE AT AF
1 LP9 36 1 230 2,880 12.52 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
2 LP10 45 2 230 3,600 15.65 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
3 LP11 24 1 230 1,920 8.35 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
4 LP12 20 230 1,600 6.96 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
5 FACP 230 9.4 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
6 TTC 230 9.2 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
7 LP13 29 230 2,320 10.09 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
8 LP14 44 230 3,520 15.30 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
DUPLEX E.LIGHT
9 PP6 14 3 230 3060 13.3 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
10 PP7 15 230 2700 11.7 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
11 PP8 15 2 230 3060 13.3 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
12 PP9 10 1 230 1980 8.6 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
13 PP10 10 1 230 1980 8.6 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
14 PP11 12 1 230 2340 10.2 1 2 20 100 2-3.5sqmm THHN(L)+1-3.5sqmm(THHN(G) in 15mm IMC
TOTAL CONNECTED LOAD 30,960.00 53.0 47.0 53.2
COMPUTATION Main: 150AT, 100AF, 3P, MCCB (Existing)
It= 53.2(1.732)
It= 92.14Amps @ 80%
It= 73.71Amps

1 LOAD SCHEDULE

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 7C
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.
DETAILS OF PULLBOX

300 400

300

300
MAY VARY BASED ON ACTUAL
SIZE/DIMENSION OF PANELBOARDS

WIRE GUTTER FRONT VIEW


SCALE NTS
SIDE VIEW
SCALE NTS

Line Side Line Side Line Side


2 sets of 100mm PVC PIPE Load side 3 Sets of 50mm PVC PIPE Load side 100mm IMC PIPE Load side 90mm IMC PIPE Load side

DETAILS OF GUTTER
MAY VARY BASED 3000
ON SIZE OF BREAKER

300

MAY VARY BASED ON


SIZE OF PANELBOARD

300
1 PULLBOX AND GUTTER REP

PROJECT TITLE: DRAWN/PREPARED/DESIGNED BY: SUBMITTED BY: APPROVED BY: SHEET NO:

A
L S E
R PHILIPPINE CHARITY SWEEPSTAKES OFFICE PROPOSED RELOCATION OF SECURITY
R

SunPlaza Building Shaw Boulevard, Mandaluyong City ENGR. RANDY PIEDAD


- G E N E

I C

PRINTING & PRODUCTION DEPARTMENT AT


ENGINEER III - GENERAL SERVICES DEPARTMENT
E S -

GSIS WAREHOUSE EE - 8
GENERAL SERVICES DIVISION PASIG CENTRAL BUSINESS PARK
CHECKED/ EVALUATED BY:
T
D

E
P
A R T M E
N
PASIG CITY DEMOSTHENES D. MAGNO JULIETA F. ASEO
OIC-DEPARTMENT MANAGER III, GENERAL SERVICES DEPARTMENT AGM FOR ADMINISTRATIVE SECTOR
GENERAL SERVICES DEPARTMENT RENIER A. LUISTRO
OIC-PROJ. MANAGER I, GENERAL SERVICES DEPT.

You might also like