11 MONTHLY INVOICE
Contractor : ADHI-MINARTA-BARATA JO
Date : October 2, 2022
Place : Central RIMP Jatibarang Office
Attendance : DS & QS Engineer of the Consultant, SAM Engineer of the Contractor
1. General
A check of the supporting data for the No. 12 monthly invoice of (Adhi Minarta Barata JO),
the Contractor for the Package LMS 01, was made on (October)/ (11)/ (2022) at the RIMP
Consultant Office in Jatibarang. In this checking, the following matters were confirmed:
1) Because the supporting data for the No. 12 invoice is still incomplete as summarized in
the following table, the Contractor shall complete such data before a process of the next
invoice;
2) Before a completion of the supporting data of No. 12 invoice, the next invoice will be
not processed;
3) In case the Contractor could not prepare the supporting data of No. 12 invoice, a
deduction of such payment will be made in the next invoice for the pay item of which
supporting data is incomplete; and
4) The Contractor is requested to compile all the supporting data for every invoice and its
copy shall be distributed to the Sub-project and the Consultant.
-1-
5 2 - I - 2 - 11 Reinforcement steel bar, deformed
bar
9 3 - I - 1 - 6a Excavation type - B
12 3 - I - 1 - 13 Earthfill type - B
-2-
ctc 150 mm)
23 3 - I - 2 - 14 Installation of pre-cast concrete
block, 1.0m x 1.0m x 0.07m
35 3 - II - 1 - 7a Excavation type - C
-3-
37 3 - II - 2 - 7 Concrete type - D1 (Batching plant)
43 3 - II - 3 - 5a Riprap protection
-4-
54 3 - II - 5 - 11 Furnishing and installation of PVC
waterstop at contraction joints,
width = 200 mm
55 3 - II - 5 - 14 Furnishing and installation of dowel
bars at expansion joints, dia. 19
mm, L = 1.0 m, including PVC pipe
dia. 25 mm, L = 0.5 m
56 3 - II - 5 - 15a Furnishing and installation of dowel
bars at contraction joints, dia. 19
mm, L = 1.0 m, including PVC pipe
dia. 25 mm, L = 0.5 m
57 3 - II - 5 - 21a Furnishing and installation of flap
valve, dia. 100 mm, for under drain
-5-
600 mm
67 3 - III - 1 -2 -9 Furnishing precast concrete U
flume type III-1; B = 600 mm; H =
600 mm
68 3 - III - 1 -2 - Furnishing precast concrete U
10 flume type III-2; B = 600 mm; H =
700 mm
69 3 - III - 1 -2 - Furnishing precast concrete U
11 flume type IV-1; B = 800 mm; H =
700 mm
70 3 - III - 1 -2 - Furnishing precast concrete U
12 flume type IV-2; B = 800 mm; H =
800 mm
71 4-I-1-1 Floodway gate type 1; type radial
gate (BxH : 10.0 m x 4.925 m)
(Rubber Seal Gate, Bolt & Nut)
72 4-I-1-3 Floodway gate hoist: Hoist for type
radial gate(Wire Rope, Limit Switch,
Gate Position Indicator)
73 4-I-1-4 Floodway gate: Foot bridges ans
shelters
-6-
82 4 - III - 1 - 6 Guide frames with dogging device
(new)