Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.


Topic Comments
Name of organisation* Sigma mall plaza is under construction by Habib Rasool Construction Company Pvt Ltd.
Site location* It's is located near 06 No.Chungi Gulgasht colony Multan, Pakistan
Number of workers There are 300 number of workers which are working at the construction site.
General description of the organisation Habib Rasool Construction Company Pvt Ltd is one of the well-known construction company in
Pakistan. The company is constructing a sigma mall plaza whose entire area is almost 5000
square meter and company offer its services in building, constructing infrastructures and
commercial building, shopping plazas. The total number of workers are almost 300 in which top
management officers, HSE officers, Manger, supervisors, helpers, foremen, Engineers, foreman,
helper etc. are included. The company main head office is located in Lahore and Area of office is
almost 6000 square meter. The sigma mall plaza has 10 stories and one basement. The
basement area will use for the car parking and other stories will use for restaurants, shopping
stores, security staff rooms, general stores and management offices and the roof of the plaza will
use for park. There are different working activities are doing like workers were carrying bricks
from ground floor to 3rd floor, some workers were using mixer machine and mixing the silica sand
and cement, many of the workers were unloading the steel bars and some workers cutting the
steel bars, many of the workers were painting the walls of the plaza, welder is doing welding
activity etc. The material which is being used in the construction site like cement, bricks, stones,
steel bars beams, shuttering, silica sand and machinery which is being used like fork lifter welding
plant disc cutter, drill machine, Crane water tanker etc.
There are two shift patterns in the company the first shift will start from 8:00AM to 4:00 PM and
2nd shift will start from 4:00Pm to 12:00PM and some other workers works as overtime. The total

Learner number: Learner name: Page 1 of 18


working days in week are almost 6 days and Sunday is off day. There is only one hour for the rest
breaks for the workers and total working hours for the workers in week are almost 48 hours.
The whole entire area of the sigma mall plaza is Included for the risk assessment like basement
Description of the area to be included in the
area, roof of the plaza and all stories of the plaza, the stairs of the plaza are also included dated
risk assessment on 25 March 2022
The HSE manager and HSE officer is responsible for the Health and safety polices of the
Any other relevant information company and safe working environment for their worker
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

You should aim to complete this section in 100 - 200 words.


Note: this section can be completed after you have competed your risk assessment.
External
I visited the international labour organization official website and I got a lot of information about
the hazard at the construction site. I also got information about the hazard which we are facing at
the site during the construction of the sigma mall plaza.
C167 - Safety and Health in Construction Convention, 1988 (No. 167)
https://www.ilo.org/dyn/normlex/en/f?p=NORMLEXPUB:12100:0::NO::P12100_ILO_CODE:C167
Outline how the risk assessment was Health and safety in construction HSG150
carried out this should include: https://www.hse.gov.uk/pUbns/priced/hsg150.pdf
Moreover I visit the ISO website for further information about construction hazards ISO and
 sources of information consulted;
construction
 who you spoke to; and https://www.iso.org/files/live/sites/isoorg/files/store/en/PUB100317.pdf
 how you identified: Internal
- the hazards; When I got information from the ILO and HSE official websites then I visited the working site and
- what is already being done; and talked to the supervisors, managers and workers. I interviewed the workers and asked them
- any additional controls/actions which hazards they are facing at the work site. I asked from the workers about the health and
that may be required. safety polices of the company and I saw there some workers were not wearing proper PPE, s and
some workers were not working in proper way. I noted a lot of hazard at the working site like work
at height, slips and trips, entanglement etc. when I got complete information about the site and
their hazards then I checked the accident record of the company from the record office. I checked
the total death rate of the workers and accident rate.
Controlling the risks: I would suggest additional controls for hazards according to ILO (international
labour organisation such as for noise, vibration and hazardous substance, I recommend ILO C148 and HSE
standards.

Learner number: Learner name: Page 2 of 18


ILO Convention C148 - Working Environment (Air Pollution, Noise and Vibration)
Convention, 1977 (No. 148) article 3
https://www.ilo.org/dyn/normlex/en/f?p=NORMLEXPUB:12100:0::NO::P12100_ILO_CODE:C148

Managing construction health risks:


https://www.hse.gov.uk/construction/healthrisks/managing-essentials/review-the-controls.htm

Learner number: Learner name: Page 3 of 18


Part 2: Risk Assessment

Organisation name: Habib Rasool Construction Company Pvt Ltd.


Date of assessment: 25- March -2022
Scope of risk assessment: The whole entire area of the sigma mall plaza is Included for the risk assessment like basement area, roof of the plaza
and all stories of the plaza, the stairs of the plaza are also included.

Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
1. Work at Workers, masons, helper, Workers were fully trained and 1- New ladder must be provided 15 days Site
height foreman, operator and all the essential PPEs was to the workers for work at supervisor
other individuals might be provided to the workers like height 1 week HSE officer
The workers harmed from the work at safety helmet, shoes, gloves 2- Permit to work must be issued
are working at height hazard. coverall etc. before the start of the work 10 days Site Manager
the top floor of Emergency first aider was 3- Only experienced and
the plaza During working at height present at the site during the competent workers must do
without using without using safety work at height activity. the activity 1 day Safety Officer
safety harness harness and with using SUPERVISON must be 4- Tool box talk must be essential
and the ladder damage ladder so there is provided to the workers for the workers 15 days Safety officer
which they are chance of big accident. 5- Safe system of the work must
using is badly The workers can fall from be provided to the workers 1 week Site
damage during height or from damage 6- Safety harness must be supervisor
working. ladder so the serious provided to the workers. 10 days Site
consequences will 7- Safety nets must be installed at supervisor
happen like head injury, the workplace
leg or arm break 8- Safety belts and other PPE,s 1 week Safety officer/
permanent disability and like safety harness should be finance
sudden death will occur. provided to the workers manager

2. Electricity Workers themselves, Workers are using PPE, s at 1- Newly double insulated electric 10 days Electrical
The workers operators, helpers, work place like gloves , helmet wire should be placed instead Engineer
are working electrician, and other coverall, and safety shoes etc. of damage wire.

Learner number: Learner name: Page 4 of 18


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
beside the individuals might be harm but they were not fully trained. 2- The electric wire of the 1 week Electric
electric from this accident. generator must be Supervisor
generator and underground. 4 days Site manager
the electric Workers are working near 3- Barricade the area of electric
wire of the the damage wire of the generator where it is present. 1 week Safety officer
generator is electric generator. So 4- Trainings must be given to the
damage so there is chance of electric workers. 4 days Safety officer
there is shock the workers may 5- Permit to work must be issued
chance of get face high risk accident to the workers. 1 month Admin
electric shock like due electric shock 6- Only experienced and Manager
to the workers. sudden death of the competent workers must do
workers may occur, skin the work. 1 week Safety officer
burn, or other serious 7- Warning signs must be
injuries may occur. installed at the workplace 15 days Admin
8- First aider must be present at manager
the work site during working.
3. Fire Welder himself, workers, Tool box talk was provided to 1- Separate area should be 30 days Project
The welder is helpers, technicians, may the workers and informed them construct for the storage of the Manager
doing welding get harm during the how to rescue themselves from petrol drums away from the
activity near accident. the fire hazards workplace.
the petrol Fire watch was present at the 2- Barricade the area of the petrol 2 weeks Site manager
drums. The During welding activity the site drums from the worksite
petrol drums petrol drums are present Supervision was provided to 3- Warning signs must be 1 week Safety officer
are present in openly so there is chance the workers and monitoring as installed at the work site.
open area so of fire explosion and well. 4- Smoke detector alarm must be 1 week Site Manager
there is serious consequences will installed.
chance of fire happen like death of the 5- Fire alarm must be installed. 1 week Site Manager
explosion due workers will occur skin 6- First aider must be present at 15 days Admin
welding damage or skin burn, the worksite. manager
activity. permanent disability etc. 7- Fire extinguisher must be 1 month Site
installed at the work site supervisor
8- All the essential PPE,s must be

Learner number: Learner name: Page 5 of 18


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
provided to the workers during 1 week Safety officer/
welding activity like face shield admin
etc. manager
4.Manual All the workers and other Induction training was provided 1- For unloading the steel bar 15 days Project
handling pedestrians might be to the workers and mock drills they must provide automatic Manager
The workers harm during working. was performed related to the machines like fork lifter crane
were manual handling job. etc.
unloading and Due to continuous 2- The workers must be 2 weeks Admin
carrying the working of the unloading competent young and Manager
steel bars o the steel bar the experienced. 1 week Safety officer
continually on workers will face health 3- Rest breaks must be provided
their issues like back pain, to the workers. 1 week Site
shoulders. knee pain and physical ill 4- Job rotations must be given to Supervisor
health and workers may the workers. 1 week Site Manager
get serious injuries on 5- Shelter area must be provided
their body. to the workers. 1 week Safety officer
6- Warning signs and safety signs
must be installed at the
worksite. 1 week Admin
7- All the PPE,s like gloves, Manager
safety jackets etc. must be
provided to the workers.
5. Slips and All the workers, masons, All the essential PPE,s were 1- Clean the spilled polish by 1 week Housekeeping
trips foremen, supervisors etc. provided to the workers like using spill kits and place incharge
The workers may get harm and other safety shoes, helmet, coverall, warning signs about slip fall
are working at individuals. safety jackets, safety gloves risk.
the 2nd floor of etc. 2- Housekeeping must be 1 week Foreman
the plaza and When workers will work in The workers were competent essential before the start of the
the floor is the slippery floor then for the job work.
slippery due to there is chance of 3- Warning signs must be 7 days Safety officer
wood polish workers accident and the installed at the work place.

Learner number: Learner name: Page 6 of 18


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
spillage. workers can slips during 4- Emergency exit must be 1 week Safety officer
working as none of them present in case of accident
using anti-slip shoes and 5- Unrestricted person should not 1 week Foreman
they will face serious allow going there.
health issue or injuries 6- Only trained workers must do 15 days Site
like head injury, leg break the activity. supervisor
etc. 7- Supervision must be provided 2 days Safety officer
to the workers.
8- Proper trainings must be 1 week Safety officer
provided to the workers
9- First aider must be present or 2 weeks Admin
deployed at the workplace. Manager
10- Special PPE’s must be Admin
provided to the workers like 10 days Manager/
anti-slip safety shoes. Safety officer
6. Noise All the workers The workers are using ear 1- New disc cutter must be 2 weeks Project
themselves which were muffs during working replaced instead of damage Manager
The workers working at the site may Tool Box talk was provided to disc cutter. 1 week Mechanical
were using get harm from this the workers related to the noise 2- Noise absorbent material like Engr.
disc cutter hazard. hazards foam scrubber must be 1 week Safety officer
machine which Due to high noise the Safety signs boards and installed.
was badly workers will face serious warning signs was installed at 3- Permit to work must be issued 3 days Admin
damaged and consequences like the site. for the disc cutter activity Manger
disc cutter was unconsciousness, mental 4- Only trained and competent 1 week
creating a ill health, hearing loss person must do the work Safety officer
noise. problem and depression 5- Proper training must be given 1 week
will occur and it will to the workers. Safety officer
impact of worker health. 6- Safe working environment
must be provided to the 1 week
workers. Site
7- All the essential PPE’s are supervisor
provided to the workers but /Safety officer

Learner number: Learner name: Page 7 of 18


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
enforce them to use instead
fines them on violation.
7. Vibrations The workers themselves SUPERVISON and monitoring 1- Automated hammering 1 month Project
and other might be was provided to the workers machine must be used for the Manager
The workers harmed which may come Induction trainings was activity. 1 week Site
are using in contact. provided to the workers 2- Job rotations must be provided Supervisor
hammer for The workers are suing Mock drills was performed to the workers. 10 days
compacting hammer for compacting related to the vibrations 3- Rest breaks must be provided Activity
the sand the sand without any hazards. to the workers. 15 days Incharge
continually and safety precautions then it 4- Shelter area must be present Site
they are not may chance of accident at for the workers. 10 days Supervisor
using PPE’s the work place the serious 5- Only experienced and
during consequences may be competent workers must do 2 days Admin
working. occur like foot injury, leg this activity. Manager
break, muscles problems, 6- Tool box talk must be Safety officer
back pain, vertebral conducted for the workers.
column issues etc.
8. Movement All the workers Warning signs are 1- Separate path way must be 1 month Site manager
of the people themselves, visitors, implemented at the pathway constructed for the pedestrians
and vehicles drivers and other Emergency alarm is installed at and vehicles.
at work place individuals which use this the work place 2- The driver of the moving 15 days HR manager
pathway my get harm. vehicle must be competent and
The workers experienced.
and vehicles If collusion between the 3- All the safety signs board must 7 days Safety
are using workers and vehicles will be installed. supervisor
same pathway occur then serious 4- Irrelevant person should not be 1 day Foreman
so their accident will occur the go their.
chance of consequences of the 5- Emergency and warning signs 1 week Safety officer
collusion accident will serious like must be installed.
between head injury, leg or arm 6- First aider must be present 15 days Site
workers and break, permanent who must be trained supervisor/

Learner number: Learner name: Page 8 of 18


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
vehicles. disability and death of the admin
workers may occur at the manager
spot.
9. Confined Welder himself, helper, SUPERVISON was provided to 1- There must be proper entrance 4 days Site
space co-workers and other one the workers and exit provided to the supervisor
who is there might be Whole watcher was present workers 1 week Site In-
The welder is harmed at the site. during confined space activity 2- Proper ventilations must be Charge
doing welding Tool Box talk was provided to provided to the workers like
activity in The welder is doing the workers related to the job LEV 5 days
storage tank activity in the confined Safety officer
3- Emergency procedures also
without using space and he is not using
provided to the workers
PPE,s and any breathing apparatus 15 days
4- Trained and competent
breathing or not following the Safety
workers must do the activity.
apparatus. instruction so there is 1 Week Supervisor
5- Safety signs boards must be
The oxygen huge chance for the Safety officer
installed at the workplace.
level inside the accident and serious 3 days
6- There must be safe system of
tank is too consequences will Safety officer
the work develop at the work
much low. happen like suffocation, 1 week
place.
breathing problem, Safety officer
7- Emergency first aider must be
depression, anxiety and
present over there.
death of the workers may Safety officer
8- Permit to work must be issued
occur.
to the workers.
Safety officer
9- There must be all the essential
PPE, s like face shield, SCABA
etc.

10. Lone The worker himself may Warning signs were displayed 1- Only trained and competent 10 days Site Manager
workers get harm from this at the worksite worker must the work.
The worker is hazard. Emergency plans were also 2- There must be co-worker at the 7 days Site
doing implemented work place. supervisor
maintenance The worker is doing 3- Emergency alarm must be 1 week Site Manger

Learner number: Learner name: Page 9 of 18


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
work of store maintenance work in installed at the work place.
room which is store room and there is 4- The workers must be trained 15 days Safety officer
away from the no co-worker. The worker how to handle the emergency
worksite and can face a lot of problems situations.
there no co- during working alone and 5- There must be proper 1 week Site Manager
workers with serious consequences will communication between
him. The occur. worker and site management.
worker is 6- Emergency first aider must be 1 week Admin
doing hard job present over there. manager
lonely and he 7- Permit to work must be issued 6 days Safety officer
may get to the worker.
damage during
working a job
11. Slips and All the workers, visitors, Safety signs board were 1- Clean the spilled oil using spill 2 days Housekeeping
trips masons, helper, implemented and workers were kits. staff
technician, supervisor and fully experienced 2- Training must be given to the 1 week Safety officer
The workers other people may get workers.
are doing harm 3- Supervision of the workers 1 day Safety officer
housekeeping must be done during working.
at the stairs Due to oil present over 4- Emergency exit must be 3 weeks Site manager
and oil is the stairs then there is present. 1 week Site
spread over chance of slipping of the 5- Warning signs must be present Supervisor
the stairs. workers during over the place. 1 week
There is housekeeping and 6- There must be no entry of Site
chance of accident will occur at the irrelevant person. 1 day supervisor
slipping of the site injuries on the 7- Barricade the area where is oil
workers workers body happen like is spread over there. 5 days Foreman
leg injury , arm or knee 8- PPE, s must be given to the
break, skin damage or workers like safety shoes etc. Safety officer/
other serious injury will admin
occur manager

Learner number: Learner name: Page 10 of 18


Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
12. Work at All the workers which are 1- New inspected scaffolding 20 Site
height doing this activity may get must be provided to the supervisor
Workers are competent and
harm and other workers for the painting activity
using some PPE’s though
The workers individuals also may get 2- Only do such activities 15 days Admin
safety harness not provided.
are doing harm which may come in competent person and Manager
painting contact. experienced
activity at the 3- Permit to work must be issued 2 week Safety officer
Sound and safe working
walls of the The workers are not using for the work at height
platform provided for activity.
plaza by using safety harness by using 4- First aider must be present at 1 week Site
damage damage scaffolding and the working site Supervisor
scaffolding. they are doing painting 5- Proper training must be given 15 days Safety Officer
activity at the 2nd floor the to the workers
worker may fall from 6- Tool box talk must be 1 week Safety officer
height due to negligence conducted on the daily basis
or due to not wearing of 7- Safety belts and safety nets 15 days Site
safety harness then must be installed at the work Supervisor
serious accident will occur place for work at height hazard
and workers may get 8- All the essentials PPE’s must 15 days Safety officer
head injury, leg or arm be provided to the workers like
break, vertebral columns safety harness, helmet and
injuries and sudden death safety shoes etc.
of the workers will occur.

Learner number: Learner name: Page 11 of 18


Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral and financial arguments for ALL actions

Moral, general legal and financial Moral arguments


arguments
It is the moral responsibilities of the company to provide safe working environments to their workers
at the work site because workers came there to earn money and they provide services; and it is
mandatory to reduce global deaths rate (2.75 million as per ILO) due to work related accidents, ill
heaths. If accident occur at the workplace then the worker may face a lot of consequences like
medical problems financial issue social issue. The worker may be single person who earn for their
family. There is moral responsibility of the company to provide all the basic PPE, s to their workers.
If an accident occur then worker may get into the stress and other consequences like mental I'll
health, permanent disability.
Financial Arguments
When a worker will get injury then there is responsibility of the company to provide all the financial
aids and medical treatments. If a worker get serious injury then all the medical treatment expenses
will bear company itself and will provide financial help to the workers family. Due to accident the
property loss will also bear company and other sever consequences as well. Due to accidents the
behaviour of the worker will damage and workers will not rely on the company safety policies. Due
to accident occurrence the employer will bear costs like medical expenses of workers direct and
indirect costs as well and property loss also occur.
Legal arguments
Due to accident the enforcement authorities can take actions on the company. When an accident
occur then the enforcement authorities can fine on the company or banned for specific period of
time. If the severity of the accident is high then criminal court can demand final report of the

Learner number: Learner name: Page 12 of 18


accident and company can be banned permanently. The legal response of the company towards
workers will also matters. A lot of enforcement authorities impose duties on the employer to follow
the health and standards as per ILO conventions so ILO convention C167 - Safety and Health in
Construction Convention, 1988 (No. 167) is specifically for legal arguments as well.

Justification for action 1

Action New ladder must be provided to the workers for work at height. (hazard category: work at height)

Specific legal arguments The Habib Rasool company is responsibility to provide safe working environment for their workers
at the work place and ILO CONVENTION regarding work at height hazard says that C167 - Safety
and Health in Construction Convention, 1988 (No. 167)” article 14 and clause 09 and 10:
 In the absence of opportunity safe way of get entry to improved operating places,
appropriate and sound ladders will be supplied. They shall be belongings secured against
inadvertent movement.
 All scaffolds and ladders will be constructed and used in accordance with country wide laws
and regulations.
According to the Punjab health and safety act 2019,
“Whoever, except duly authorized or in case of necessity, gets rid of any equipment, device,
furniture, substances, fencing, gangway, ladder, lifesaving approach or appliances, lighting fixtures,
marks, level or different things required to be provided through or below the rules made below the
Act or having in case of necessity, removed this sort of machinery, equipment’s furniture, materials,
fencing, gangway, equipment, ladder, lifesaving means or appliances, lighting fixtures, marks, stage
or other matters and omits to repair it on the give up of the duration for which its elimination turned
into legal or essential, shall be punished with high-quality which may also expand to rupees
hundred thousand”
The company health and safety polices regarding work at height hazards are very professional. All
the PPE, s are provided to the workers like safety harness safety belt etc... And the moral of the
worker is very high. All the safety precautions are taken for the work at height hazards.
Consideration of likelihood AND severity There are almost 20 Workers are working at the top floor and using damage ladder during working
and the workers are working without using safety harness. The workers work there 5 hours a day

Learner number: Learner name: Page 13 of 18


regularly and The risk level of the hazard is very likely because many workers are working on daily
basis. There is chance of breaking of ladder and likelihood of the accident is very likely.
 Insignificant: No harm or damage observes at the workplace.
 Minor: just little injury on worker body for example, small burns or cuts on the body. First
aid may be needed.
 Major: in this case the injured on head, or any part of the body can damage and the bone
are broken and due to these injuries Hospital treatment required.
 Catastrophic: Death of the employees and property loss may also occur.
Severity of the accident is discussed in between major and catastrophic conditions, in major
condition the worker may get serious injuries like head leg break or disability of the workers, also
property loss will occur due to accident when ladder will damage or break. But in case of the
catastrophic the workers death may occur and huge financial loss will occur.
How effective the action is likely to be in
When new ladder will be provided to the workers during working at height the accident chance will
controlling the risk. This should include:
be decreased and risk rate will be minimized. The new ladder is realistic and there is no damage so
 the intended impact of the action; there is no chance of accident. The workers will work in safe environment and the moral of the
 justification for the timescale that you workers will increase.
indicated in your risk assessment; The time frame for the purchasing and installing a new ladder is almost given 15 days to the site
and supervisor. Within the given time frame the supervisor will issue the budget from the finance
 whether you think the action will fully manager and he will purchase a new ladder. All the document work will be done in given time
control the risk. frame.
This control measure which I suggested it will control all the hazard of work at height but safety
harness and other PPE, s must be provided to the workers.

Justification for action 2

Action Newly double insulated electric wire should be placed instead of damage wire. (hazard category:
Electricity)
Specific legal arguments The company has a first responsibility to provide safe working environment to their employees at
the worksite and the ILO convention regarding electricity hazard says that C167 - Safety and
Health in Construction Convention, 1988 (No. 167)

Learner number: Learner name: Page 14 of 18


in article 26”
 Adequate efforts must be taken before and during construction to determine the presence
of, and to protect employees from, any live electrical cable or device that is beneath, over,
or on the construction site.
 The installation and maintenance of electrical cables and apparatus on building sites are
governed by national technical norms and standards
According to the Punjab health and safety act 2019 it says about the electricity hazard,
(g) “instructions, training and supervision in relation to employment on dangerous machine and
fencing or casing of machinery, wet floors, open wiring, safety escapes, emergency exits, safe
electric wiring and fitting etc.”
The company health and safety polices regarding electricity hazards are reliable. There is very low
accident rate for electricity hazards and the workers are workings in safe environment. The moral of
the workers is very high and all the essential PPE, s are provided to the workers for electricity
hazards.
Consideration of likelihood AND severity Almost 5 Workers are doing their job and there is damage electric wire of the generator present
over there. Workers works there on daily basis and the risk of the accident is very high. The worker
may get electric shock during working so the likelihood of the accident is very high and the severity
is given below:
 Insignificant: No harm or damage observes at the workplace.
 Minor: just little injury on worker body for example, small burns or cuts on the body. First
aid may be required for the little injuries.
 Major: in this case, skin burning, body damage or paralysed due to getting electric shock of
damage electric wire. Hospital treatment required may be required and it may take few
weeks or some days for the recovery of the workers health.
 Catastrophic: Death of the employees may occur or property loss may also occur.
we discuss severity in major case the worker will get serious injuries like skin damage disability and
other serious consequences as well property damage. In the case catastrophic case the worker
death may occur or permanent disability of the worker may occur because of getting electric shock
due to damage electric wire as well.
How effective the action is likely to be in When newly double insulated electric wire will install for the electric generator instead of damage
controlling the risk. This should include: wire then the hazard level of the electricity will decreased at some extent. Because newly electric
 the intended impact of the action; wire is double insulated and there is no damage on the wire. There no chance of electric shock to
 justification for the timescale that you the workers. The workers will work in safe working environment.
indicated in your risk assessment; The time frame for the installation of double insulated electric wire is only 10 days as risk is high,
and must be controlled on early priorities. Within given 10 days he will install the electric wire and all the
 whether you think the action will fully paper work will done in this period of time. He will issue a budget from the finance manager for the

Learner number: Learner name: Page 15 of 18


control the risk. new electric wire.
This control measure will cover all the hazard level regarding electricity hazard to significantly low
level. But to fully control the risk all other actions suggested must be carried alone with this action
such as proper availability of the PPE, s is very essential. Then will no chance of hazard of
electricity.

Justification for action 3

Action Separate area should be constructed for the storage of the petrol drums away from the workplace.
(hazard category: fire )
The company is working according to the safe system of the work and workers relay on the safety
Specific legal arguments
policies of the company and the ILO conventions says about the fire hazard in C167 - Safety and
Health in Construction Convention, 1988, in its article 29,
1. The company or employer shall carry or implement all suitable measures to
(a) avoid the risk of health and safety
(b) combat speedy and efficaciously any outbreak of hearth, fire or emergency,
(c) Bring approximately a quick and safe evacuation of individuals.
2. Sufficient and suitable storage will be provided for flammable beverages, solids and gases. The
Punjab health and safety act 2019 says about the fire hazard, employer shall take all practical
measures for the prevention of fires or explosions and for the provision of safety measures in the
event of fire or explosions as well.
The company is not working according to the health and safety rules of the ILO. That’s why the
workers are facing a lot of serious consequences. The moral of the workers is very low and they
don't believe the poor health and safety policies of the company.
Consideration of likelihood AND severity Welders are doing welding activity near the petrol drums. The workers works there on daily basis
and the petrol drums are present in open atmosphere. The fire explosion may occur due to
negligence of the workers because when fuels sources will get heat source then fire generate and
the likelihood of the accident is very likely.
Insignificant: No harm or damage observes at the workplace.
 Minor: just little injury on worker body for example, small burns or cuts on the body.
First aid may be needed for the workers when accident occur.
 Major: in this case the injured on head, skin burning, and the bone are broken.
Hospital treatment required or disability of the workers may happen.
 Catastrophic: Death of the employees will occur or property loss may occur due to

Learner number: Learner name: Page 16 of 18


fire hazard.
In major case the severity of the accident will high and the workers may get serious injuries like skin
burn, body damage, paralysed or disability and other serious consequences regarding health
problems but in case of the catastrophic condition both property loss will occur and the death of the
worker will happen on the spot or permanent disability of the worker will occur.
How effective the action is likely to be in
When a new separate area will be constructed for the petrol drums away from the work site then
controlling the risk. This should include:
the risk level of the hazard will be eliminated because ignition source will be eliminated and there
 the intended impact of the action; will be no chance of fire explosion. The welder is doing welding activity near the petrol drums so
 justification for the timescale that you when ignition source will be away from the work site then fire hazard will never occur. The worker
indicated in your risk assessment; will do their work in safe manners.
and The time frame 30 days is suggested for the construction of the new separated area for the petrol
 whether you think the action will fully drums away from the work site. The manager will complete all the procedure of the new area and
control the risk. he will issue a budget, all paper work will done in given time frame. When new area will be
constructed for the petrol drums then there will be no danger of the fire accident.
This control measure will fully control the fire hazard and there is need to provide all other
suggested actions along with this one such as essential PPE’ s to the workers like face Shields face
mask etc. must be given.
Part 4: Review, communicate and check
Suggested word counts for each section:
 Planned review date or period and reasoning for this: 50 - 100 words
 How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
 Follow up on the risk assessment: 100 - 150 words.

Planned review date/period with Being a safety officer I will do risk assessment of the work site every year and the next risk
reasoning assessment date is 26- March 2023 because it is included in the policy of the company to review
the risk assessment every year. The reason is that the working process may be change, or the
accident rate of the workers may increase or the enforcement action may be increased. Due to
compensate the enforcement action there is need to do risk assessment every year and new
findings will be covered.
How the risk assessment findings will be When I will complete the risk assessment of the work place then I will share all the major findings of
communicated AND who you need to tell the workplace to the top management, senior management and to the general manager of the
company via Email. I will arrange Tool Box talk meetings with workers and other management

Learner number: Learner name: Page 17 of 18


officers to inform them about the new findings of the work site and I will inform them about the
hazard of the work site. I will display all the major findings on the company notice board. I will
inform the workers about the accidents severity and I will tell them about the safety precautions. I
will do the proper supervision of the workers and will provide safe working environment. Finally I will
include all the new major findings into the company manual record. I will arrange training sessions
for the workers of the company to implement the findings and I will share all the new major findings
to the director of the company.
How you will follow up on the risk I will make a system that will ensure me before one week of the review date of the risk
assessment to check that the actions assesment.Then I will contact with the manager of the company either the improvements are made
have been carried out or not at the working site to minimize the hazard level. I will ask to show me the proof of the
improvements by a capture the photos or videos. If there is any financial problem then I will contact
with the finance manager and I request to him for the budget to implement findings. After that if any
accident occur or problem will happen then I will contact with manager of company. After all the
steps taken then I will check either All the safety measure are taken or not or workers are followings
the safety precautions.

Learner number: Learner name: Page 18 of 18