Key plan

FUTURE PHASE

BMS SERVICES
NOTE:
CORP CLOUD
CONTRACTOR SHALL REFER TO LAYOUT 1800

IEC COOLING OPTIMIZATION IEC COOLING OPTIMIZATION 1450

PLANS FOR THE EXACT QUANTITIES OF


8100

SYSTEM SERVER A SYSTEM SERVER B


CO-AGG A CO-AGG B
PHASE 1 PHASE 1

DATAHALL - PHASE 1 DATA HALL 1 CUSTOMER OFFICE & DATA HALL CORRIDOR 1 - PHASE 1 DATA HALL 1 CUSTOMER OFFICE & DATA HALL CORRIDOR 1 - PHASE 1 DATAHALL - PHASE 1
SENSORS AND EQUIPMENT
FIREWALL A FIREWALL B 0 10 20 30 40 50
FRESH AIR FANS ... FRESH AIR FANS FRESH AIR FANS ... FRESH AIR FANS
mm NORTH
TT/RH ... TT/RH T ... T BMS SERVER A BMS SERVER B T ... T TT/RH ... TT/RH

DEFINITIONS:
TT/RH ... TT/RH TT/RH ... TT/RH
HEAD END SWITCH A HEAD END SWITCH B
· “CONTRACTOR” MEANS THE PERSON(S) NAMED AS
DPS ... DPS DPS ... DPS CONTRACTOR IN THE LETTER OF TENDER ACCEPTED BY THE
HEAD END FIBER HEAD END FIBER EMPLOYER AND THE LEGAL SUCCESSORS IN TITLE OF SUCH
PRESSURISATION FANS ...... MV FANS PATCH PNL-1 PATCH PNL-2 MV FANS ...... PRESSURISATION FANS PERSON(S).

· “EMPLOYER” MEANS THE PERSON NAMED AS THE EMPLOYER


I/O DX-SPLIT UNITS ... DX-SPLIT UNITS DX-SPLIT UNITS ... DX-SPLIT UNITS I/O
IN THE CONTRACT DATA AND THE LEGAL SUCCESSORS IN
TITLE TO THIS PERSON.
NETWORK NETWORK NETWORK NETWORK
SWITCH SWITCH SWITCH SWITCH
· “EMPLOYER’S PERSONNEL” MEANS THE ENGINEER, THE
AREA AREA ENGINEER’S REPRESENTATIVE (IF APPOINTED), THE
CONTROLLER CONTROLLER ASSISTANTS DESCRIBED IN SUB-CLAUSE 3.4 [DELEGATION BY
THE ENGINEER] AND ALL OTHER STAFF, LABOUR AND OTHER
MCP/A/101 MCP/A/102 EMPLOYEES OF THE ENGINEER AND OF THE EMPLOYER
PANEL LOCATED IN PANEL LOCATED IN
DATAHALL 1 CORRIDOR (LEFT) DATAHALL 1 CORRIDOR (RIGHT) ENGAGED IN FULFILLING THE EMPLOYER’S OBLIGATIONS
UNDER THE CONTRACT; AND ANY OTHER PERSONNEL
IDENTIFIED AS EMPLOYER’S PERSONNEL, BY A NOTICE FROM
THE EMPLOYER OR THE ENGINEER TO THE CONTRACTOR.
WS
· “ENGINEER” MEANS THE PERSON NAMED IN THE CONTRACT
DATA APPOINTED BY THE EMPLOYER TO ACT AS THE
ENGINEER FOR THE PURPOSES OF THE CONTRACT, OR ANY
PHASE 1 PHASE 1 REPLACEMENT APPOINTED UNDER SUB-CLAUSE 3.6
[REPLACEMENT OF THE ENGINEER].
DATAHALL - PHASE 2 DATA HALL 2 CUSTOMER OFFICE (PHASE 2) & DATA HALL 2 CORRIDORS - (PHASE 1) DATA HALL 2 CUSTOMER OFFICE (PHASE 2) & DATA HALL 2 CORRIDORS - (PHASE 1) DATAHALL - PHASE 2

· “KEY PERSONNEL” MEANS THE POSITIONS (IF ANY) OF THE


CONTRACTOR’S PERSONNEL, OTHER THAN THE
FRESH AIR FANS ... FRESH AIR FANS FRESH AIR FANS ... FRESH AIR FANS
CONTRACTOR’S REPRESENTATIVE, THAT ARE STATED IN THE
SPECIFICATION.
TT/RH ... TT/RH T ... T T ... T TT/RH ... TT/RH
· “SUBCONTRACTOR” MEANS ANY PERSON NAMED IN THE
TT/RH ... TT/RH TT/RH ... TT/RH CONTRACT AS A SUBCONTRACTOR, OR ANY PERSON
APPOINTED BY THE CONTRACTOR AS A SUBCONTRACTOR OR
DPS ... DPS DPS ... DPS DESIGNER, FOR A PART OF THE WORKS; AND THE LEGAL
SUCCESSORS IN TITLE TO EACH OF THESE PERSONS.
PRESSURISATION FANS ...... MV FANS MV FANS ...... PRESSURISATION FANS
· “EMPLOYER-SUPPLIED MATERIALS” MEANS THE MATERIALS (IF
ANY) TO BE SUPPLIED BY THE EMPLOYER TO THE
I/O DX-SPLIT UNITS ... DX-SPLIT UNITS DX-SPLIT UNITS ... DX-SPLIT UNITS I/O CONTRACTOR UNDER SUB-CLAUSE 2.6 [EMPLOYER-SUPPLIED
MATERIALS AND EMPLOYER’S EQUIPMENT]
NETWORK NETWORK NETWORK NETWORK
SWITCH SWITCH SWITCH SWITCH

AREA AREA
CONTROLLER CONTROLLER

MCP/A/201 MCP/B/202
PANEL LOCATED IN PANEL LOCATED IN
DATAHALL 1 CORRIDOR (LEFT) DATAHALL 1 CORRIDOR (RIGHT)

OUTDOOR AREA

WS

PHASE 3 PHASE 3

DATAHALL - PHASE 3 DATA HALL 3 CUSTOMER OFFICE & DATA HALL CORRIDOR 3 - PHASE 3 DATA HALL 3 CUSTOMER OFFICE & DATA HALL CORRIDOR 3 - PHASE 3 DATAHALL - PHASE 3

FRESH AIR FANS ... FRESH AIR FANS FRESH AIR FANS ... FRESH AIR FANS

TT/RH ... TT/RH T ... T T ... T TT/RH ... TT/RH

TT/RH ... TT/RH TT/RH ... TT/RH

DPS ... DPS DPS ... DPS

PRESSURISATION FANS ...... MV FANS MV FANS ...... PRESSURISATION FANS

I/O DX-SPLIT UNITS ... DX-SPLIT UNITS DX-SPLIT UNITS ... DX-SPLIT UNITS I/O

NETWORK NETWORK NETWORK NETWORK


SWITCH SWITCH SWITCH SWITCH

AREA AREA
CONTROLLER CONTROLLER

MCP/A/301 MCP/B/302
PANEL LOCATED IN PANEL LOCATED IN
DATAHALL 1 CORRIDOR (LEFT) DATAHALL 1 CORRIDOR (RIGHT)

PHASE 4 PHASE 4

DATAHALL - PHASE 4 DATA HALL 3 CUSTOMER OFFICE (PHASE 3) & DATA HALL 4 CORRIDORS - (PHASE 3) DATA HALL 3 CUSTOMER OFFICE (PHASE 3) & DATA HALL 4 CORRIDORS - (PHASE 3) DATAHALL - PHASE 4

FRESH AIR FANS ... FRESH AIR FANS FRESH AIR FANS ... FRESH AIR FANS

TT/RH ... TT/RH T ... T T ... T TT/RH ... TT/RH

TT/RH ... TT/RH TT/RH ... TT/RH

DPS ... DPS DPS ... DPS

PRESSURISATION FANS ...... MV FANS MV FANS ...... PRESSURISATION FANS

I/O DX-SPLIT UNITS ... DX-SPLIT UNITS DX-SPLIT UNITS ... DX-SPLIT UNITS I/O

NETWORK NETWORK NETWORK NETWORK CS01 16/12/2022 ISSUED FOR CONSTRUCTION


SWITCH SWITCH SWITCH SWITCH
Rev Date Description
AREA AREA Client
CONTROLLER CONTROLLER

MCP/A/401 MCP/B/402
PANEL LOCATED IN PANEL LOCATED IN
DATAHALL 1 CORRIDOR (LEFT) DATAHALL 1 CORRIDOR (RIGHT)

PHASE 1 PHASE 1 Project Manager / QS Consultant


ADMIN BLOCK ADMIN BLOCK

FRESH AIR FANS FRESH AIR FANS

T T PT. TURNER & TOWNSEND


VAV VAV VAV VAV International Financial Centre, 26F
DPS DPS DPS DPS Jl. Jend. Sudirman Kav 22-23, Jakarta Selatan 12920
PHASE 3 PHASE 3 Tel: +62 21 252 3895
TT/RH TT/RH www.turnerandtownsend.com
PAHUS PAHUS Architect

MV FANS MV FANS
DX-SPLIT UNITS DX-SPLIT UNITS AWP PTE LTD
I/O I/O
143 CECIL STREET, #12-00 GB BUILDING
SINGAPORE 069542
NETWORK NETWORK Tel: + 65 63376777, Fax:+ 65 63396956
SWITCH SWITCH
www.awparchitects.com
AREA AREA Proj. email: awp220911c@awparchitects.com
CONTROLLER CONTROLLER

MCP/A/501 MCP/B/502 M&E Consultant


PANEL LOCATED IN PANEL LOCATED IN
M&E CORRIDOR M&E CORRIDOR

DSCO GROUP PTE LTD


3 HarbourFront Place, #04-02 HarbourFront Tower 2
Singapore 099254
PHASE 1 PHASE 1 Tel: +65 6216 0022, Fax: +65 6216 0020
www.dscogroup.com , Proj email: p1239.address@dsco.com.sg
C&S Consultant
WATER TREATMENT SYSTEM WATER TREATMENT SYSTEM

RO SYSTEM RO SYSTEM

TRANSFER WATER TANK SYSTEM TRANSFER WATER TANK SYSTEM

I/O MAKE UP WATER PUMP SYSTEM I/O MAKE UP WATER PUMP SYSTEM
Grha Tirtadi 3/F, Jalan Raden Saleh No. 20 Jakarta 10430 - Indonesia
AREA AREA (62-21) 392 9911 Fax : (62-21) 392 5995 Email : indo@meinhardt.co.id
CONTROLLER CONTROLLER
Security Consultant
NETWORK NETWORK
SWITCH SWITCH

MCP/A/601 MCP/B/602
PANEL LOCATED IN PANEL LOCATED IN
JKT1/WTR/L0/01 JKT1/WTR/L0/03

AIP RISK CONSULTING PTE LTD


201 Joo Chiat Road #03-01Singapore 427472
Tel: 65 6443 0735 Fax: 65 6443 0732
E: consult@aipriskconsulting.com W:www.aipriskconsulting.com
NOTE: NOTE:
TO REFER TO THE SCHEMATIC AND LAYOUTS FOR THE EXACT TO REFER TO THE SCHEMATIC AND LAYOUTS FOR THE EXACT Project
QUANTITIES OF MEP EQUIPMENT AND ACCESSORIES QUANTITIES OF MEP EQUIPMENT AND ACCESSORIES

PHASE 1 MCP/X/04 PHASE 1 MCP/X/03 PHASE 1 MCP/X/02 PHASE 1 MCP/X/01


K2 JKT 1 DC
Drawing Status

I/O FRESH & EXHAUST FANS I/O I/O I/O


ISSUED FOR CONSTRUCTION
AREA AREA DX SPLIT UNITS AREA
BIO SEPTIC TANK SYSTEM FIRE PUMP CONTROL PANEL AREA
CONTROLLER CONTROLLER CONTROLLER CONTROLLER
EJECTOR SYSTEM FRESH & EXHAUST FANS FRESH & EXHAUST FANS Title
NETWORK NETWORK NETWORK
SWITCH SWITCH SWITCH
NETWORK JKT1 GIIC CAMPUS
SWITCH

DDC DDC DDC DDC MECHANICAL BMS SCHEMATIC


PANEL LOCATED IN PANEL LOCATED IN GUARD PANEL LOCATED IN PANEL LOCATED DATA DOMESTIC WATER SYSTEM
HYDRANT PUMP ROOM HOUSE HYDRANT PUMP ROOM HALL CORRIDOR 1 (RIGHT) CONTROL PANEL
Drawn Checked Rev
DOMESTIC WATER PLANT ROOM TYS YY
Scale Status CS01
WASTE WATER SYSTEM GUARD HOUSE HYDRANT PUMP ROOM
N.T.S ISSUED FOR CONSTRUCTION
Dwg No.
NOTE:
TO REFER TO THE SCHEMATIC AND LAYOUTS FOR THE EXACT
QUANTITIES OF MEP EQUIPMENT AND ACCESSORIES JKT1-DRG-CTR-3-ZZ-ZZ-2503