RENCANA ANGGARAN BIAYA

Pekerjaan Strauss Pile


Bukit Cilegon Asri

No. Pekerjaan Vol Sat Harga Satuan Total


(Rp.) (Rp.)

I Strauss Pile diameter 30 cm 1.43


Semen 50 kg 4.99 zak 60,000 299,697
Pasir 0.97 m3 155,000 150,420
Split 1.48 m3 200,000 296,843
Besi D12 2.38 btg 90,950 216,764
Besi D6 2.68 btg 28,000 74,928
Kawat Beton 3.28 kg 20,000 65,648

II Bor Tanah 1.00 titik 600,000 600,000

TOTAL 1,704,300
Untuk 27 Buah 46,016,100