Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Assignment-1

Last date of Submission- 7th March

SET-A (Even UIDs)

1. When do we prepare RTM (Requirement traceability matrix), is it before test case designing or
after test case designing?
2. In practice, which Life Cycle model may have more, fewer or different levels of development and
testing, depending on the project and the software product. For example, there may be
component integration testing after component testing, and system integration testing after
system testing
3. Compare software errors, software faults and software failures
4. Write four test cases to test sign-in form of gmail account.
5. When should testing be stopped?

SET-B (odd UIDs)

1. Explain V model with diagram.


2. What is test plan? Write its two advantage
3. Prepare six test cases for home page of marketing site www.flipkart.com.
4. Define software metrics. Describe product Vs process & objective Vs subjective metrics
5. How to prepare test plan?

You might also like