FPM 222 Checklist Plumbing
FPM 222 Checklist Plumbing
FPM 222 Checklist Plumbing
PLUMBING WORKS
Checklist No. Date:
Name of Work: Drgs Ref:
Employer:
Contract No.:
Contractor:
Item Dscrptn: Inspection Requested by: BOQ No.
1. Box Outs
2. Pipe Sleeves
3. Embedded Items
4. Quality of Bulk Materials / RMC
GENERAL
5. Plastisizers / Additives
6. Expansion Joint Provisions if any
7. Existing Concrete Hacking & Cleaning
8. Special treatments in existing surface
CLEARANCE
Engineer Contractor
Clearance for Concreting Clearance Date
Details of Additional Steel Provided if any: [Other than specified in Drg.] Pour Start Date & Time:
POST CONCRETING
Stability of Formwork after Pour Acceptable To Improve Others [Specify] Acceptable To Improve
Sch. date for formwork removal with supports Actual Date of Removal
Sch. date for form work removal entirely Actual Date of Removal
Line, Level & finishing of Concrete surface Acceptable To Rectify Acceptable To Rectify
DESHUTTER
Dry finish
Wet finish
Grouting Task End Date:
Epoxy Treatment
Contractor: Resident Architect Client
1. Box Outs
2. Pipe Sleeves
3. Embedded Items
GENERAL
To
Method of Pouring & Vibration Acceptable To Improve Arrangement for Curing / Pon Acceptable
Improve
To
Stability of Formwork after Pour Acceptable To Improve Others [Specify] Acceptable
Improve
To
Line, Level & finishing Acceptable To Improve Acceptable
Improve
Sch. date for formwork removal with supports Actual Date o
Sch. date for form work removal entirely Actual Date o
To
Line, Level & finishing of Concrete surface Acceptable To Rectify Acceptable
Rectify
DESHUTTER
To
Removal of Battens, Maskin tape etc. Acceptable To Rectify Acceptable
Rectify
Action Required if any:- Remarks: Rectifications done as specified:
Dry finish
Wet finish
Grouting Task End Date:
Epoxy Treatment
Contractor: Resident Architect
PLUMBING WORKS
Checklist No. Date:
Name of Work: Drgs Ref:
Employer:
Contract No.:
Contractor:
Item Dscrptn: Inspection Requested by:
1. Gully drap no
2. Drap level
Gully drap
3. No of inlet pipe
4. Out let collection to Man hole No
5. Shaft No
CLEARANC
E