Three Years Contingency Plan: Republic of The Philippines Province of Tarlac Municipality of Moncada
Three Years Contingency Plan: Republic of The Philippines Province of Tarlac Municipality of Moncada
Province of Tarlac
Municipality of Moncada
BARANGAY TUBECTUBANG
THREE YEARS
CONTINGENCY
PLAN
FY 2023-2025
Republic of the Philippines
Province of Tarlac
Municipality of Moncada
BARANGAY TUBECTUBANG
SANGUNIANG BARANGAY
Mission
A. COORDINATION
ALLAN B.VALENTON
II. Sanggunian BarangayResolution
Republic of the Philippines
Province of Tarlac
Municipality of Moncada
BARANGAY TUBECTUBANG
PRESENT:
ALLAN B. VALENTON Punong Barangay ____________________________________
RENATO B. GAMUROT SB Member __________________________________
MARIO AVELLANO SB Member ___________________________________-
_
WYATT B. VALENTON SB Member ____________________________________
GERARDO L. VALENTON SB Member ____________________________________
ALEJANDRO SORIANO SB Member ____________________________________
EULOGIO GAMUROT S B Member ____________________________________
LEONARDO GABAYAN JR. SB Member ____________________________________
CHRISTOFFER BARIENTOS SK Chairperson ____________________________________
BEATRIZ B. BALIOLA Barangay Treasurer ___________________________________
RAZIEL B. VALENTON Barangay Secretary ____________________________________
ABSENT:NONE
WHEREAS, flooding and occurrence of flood and typhoon are considered as the
most threatening disaster scenario in the Barangay upon conduct of risk analysis ;
WHEREAS, the Sanguniang Barangay supports the Contingency Plan for the
identified top natural hazards as it could help protects lives and ensure the
availability of resources and likewise establishes a mechanism for decision-
making based on the coordination and command protocols;
NOW THEREFORE, the Sanguniang Barangay of Tubectubang in session
assembled, upon unanimous motion;
APPROVED.
ATTESTED:
.
III. Profile of Barangay
Tubectubang
A. General Description & Characteristics of the Barangay
According to the History a Foreigner Visitor asked the man at the PNR SIT what was the
Big Tree while he was pointing with his finger, the man replied, that is TUBANG, then the
Foreigner said Too Big Tubang, the man imitated what the foreigner said and because of the
Ilocano accent of the man the Words Too Big Tubang became Tubectubang.
Location:
Adjacent Barangays:
I. PHYSICAL INFORMATION
Total Land Area (in hectares) : 476.0416
Barangay Category : Rural
Land Classification : Lowland
Barangay Location : 15.7605, 120. 5711
Economic Source : Agricultural
Number of
Position
Personnel
Barangay Lupon 10
Barangay Tanod 16
IV.COORDINATION COMMAND
AND CONTROL
A. COORDINATION
The following are the required clusters, with the corresponding lead and
member offices, that must be activated in response to the FLOODING:
CLUSTER LEAD OFFICE OFFICES INVOLED
Telecommunication BDRRMC/MDRRMO DILG/PNP/MENRO/BFP/BDRRMC/
and Warning MSWDO/DEPED/PDRRMO/ LO-
CAL RADIO/ ALL ACCREDITED
CIVIC RADIO COMMUNICATION
GROUP
Relief and Registra- MDRRMO/MBO/MHRMO/
BDRRMC/MSWDO
tion MTO/BAC/DCW/BHW
MDRRMO/MEO/MPDO/OTM/
Evacuation BDRRMC/MSWDO/DEPED
PNP/BFP/CSO/PDRRMO/NOLCOM
RHU1/RHU2/BHW/MDRRMO/
Health and Medical BDRRMC/RHU 1 & RHU2
PRC/PDRRMO
Security BDRRMC/PNP PNP/BDRRMC/CSO
MDRRMO/MEO/MPDO/OTM/PNP/
Transportation BDRRMC/MDRRMO BFP/LOCAL TRANSPORT
GROUPS/PDRRMO/NOLCOM
Search and Rescue
BDRRMC/BFP/MDRRMO BFP/MDRRMO/PNP/PDRRMO
& Retrieval
Engineering and MPDO/MBO/MTO/PNP/BFP/ BDR-
BDRRMC/MEO/MPDO
Restoration RMO/MSWDO/DPWH
The TELECOMMUNICATION AND WARNING cluster shall have the following roles
and responsibilities:
Releases advisories and alert messages corresponding to warning informa-
tion on Impending threats to local DRRMO, BDRRMO and other agencies
entities concerned;
PROTOCOLS:
ACTIVITIES/ARRANGE- RESPONSI-
TIME-
NEEDS MENTS TO MEET THE BLE OF-
FRAME
NEED FICES
Organization of Teams
Human Re-
Equipage BDRRMO D-0
source
Mobilization and Deployment
Radio Commu- Request for purchase of addi-
nications tional communications equip- BDRRMO
Equipment ment
RESOURCE INVENTORY:
RESOURCE
RESOURCES UNIT QTY OFFICE/AGENCY REMARKS
LOCATION
Human
persons 23 BDRRMO LGU -do-
Resource
BPATS set 10 BDRRMO BRGY. -do-
Handheld
Radio HALL
CLUSTER
LEADERS
set 23 BDRRMO -do- -do-
Mobile
Radio
Computer
with set 2 BDRRMO -do- -do-
Internet
Vehicles unit 3 BDRRMO -do- -do-
Megaphone unit 2 BDRRMO -do- -do-
Members: BDRRMO/DCW/BHW
The RELIEF AND REGISTRATION cluster shall have the following roles and
responsibilities
The following are the needs of the Relief and Registration for the corresponding
activities required:
ACTIVITIES/ AR-
RESPONSIBLE
NEEDS RANGEMENTS TO TIMEFRAME
OFFICES
MEET THE NEEDS
Organization of
Teams
Human Re-
Equipage BDRRMO D-0
source
Mobilization and De-
ployment
EVACUATION CLUSTER
Members: BDRRMO
The EVACUATION cluster shall have the following roles and responsibilities
1. Upon activation of the contingency plan, all key representatives of the RE-
LIEF AND REGISTRATION headed by the : BDRRMO shall undertake effective
collaboration and establish proper coordination cater and provide the essential
needs of the evacuees and maintain a healthy and conducive/gender sensitive
evacuation centers.
The following are the needs of the EVACUATION cluster as well as the corre-
sponding activities required:
ACTIVITIES/ AR-
RANGEMENTS RESPONSIBLE
NEEDS TIMEFRAME
TO MEET THE OFFICES
NEEDS
Organization of
Teams (Teachers,
Social Workers,
Emergency Medical BDRRMC/
Human Resource D-1
Technician, Brgy. MSWDO
Officials) for Mobi-
lization and Deploy-
ment
Food, Water,
BDRRMC/
Blankets, Ma- Repacking of Goods D-2
MSWDO
tress, Etc.
Gender Sensitive
and Permanent Construction of Per-
Evacuation Cen- manent Evacuation BDRRMC/LGU D-2years
ter in the Center
Barangay
Members: RHU1/RHU2/BHW/BDRRMO
To provide and preserve life through proper medical assistance and adequate
provision of medical facilities.
The HEALTH AND MEDICAL cluster shall have the following roles and
responsibilities
The following are the needs of the HEALTH AND MEDICAL cluster as well as
the corresponding activities required:
SECURITY CLUSTER
Lead: BPOC
Members: BPOC/BDRRMC
The SECURITY cluster shall have the following roles and responsibilities
ACTIVITIES/ AR-
RESPONSIBLE OF-
NEEDS RANGEMENTS TO TIMEFRAME
FICES
MEET THE NEEDS
Organization of
Teams (Brgy. Bantay
Punong Barangay/
Human Resource Bayan, CSO) for Mo- D-1
BPOC
bilization and De-
ployment
TRANSPORTATION CLUSTER
Lead: BDRRMO
Members: BDRRMO/BPOC
The TRANSPORTATION cluster shall have the following roles and responsibilities
The following are the needs of the Transportation cluster as well as the corresponding activities
required:
ACTIVITIES/ ARRANGE-
RESPONSIBLE
NEEDS MENTS TO MEET THE TIMEFRAME
OFFICES
NEEDS
Organization of Teams (ve-
hicle/heavy equipment oper-
Human Resource BDRRMO D-1
ator) for Mobilization and
Deployment
Lead: BDRRMO/BPOC
Members: BDRRMO/BPOC
The SEARCH AND RETRIEVAL cluster shall have the following roles and
responsibilities
After the search and rescue operation, retrieval operation will com-
mence.
The following are the needs of the Transportation cluster as well as the corre-
sponding activities required:
ACTIVITIES/ AR-
RESPONSIBLE
NEEDS RANGEMENTS TO TIMEFRAME
OFFICES
MEET THE NEEDS
Organization of Teams
Human Re-
for Mobilization and BDRRMO/BPOC D-1
source
Deployment