To: East Grand Forks City Council Mayor Steve Gander, Council President Mark Olstad, Council
Vice-President Tim Riopelle, Council members Clarence Vetter, Ben Pokrzywinski, Dale Helms,
Brian Larson, and Karen Peterson.
Cc: File
• With all projects listed in the Building Maint. Fund, including $44,764 for Blue Line Arena
improvements related to this project, the account ends with a balance of $531.
• A few items listed in this fund require more discussion and input from City Council and/or Dept.
Heads on how they will be spent. They are:
o $120,000 for Senior Center rooftop units. This item was budgeted at $95,000 at the start
of the year, and the total project cost has continued to rise. The current estimate was
received this week at $120,000. I plan to have this item at an upcoming work session for
more discussion.
o $20,000 for Citywide Roof Repairs. This item originated from the 2021 Roof Spec Inc roof
repairs, to misc. repairs to buildings city wide. It is unknown at this time how much of it
will be spent by each department. This question has been asked, and is awaiting response
from all departments. As of Friday, April 28th, I have heard from Fire and Community
Development that they have no plans for roof repairs this year.
o Altru Fund Balance: Current balance of this account is at $141,547.
• FUNDING PROPOSAL: With the above listed balances, and if we confirm that the other Depts
don’t have plans to spend the $20,000 budgeted for Roof Repairs, I would suggest the following:
o $44,764 from Building Maintenance Fund (This covers the proposed work inside the Blue
Line Arena)
o $55,236 from the Altru Fund. This would reduce the total Altru fund to a current ending
balance of $86,311. Three years remain in our current program partnership.
-1-
31
Request for Council Action
Recommendation:
Recommend approval of the project going forward, with the City funding $100,000 of the total project
cost. City funds could be split with up to $50,000 coming from Building Maintenance funds; to be used
for the improvements in the Blue Line Arena, and the remaining $50,000 coming from our Altru
Partnership fund.
2
32
Request for Council Action
OR
2) Concrete on the entire ice rink playing surface
Enclosure:
Proposed Site Plan for outdoor rink – provided by Widseth
Proposed Project Estimate
Building Maintenance Fund Plan
3
33
MODEL: Def
aul
t
PATH: J:
\Bl
ue Li
ne Cl
ub Ar
ena-
31160\
2023-
10325\
CADD\
Civi
l\
2023-
10061_Denver
_Ri
nk.
dgn
3/28/2023
10
NORTH
Scale in Feet
R
20
2
8
'(
T
Y
P
)
5'
15'
4.
5'
4" CONCRETED SIDEWALK
HOME
B
B
200'
16.
5'
60'
VISITOR
85'
BLUE LINE ARENA
A
A
34
16.
5'
15'
55.7'
6" CONCRETE DRIVEWAY
© 2023 WIDSETH
SCALE: AS SHOW N
OUTDOOR RI
NK FACI
LITY THE LAW S OF THE STATE OF
DRAW N BY: RAB
C1.0
2. REINFORCEMENT STEEL
ON,OR REPORT
ON AND
4' - 6"
NEER UNDER
C.NO.
SI
6" 6" 85' 6"
RECT SUPERVI
LI
ONAL ENGI
CATI
HOCKEY BOARDS HOCKEY BOARDS
FI
PLAYERS
S PLAN,SPECI
W AS PREPARED BY ME OR UNDER MY DI
ICE RINK
CENSED PROFESSI
3" (TYP) BOX 18"
3" (TYP) 3" (TYP)
DATE:
2" (TYP) 2" (TYP)
FY THAT THI
IHEREBY CERTI
1'
NO. 4 REBAR CONTINUOUS
24"
24"
2" CLASS 5 AGGREGATE BASE
BY
NO. 4 REBAR @24" O.C.
2"
2" CLASS 5 FOUNDATION OPTION NO. 1 (SECTION A-A)
2"
6" 5' 6" AGGREGATE BASE
ON
PTI
ONS DESCRI
2% MAX SLOPE 18" 18"
FOUNDATION OPTION NO. 1 (SECTION B-B)
1.5% PREFERRED 24"
24"
SI
4"
REVI
REV#
2" CLASS 5 AGGREGATE BASE
DATE
NO. 4 REBAR @
24" O.C. EACH WAY
10325
2023
NO SCALE
RAB
SRE
02/
2023-
03/
SIDEWALK DETAIL
85'
4' - 6"
no scale
JOB NUMBER:
CHECKED BY:
DRAW N BY:
HOCKEY BOARDS ICE RINK
SCALE:
PLAYERS
DATE:
HOCKEY BOARDS
BOX 5" REINFORCED CONCRETE PAVEMENT
3"
3" NO. 4 REBAR @24"
3" 2" (TYP)
2" (TYP) O.C EACH WAY
6" REINFORCED CONCRETE PAVEMENT
12"
12"
2"
NO. 4 REBAR @24" O.C. EACH WAY (TYP)
NE CLUB
NNESOTA
6" 12" 12" 6"
2" CLASS 5
LS
TY
EAST GRAND FORKS,MI
ng.
ON DETAI
UNEXCAVATED GROUND
LI
i
nkFoot
NK FACI
24" NO. 4 REBAR - DRILL & EPOXY
Ci
CADD\ l
viRi
\
CONSTRUCTI
10325\
OUTDOOR RI
2023-
SHEET NO.
Bl
MODEL: Def
\
J:
C1.1
35
PATH:
SHEET OF
Blue Line Club Indoor Skate Tie Area & Players Benches
Skate Tie Area will be added in the Southeast corner of the blue line arena. Rubber flooring will be added to connect
from current lobby area, all the way around the rink to the SE corner.
Item Estimate Notes
BLC New Entrance Door $ 5,500.00 Door @ 10% over Cost, installation labor donated
Frame in New Door $ 1,000.00 LaborEstimate/ Donation more likely
Becker Arena Products quote $ 35,763.96 Skate Rubber, benches, players bench improvements
TOTAL $ 42,263.96
Option 1 Outdoor Rink Total $ 186,763.96 Dasher System, foundation ring, and skate tie area
Or
Option 2 Outdoor Rink Total $ 279,263.96 Dasher System, Concrete floor, and skate tie area