Professional Documents
Culture Documents
Arc Dwgs
Arc Dwgs
www.edmac.ae
Tel: +971 4 256 6993
952,534 SQ. M.
Email: Maildesk@edmac.ae
Fax: +971 4 256 6994
Dubai, UAE
ENGINEERING CONSULTANT
112.50 SQ. M.
A
PRIVATE LAND
952,534 SQ. M.
A R E A S T A T E M E N T ( IN SQ. M. )
_____
_____
-----
1D
A
AL TAWAIN
GROUND WATER TANK
DRAWN BY:
BLOCK :
CONSULTANT
DATE
N
N
Email: fujairah@edmac.ae
Email: info@edmac.ae
Fax: +971 9 222 3340
Tel: +971 9 222 3344
1D
W
COMPOUND WALL HEIGHT :
HEIGHT PROPOSED :
PLOT NO. / CODE:
PLOT NO./CODE :
DESIGN BY:
PROJ. NO. :
LOCATION :
CONTENT
SHEET
PROJECT:
BLOCK :
CLIENT:
(ETISALAT & ELECTRIC)
7 - PREPARE KITCHEN
5 - SERVICE ROOM
6 - MAIN KITCHEN
11 - GAME ROOM
12 - MAIN VILLA
3 - GUN ROOM
13 - STUDIO
8 - MAJILIS
LEGENDS
E
PUMP ROOM
UR
+450mm
UT
EF
TH
IN
AD
RO
E
RAG
2
D STO
28m
29.
COL
RE
T STO
m 2
135
HEA
T FAN
6.3
13.850
EXHAUS E
14.410 N 929.0940
1116.8020
13.703 ELEV=
5.6 14.120 5.6
14.256
12.1900
T FAN 14.455
13.595
14.747 3.2
14.532 13.5001
EXHAUS 3.3
14.585
15.796 3.348
CK 5.2 4.6
3.1
4.4
11.728
11.815
11.561
11.568
4.8
4.8
11.578
12
11.334
11.423
11.185
4.7
3.2 6.7
14
11.186
11.186
11.322 11.185
9.3 3.3
11.181
11.173
11.173
11.179
11.176
11.173
11.163
3.1
11.170
11.140 MAIN 4.4026 0.7000
MAIN
TENT VILLA
11.160
11.168
11.156
50X250
TUBE
BOX
CAR
0.27 11.124
12.501
PARK
09
10.403 3.3018
11.163
11.131
10.278
17.4988 ING
11.134
10.405
12.502 3.2988
SHAD
10.270 50X250
1.5
10.408 3.3 TUBE
E
4.0
BOX
16.24 10.267
3.3010
+ 12. 10.425
3.0
3.30
02
+10.2 3
10.407
+10.6
50X250
3
TUBE
BOX
SS
T TENT
3.2998
E=913.332
N=1069.33
L 11.640
33.9647
N
E
998.0640
ELEV=1127.7230
0 11.7650
0.4000
GUES
10.282
50X250
TUBE
BOX
1.3999
3.1
11.654 11.688
0.6000 0.6000
3.4998
2.4 10.239
10.283
Lam
11.705 12.0 p
4 post
N=1100.973
E=966.302
3.3 10.241
11.692
IL
E=966.323+10.53 2.7
N=1100.754
10.246
inte
IL
+9.55
IL
+9.49
4" rloc
SLE IL
+9.59
k road
EVE
13
16.55 IL +9.54
13.95
13.95
76.01+
72.01+
10
+ 18.7 10.275
5 11.640 11.9
SSL 4
4
ST
T TENT
09
UD
10.277 3.1
+ 12.
IO
2.4
11.631
+ 12.
GUES
2
L SS
TENT
12.039
3.0 L
VIP
10.378
0.3
12.033
3.1
17.0 10.379
922
17.0 17.0
678
IL
+9.48
922 IL +9.28
3.1
5.0
E=1006.710
N=1096.490
12.1
16.7 E=1006.775
N=1096.184
IL
+10.65
2
080
IL +9.24
IL +9.50 10.05
15.8
09
13
88.1791
10.349
3.1
12.1
5.0 3.1
12.011 0
2
15.7 3.0
13.4
TENT
94 83 10.349
5.0
+ 12.
10
VIP
12.9
02 12.008
1
12.82
12.8 38 + 12.
T TENT
2
5.0
SS
13.4 L 40
74
SS
GUES
0.4
L
12.9 3.2
79 11.6
05 Manhole
10.00
44.
41
+11.625
Manhole
+11.6250
+10.3790
10.00
interlock road
+ 10.3800
IL
+9.37
IL
IL +9.04 +9.49
+ 10.380
IL
+9.10
09
+ 11.6240
E=1010.338
N=1070.303
IL
E=1010.340 +10.30
11.1
+ 12. +
11.6210
+ 10.380
N=1070.154
9
+
02 10.3800
09
2
SS
T TENT
L
5
T TENT
GUES
Manhole
0.6
GUES
0.24 1.7
+ 12. Lam
4" 02 post p
10.6
SLE Manhole
10.08 +10.3990+10.3970
SS
EVE 5
10.65
13.5
Manhole
18.8
E=975.364
N=1033.360
+10.3980
+10.3990
+11.617 L 10.65
11.0 1.7
N=1033.179
E=975.379 IL
+10.48
Manhole
+ 11.6130
11.838
W1
11.830
11
+10.3960
0.6 RAMP
3.0
+ 10.3930
0.5
10.93 D1
1.7
KITCHE
Bat
2.0 +10.4020
7.7
IL
+9.52 IL
+ 11.6130 STL-1
N CORRID 0.7
IL
IL
+8.94
+9.33
11.9 12.5 +8.89
+11.613
10.825
W3 0.7 2.6
W2 10.859
OR
00 0.4
10.877
h
1.7
0.7
D1 10.797
Big
1.9
VE 10.826
T TENT
10.88 2.4
10.889
09
W5
6.0
GUES
+ 12.
STORE
Manhole
Stone
4.8 passageway
ELEV=
N
E
937.0600
990.8870 PT 11.699
02
11.8080
12 M14
SS
10.423
11.5 1.5
L Big
0.8
Stone
3.2
94 11.543
10.874
12.5
inte 10.425
TRANSFORMER
1.0
2.0
69
Lamp
KITCHENG
rloc
06 W1
D2
10.81
EXISTIN
AL-D
10.875
6
2.0
post
k roa
W1
3.8 W1
d 10.647 02
AL-D
Big
2.0
W1 Stone
4.2
06 W1
AL-D
SLOPE 10.90
5.30
SLOPE
INTERLOCK 10.77 01
9 AL-D
12.0 R1.9963
1
4.6
W1
4 2.4
W1
10.3
SLOPE
66
04
2.15
±00.00
PROPOSED
W1
10.0
0.9939
P W1
9.50
03
RAM
SLOPE
LE
+00.00 W1
9.73
interlock road
10.7 W1
ya ston
e
30
NG
3.0
W1
9.73
w pass
1.0401
10.60 2.8
W1 3
kla
age
way E=953
3.0
TH W1
1mTABLE
N=980 A
- 40
x 2m
.480
w
W1
.401
05
gn A 01
AL-D
its B 12.4
m W4 W1
06
AL-D
9.24
1
Lam
pos p
t
ixE
02
2 0
10.6 AL-D
10.6 W1
9.03
3.0
10.6
INTERLOCK W4 W1
+0.000
ROOM
LEVEL
ROOF
STL-1 W4
HEIGHT W1
TOP
B
+3.80LEVEL
W1
STL-1 06
11.2 W4
AL-D
8.659
EXISTING
11.2 6 ELECTRI
ROOM
7 CAL
01
1 0-LA
DAL-D
AL-D
STL-1
4" SLEE
Lam
Lam 8.76pos p
VE STL-1
post p 8.52 t
2.5 10.8 10.88 8.34
4 3.0
11.9 4"
STL-1
8.52
SLE
stone passageway 8.34 EVE
10.8 2.8
2 STL-1
0 10.6
.5x
1.2
1.0 3.0
0 8.828
10.5 A
9 12.5
Lam
B
post p
A
7x3 xH
8.14
interlock road
B
STL-1 8.30
0.17
10.4
10.4
1.0
3.0 0.43
22
RO 4" SLEE road STL-1
8.11
LxW AD
WID
TH
10m
VE
LE
N
PROPOSED
WALKING
PATH
10.1
10.1
88
9.86 STL-1 668
8..99
inter
lock 8.15
GT
H -1
10.1
1 8m 10.0
10.00
0
1.0
flow
Water
Geocell
.3
.3
.3
1.0
4"
1.0 SLE
EVE
g road
01
Ladies accomm
4"
SLE
Ladies accomm
EVE
0.36
8
Existin
02
0.09
7
-0.12
6
odation
odation
-0.32 1.0
5
4"
SLE
STL-1
EVE
-0.52
7 10.0
1.0
cu
7.4458
lver
7.4606 t
STL-1
RAIN
1.0
Existing road
WATE
Ladies accommodation
7.3849
R FLOW
7x3.5x2.5
7.2872
LxWxH
7.3653
d
ng roa
MH
Existi
STL-1
7.3127
Ca Existing road
MH
m
er
a Existing road
N=2829645.733
E=575793.705
N=2829659.806
E=575793.167
cu
lver
N=2829653.012
E=575800.649
cro
ss
ing
t
pip
e
E72
MH
Ro
om
MH
84
57.44
MILKIYA NO. :
A B C PLOT NO. / CODE: 1D
A B C D BLOCK : A
LOCATION : AL TAWAIN
AREA OF PLOT : 952,534 SQ. M.
LAND USE TO ALLOTTED : PRIVATE LAND
1 HEIGHT PERMITTED : -
PLOT COVERAGE AREA : _____
1 TOTAL BUILT-UP AREA : _____
HEIGHT PROPOSED : -----
COMPOUND WALL HEIGHT :
PUMP ROOM
A R E A S T A T E M E N T ( IN SQ. M. )
+450mm TOTAL PLOT AREA 952,534 SQ. M.
2 2 PROPOSED PUMP ROOM 112.50 SQ. M.
03 FLOOR PLAN
3 SCALE: 1:100 MTS
A-201
A B C
RAMP UP
WALK WAY
+00.00mm
PUMP ROOM
01 FLOOR PLAN THE FOUNDATION IS DESIGN FOR GROUND PUMP ROOM AND UNDER
GROUND WATER TANK
A-201 SCALE: 1:100 MTS
N
N
A B C D U/G WATER TANK
04 SECTION Z-Z
E
A-201 SCALE: 1:100 MTS
2 DECK
ENGINEERING CONSULTANT
P.O. Box: 2400 P.O. Box: 14330
Fujairah, UAE Dubai, UAE
Tel: +971 9 222 3344 Tel: +971 4 256 6993
Fax: +971 9 222 3340 Fax: +971 4 256 6994
Email: fujairah@edmac.ae Email: Maildesk@edmac.ae
3 Email: info@edmac.ae www.edmac.ae
CLIENT:
RAIBAL HOLDING LLC
PROJECT:
A R E A S T A T E M E N T ( IN SQ. M. )
TOTAL PLOT AREA 952,534 SQ. M.
PROPOSED PUMP ROOM 112.50 SQ. M.
D C B A 3 2 1
N
E
A B C D 1 2 3
ENGINEERING CONSULTANT
P.O. Box: 2400 P.O. Box: 14330
Fujairah, UAE Dubai, UAE
Tel: +971 9 222 3344 Tel: +971 4 256 6993
Fax: +971 9 222 3340 Fax: +971 4 256 6994
Email: fujairah@edmac.ae Email: Maildesk@edmac.ae
PROJECT: