Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FOUNDATION DATA VOLTAGE 20 kV TOWER TYPE DCA - 150

MATERIAL SPECIFICATION

Height of Soil Bearing Foundation Concre


Excavation
tower Capacity dimensions te
H (m) Σz (daN/cm2) t (m) A (m) A (m) m3 m3
1.00 2.40 2.10 2.10 10.60 11.65
8,00 2.00 2.00 1.70 1.70 5.80 6.50
3.00 – 5.00 1.80 1.55 1.55 4.30 7.90
1.00 2.40 2.25 2.25 12.15 13.40
10,00 2.00 2.00 1.85 1.85 6.85 7.70
3.00 – 5.00 1.80 1.70 1.70 5.20 5.90
1.00 2.40 2.45 2.45 14.40 15.90
12,00 2.00 2.00 2.05 2.05 8.40 9.45
3.00 – 5.00 1.80 1.90 1.90 6.50 7.40
1.00 2.40 2.60 2.60 16.20 17.90
14,00 2.00 2.00 2.20 2.20 9.65 10.90
3.00 – 5.00 1.80 2.05 2.05 7.55 8.60
1.00 2.40 2.75 2.75 18.15 20.00
16,00 2.00 2.00 2.35 2.35 11.00 12.40
3.00 – 5.00 1.80 2.20 2.20 8.70 9.90

MATERIAL SPECIFICATION

Height of Soil
tower Bearing Foundation dimensions Excav. Concrete
Capacity
H (m) Σz A (m) B (m) t (m) t2 (m) m3 m3
(daN/cm2)
1.00 + UW
8,00 1.00
1.50
1.00 + UW
10,00 1.00
1.50
1.00 + UW
12,00 1.00
1.50
1.00 + UW
14,00 1.00
1.50
1.00 + UW
16,00 1.00
1.50

NOTE:
- Concrete MB 20 with min 250 kg cement /m2
- Geological and mechanical characteristics of the soil must be obligatory tested before concreting
- Material excecution conditions, quality, etc according to technical description

You might also like