Gad at CH 2+300 (7X9.0)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

CONSULTANT :- CLIENT :- ROAD NAME :- DRAWING TITLE :-

REVISION :- R-00 DRAWING NO :- PMGSY/GAD/ 01


Executive Engineer ODR 58 TO MALSUR TO RAJURA ANSING GENERAL ARRANGEMENT DRAWING
ROAD - BRIDGE CH 2300 OF MINOR BRIDGE OF SHEET :- (01 OF 02) SCALE :- NTS DATE :-
PMGSY, MRRDA SPAN 7x9.0 Mtr.
Deputy Engineer Executive Engineer
Division Washim PMGSY, MRRDA DIVISION
Washim
PMGSY, MRRDA DIVISION
Washim
DRAWN BY :- DESIGN BY: - APPROVED BY :-
Avg. GL
0.00

-0.50

-1.00

-1.50

1
10

1
3
6

CONSULTANT :- CLIENT :- ROAD NAME :- DRAWING TITLE :-


REVISION :- R-00 DRAWING NO :- PMGSY/GAD/ 02
Executive Engineer ODR 58 TO MALSUR TO RAJURA ANSING GENERAL ARRANGEMENT DRAWING
ROAD - BRIDGE CH 2300 OF MINOR BRIDGE OF SHEET :- (02 OF 02) SCALE :- NTS DATE :-
PMGSY, MRRDA SPAN 7x8.0 Mtr.
Deputy Engineer Executive Engineer
Division Washim PMGSY, MRRDA DIVISION
Washim
PMGSY, MRRDA DIVISION
Washim
DRAWN BY :- DESIGN BY: - APPROVED BY :-
P1
℄ OF EXP. GAP F.R.L.
20 mm RL:
EXP. GAP
RCC SOILD SLAB RCC SOILD SLAB

FOUND. LVL
RL:

1
3

CONSULTANT :- CLIENT :- ROAD NAME :- DRAWING TITLE :-


REVISION :- R-00 DRAWING NO :- PMGSY/GAD/ 02
Executive Engineer ODR 58 TO MALSUR TO RAJURA ANSING GENERAL ARRANGEMENT DRAWING
ROAD - BRIDGE CH 2300 OF MINOR BRIDGE OF SHEET :- (02 OF 02) SCALE :- NTS DATE :-
PMGSY, MRRDA SPAN 7x8.0 Mtr.
Deputy Engineer Executive Engineer
Division Washim PMGSY, MRRDA DIVISION
Washim
PMGSY, MRRDA DIVISION
Washim
DRAWN BY :- DESIGN BY: - APPROVED BY :-

You might also like