MVHI03: Engine Daily Maintenance Report

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

MV HI 03

Engine Daily Maintenance Report


Date: 24 May 2021 Location : ACHORAGE ( EOPL at Singapore )

TAKE OFF NUT CYL.HEAD NO.2 REMOVED CYL.HEAD NO.2

REMOVED CYL.HEAD NO.2 CHECKED FACE PISTON AND RING PISTON

RING PISTON CONDITION BROKEN TAKE OUT PISTON AND PISTON ROD
MV HI 03
Engine Daily Maintenance Report

CONDITIN V/V BEFORE CLEAN CLEANED/BRUSHED CYL.HEAD

CHECKED CON DITION EXH. V/V CLEANNED SURFACE CYL HEAD BY BRUSH

RING PISTON CONDITION BROKEN TO PIECES CLEAREANCE CYL LINER NO.2


MV HI 03
Engine Daily Maintenance Report

IN POSITION DIAL FOR CLEARANCE CYL LINER RENEWED O’RING CONECTION J.C.W

ASSEMBLED PISTON RING AND PISTON ASSEMBLED PISTON AND CONECTING ROD SPARE

RENEWED GASKET CYL.HEAD ASSEMBLED CYL.HEAD


MV HI 03
Engine Daily Maintenance Report

CHECKED CONDITION RING PISTON CYL.NO.1 CHECKED CONDITION RING PISTON CYL.NO.2

CHECKED CONDITION RING PISTON CYL.NO.3 CHECKED CONDITION RING PISTON CYL.NO.4

CHECKED CONDITION RING PISTON CYL.NO.5 CHECKED CONDITION RING PISTON CYL.NO.6

You might also like