Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
Work at height Worker and painter who 1. Supervision and safety 1- Provide a new fully 2 weeks Site manager
It was observed are doing work at the top trainings about the work at inspected ladder to the
that painter was floor of the plaza will be at height and painting painter for painting
doing painting high risk. activities given to the activities on top floor.
activity on top painter and workers. 2- Hire a competent, 1 month HR admin
At the top floor worker
floor of the 2. TBT session conducted experienced and trained
J.Heights by the and painter was doing for the painter. workers and painter for
use of damage painting activity by the 3. Safe working method work at height activities.
ladder. The use of damage ladder and statement given to the 3- Induction trainings given
painter was not without any safety workers. to the workers and 1 week Safety officer
using safety equipments so the painter.
harness and workers can fall from 4- Permit to work system 1 week Permit issuer
other PPEs. height and can cause must be followed before
bone break or fracture, the start of work.
5- Emergency first aider 1 month Site manager
skin damage, body cuts,
must be present at the
muscular injuries,
site. 2 weeks Safety officer
backbone injuries, 6- Fall array system must be
paralysed and workers installed at the site like
death may also happen. safety nets, safety belts,
and safety harness. 2 weeks Safety officer
7- Personal protective
equipments PPEs
provided to the workers e.
Safety helmets, shoes,
Action Provide a new fully inspected ladder to the painter for painting activities on top floor.
(Observation- work at height)
Specific legal arguments ILO convention and recommendation says about the work at height hazard at construction sites. As
specified in the ILO convention “C167 - Safety and Health in Construction Convention, 1988
(No. 167)” says about the safe use of ladder which will be fully inspected in article 14 and clause 2
and 3.
2. “In the absence of alternative safe means of access to elevated working places, suitable and
sound ladders shall be provided. They shall be property secured against inadvertent movement”.
3. “scaffolds and ladders shall be constructed and used in accordance with national laws and
regulations”.
“ PUNJAB OCCUPATIONAL SAFETY AND HEALTH ACT 201 (Act IV of 2019)”
The Punjab health and safety act 2019 says about the safe use of ladder during working at height in
article 19. Clause (3).
(3) “Whoever, unless duly authorized or in case of necessity, removes any machinery, equipment,
fixtures, substances, fencing, gangway, ladder, lifesaving means or appliances, lights, marks, stage
or other things required to be provided by or under the rules made under the Act or having in case
of necessity, removed any such machinery, equipment’s fixtures, substances, fencing, gangway,
gear, ladder, lifesaving means or appliances, lights, marks, stage or other things and omits to
restore it at the end of the period for which its removal was authorized or necessary, shall be
punished with fine which may extend to rupees two hundred thousand”.
Izhar Construction is following ILO and ISO standards and it’s Labour law is as per ILO policies.
The accident rate of Izhar Construction is very low and workers are satisfied about the organization
health and safety policy.
Consideration of likelihood AND severity Two painter and one workers was doing painting activity on the top floor and using damage ladder
and without use of safety equipments. During working the ladder may break and workers can fall
Action Provide a new double insulated electric cable for the drill machine which must be inspected.
(Observation- electricity)
Specific legal arguments ILO convention says about the safe use of power tools and electrical cables and mentioned in C167
article 26 clause 4.
Consideration of likelihood AND severity At the site operator was using power tool (drill machine) for drilling operation and the electrical wire
of the drill machine was badly damage and worker was doing work regularly a whole day so there
was chance of getting electric shock during working with machine. The likelihood of the electricity
hazard is very likely because worker may get any time electric shock during working so serious
consequences will happen and the severity of the hazard will be.
Insignificant: no harm or damage will happen at the construction site due to electricity hazard.
Minor: Minor damage or injuries on worker body will happen and first aid should need.
Major: Due to high electric shock workers body may damage badly or disability so medical
treatment need to the workers as well.
Fatal: High electric shock cause sudden death or workers, equipment may damage or permanent
disability.
Insignificant and minor cases are normal condition of severity because these two conditions are not
serious and worker remain safe. But major and fatal cases severity is more dangerous because in
major case worker will get high electric shock and his body part may fully damage or burn and in
this case medical treatment need so it’s Too much risky. But in fatal case by getting electric shock
worker death may happen on the spot due to high severity of hazard and equipment may also
damage.
How effective the action is likely to be in
A new electric cable will be installed in drill machine which will be double insulated and inspected.
Action Develop a separate storage place for the petrol drums away from the work site.
(Observation- fire hazard)
Specific legal arguments “C167 - Safety and Health in Construction Convention, 1988 (No. 167)” as mentioned ILO
convention about electricity hazards and their suitable control measure in article 29 clause 2.
2. “Sufficient and suitable storage shall be provided for flammable liquids, solids and gases”.
“ PUNJAB OCCUPATIONAL SAFETY AND HEALTH ACT 2019 (Act IV of 2019)”
The Punjab health and safety act 2019 says about the control measure of fire hazard and safe
storage area for the fuel source In article 3 and clause (n).
(n) “Take all practical measures for the prevention of fires or explosions and for the provision of
safety measures in the event of fire or explosions as well”.
Izhar Construction HSE policy is as per ILO and ISO standard and provide safe and healthy
working environment to their workers. Izhar Construction is certified ISO 14001 and accident rate is
too much low but further control measure should be taken about the fire hazard like fire safety
tarinings,emergency fire mock drills etc.
Consideration of likelihood AND severity At the site 3 workers were smoking at the site near the electric generator and petrol drums were
present for the fuel use of electric generator. Petrol drums were openly present and workers were
doing their job on regular basis so during working petrol drums may catch a fire due to workers
smoking and fire hazard will happen so the likelihood of the fire hazard at the site is very likely and