MBD - (Logistic Park) - Bucharest North Butimanu PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

LAND + PROJECT

37.300 sqm
[LOGISTIC, PRODUCTION & INVESTMENT]

BUCHAREST NORTH, BUTIMANU - DAMBOVITA

FOR P.U.Z. APPROVED


SALE
EXCELLENT LOCATION

§ North of Bucharest

§ Direct access to DN1A

§ Flexible development

Land area: 37.300 sqm | Project area: 16.500 sqm


Extension potential up to 42.000 sqm land | 20.808 sqm development

2 / 70
LOGISTIC &
PRODUCTION
FACILITIES
PROJECT ON LAND

Turnkey project
including design,
approval,
construction and
management of
the utilities in the
building.

§ P.O.T. max = 50% H max = 15,0 m


P.U.Z. APPROVED heights +15.0 m are allowed for various equipment, assemblies specific to the investment
objective, advertising totem, etc.
§ C.U.T max = 1,0
Max. urban indicators:
§ Rh max = P+2E Green Area min = 20%
around the perimeter, a protective green zone with a width of min. 2.0 m planted with tall and
dense vegetation (recommended tuia columnaris); they will plant and maintain min. 1 tree / 100
sqm (recommended plane trees, beeches, oaks, lindens
3 / 70
PROJECT Class A BREEAM BMS Flexible Extension Options
SPECIFICATIONS Construction standards Green Building Certification Building Management System 37.300 sqm + available land
potential
Quick access to the city Direct access Workforce widely available Space
20 minutes to Bucharest center DN1 A – heavy traffic in the area & public transportation Spacious manoeuvring and
lines parking areas for cars and trucks

4 / 70
Standard Technical Specifications
Warehouse & office space, divided in comfortable units which the tenant can freely combine and adapt

§ 24 hrs. / 7
§ gatehouse with guarded security

§ 5t / sqm
§ floor loading capacity

§ +8m
§ shelves height

Functional categories of development (P.U.Z –


§ Up to 14 m R.L.U provisions) proposed
§ clear height
§ the regulated land is located partly within the village and partly
outside the village of Butimanu commune and it is proposed to
§ 24 m x 12 m introduce it entirely within the village

§ internal grid § proposed functions: IS and ID mixed function (public interest


institutions and services area and industrial production and
storage units area)
§ 1 dock leveller / 800 sqm § construction regime: isolated
§ Outside truck court depth of
35 m

5 / 70
Site layout
All access roads to the site suited for heavy transport

6 / 70
PROJECT TECHNICAL SPECIFICATIONS DETAILED

Utilities Resistance structure Facades

§ Indoor/outdoor electrical installations for strong currents The foundations are made of reinforced concrete, For the facades, materials that ensure a low heat transfer
and weak currents: input power of approx. 1,500 kW (for a isolated, cup-type under the pillars and reinforced coefficient, reducing losses and maintenance costs.
transformer of approx. 2,000 KW) concrete frames made up of pillars and beams
§ Gas: input power of approx. 1,650 and 2,000 kW respectively give the hall the possibility of adapting the interior Easy to install and maintain, the sandwich panel system
(without and with reserve for the optional expansion of the compartmentalization and expanding the hall using ensures the perfect combination of durable materials, clean
Warehouse) double foundations in the last axis of the hall. surfaces, ensuring through the variety of colors any
§ Potable water: inlet flow of approx. 4.50 respectively 6.50 l/s architectural requirement and a fire protection of 120 min.
(without, respectively with
§ freezing plant with water-cooled condenser) and additionally Roof The innovative system of windows and doors reflects the
for co- current trend of maximizing natural light while also offering a
§ sprinkler water tank nectars after a fire according to Safe and low-cost maintenance system that maximum level of sound and thermal insulation.
regulations. ensures an efficient and safe thermo-hydraulic
§ Water hydrants: availability according to country regulations insulation is made up of structural trapezoidal Equipped with motorized/hydraulic control and dynamic load
§ Rainwater: preferably soil infiltration system or discharge into sheets, high-density basalt mineral wool and PVC capacity of 6,000 kilograms, with insulation between leveler and
surface waters. Alternative connection to the sewage system membrane. frame. Dock levellers reach a height of 1.15 meters above the
according to calculations taking into account possible retention loading yard at the beginning position.
of rainwater. This cladding system can be easily adapted to a
light green roof and photovoltaic panels, efficient The industrial doors ensure a maximum supply height of 3.5 m,
Access ways connection energy sources that ensure: with a manual and electric actuation system, being equipped
§ + 20% renewable energy (in the case of with a hydraulic ramp and rubber protection systems, achieving
§ Width min. 7.00 m; installing photovoltaic panels); a fast loading and unloading flow.
§ Access height greater than or equal to 4.50 m; § BREEAM /LEED points by increasing the area
§ Maximum slope of the street of max. 6%; of the green area; All materials have BREAM certifications.
§ Road surface suitable for heavy traffic § cooling and more efficient operation of
photovoltaic panels by planting green areas
under them

The provided hatches and skylights ensure the


light requirement of 2% of the hall surface and
comply with the fire regulations in force.
7 / 70
PROJECT TECHNICAL SPECIFICATIONS DETAILED (2)

Flooring solution Lightning Class A OFFICE BUILDING

Helicoptered concrete floor, treated with metallic fiber, is calculated for a The efficient photocell led lighting system ensures exactly The office area ensures the balance between
maximum load of 5 tons/m2, and ensures a durable, clean, dust-free the necessary light automatically adjusted according to industrial/logistic activities and
space and is optimal for mounting racks. or production lines (only if the intensity of the natural light) The intensity of the light administrative/operational activities.
necessary) is thought differently for the hall area and the office area.
Some features that will emphasize why I chose led The space aims to ensure an optimal, pleasant
HVAC System lighting: environment by:

Through the air conditioning and ventilation system, the temperature is • Long life • modern, classy, durable finishes, excellent
exactly the one chosen, and the spaces that benefit from air conditioning • Energy savings of up to 90% acoustic properties;
and HVAC installations will be a pleasant environment for customers or • Compact size - small footprint • flexibility in compartmentalization;
employees. • High luminous efficiency (lm/w) • telephone wiring, data, internet connection;
• Resistant to vibrations and impact • Building Management System (BMS), i.e.
Fire detection & extinguishing system • Emit cold light automated building management system (software
• Great diversity of light distributions that controls, monitors and commands heating, air
Each fire compartment is equipped with ESFR sprinklers, but also with conditioning, ventilation, lighting and security);
portable fire extinguishers, in accordance with the rules in force and • the height per level to the false ceiling, minimum
ensures: 2.7 m;
• security services and building supervision,
§ Detection of fires, both in the building area, as well as in auxiliary maintenance and cleaning, restaurant.
spaces and rooms, as well as in less frequented compartments, • The use of recyclable and durable materials
therefore with an increased risk of late fire detection by staff recommended for BREAM points
§ Automatic fire signaling and/or by manual triggering of alarms and
internal telephones, as well as, as the case may be, at the fire CABIN GATE
department; RETENTION BASIN
§ The operational alarm of the service personnel who must organize and EXTERIOR ARRANGEMENTS – ROADS
ensure the first intervention and the evacuation of people from the PLATFORMS PAVEMENTS
building in accordance with the evacuation plans; SECTIONAL DOORS WITH HYDRAULIC
§ Sound warning of people in the building about the danger of fire; LEVELING RAMPS
§ Command and monitoring of fire doors;
§ Connection to the access control panel

8 / 70
THE SELLER

MASTERBUILD
General Contractor
& Property
Developer is one of
the most reputed
construction
companies in
Romania.

+15 years
experience in design & build
projects

Large logistic parks

Retail networks

Local & international


experience

9 / 70
Contact:

21 Sofia St., District 1, Bucharest,


Romania

+ 40.756.999.111
+ 40.752.299.707
+ 40.314.25.35.47

generalcontractor@masterbuild.ro

You might also like