RENOVATION AND RECONFIGURATION WORKS AT LEVEL 1, LOT 1F-01, THE SHORE SHOPPING GALLERY, MELAKA

LAPORAN PEKERJA TAPAK BULAN : APR 2023 TARIKH : 10/4/23 - 30/4/23

Total this
Workforce 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
month
A Site Management
1 Project Manager
2 Engineer / Supervisor
B Building Works
1 General Worker
2 Carpenter
3 Plasterer
4 Tile
5 Iron worker
6 Alum Works & Glazer
7 Painter
8 Ceiling Worker
9 Plumber
C M&E Works
1 Electrician
2 Aircond
3 CCTV
4 Fire Fighting
5 IT
D Others

TOTAL
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0