Name of work

Revasa Vilage kmConst818.rvct00ionof ofNH-2)4-aneas NH-29


a
Bypass connecting N29 (nea Sandaha Village km 1 170 of N 25 wth Nte
Varanasi Phase- Package-2 rom Desig chainage km 30
400
km $7 3202% 720km (Total Length 27part270km including
of Bypass to interchange loop at NH-2in the State of Uttar Pradesh unde
GAMMON
NHDP Phase- Vl on EPC mode
GMN 0104OACF100-00
CLIENT
NATIONAL HIGHWAY AUTHORITY OF INDIA
AUTHORITY ENGINEER MALVIYA INFRA PVT. LTD
L.N.
CONTRACTORS PRIVATE LIMITED
EPC CONTRACTOR GAMMON ENGINEERS AND
REQUEST FOR INSEPECTION

Date of inspection o922


Date of Submission
318/22 Time of Inspection

REI NO hecrvNs|H]28s34
ITEM ENB
Chainage
32+ oo0 (1HS)
Location

Work

Description
2y

(n(w)

eve hanege
PrevioS laver iit appoved e

Enciotures 1evel Sheel

tee enafty lel

inspected and reconHende or Srac Nt Raady


Apreva
betoe t fute apova
De the Nemedie woks as slalee

Remedia wakS FeQue 8s Deto

lound
AUTNORTY ENGiNE ER
Name of work: 28S 34
(Revasa Vil age Construct0i0onof ofNH-4-lane
km 818. 2) as NH-29
apart Bypass
of Bypassconnecting
to VaranasiNH-29
(Phase-ll, Package-2)Village
(near Sandaha 11.170 of NH-29) with NH-2
fromkm.Design chainage km 30.600 to
km
57.320=26.720km (Total Length 27.270km including interchange loop at NH-2) in the State of Uttar Pradesh under
GAMMON
NHDP Phase-Vllon EPC mode.
GMN-0104-QAC-F100-00
CLIENT
NATIONAL HIGHWAY AUTHORITY OF INDIA
AUTHORITY ENGINEER L.N. MALVIYA INFRA PVT. LTD
EPC CONTRACTOR GAMMON ENGINEERS AND
CONTRACTORS PRIVATE LIMITED
REPLACEMENT METHOD
FIELD COMPACTION TEST BY SAND Part-28)
AS PER ((S: 2720
Chainage:Form :.!+4.So......3.2.1.9V......3 Date of Testing 1/4/2
MDD (gm/cc): 370
Type of Work Pasclet 24 th OMC(%):
Layer No.: Specified % of MDD :90% /95% /97% / 98%
Source of Material: N7C
CALIBRATION OF SAND
W2
IMean weight of sand of cone of pouringcylinder (gm)
V
volume of calibrating container (cc) 3114
Weight of Sand + Cylinder before pouring (gm) Wi

Weight of Sand + Cylinder after pouring in the calibrating cintainer (gm) W3 q488
Weight of Sand + calibrating container (gm)=Wi-WaW3
Wa337
Bulk Density of sand (gm/cc)=WaN BDA|340
FIELD COMPLECTION
Description 2 3 4 6

Spot Chainage of Test (Random)


Distance from edge (M) 32
Weight of wet material from hole (gm)Ww ssor 4959S349sS38SILL SS)e
Weight of sand + Cyt. before pouring (gm)Wi
Weight of sand + Cyt. after pouring (gm)Ws |88"9 4GoG9239W3 a44I0SI
Weight of sand in hole (gm) We=W1-W2-Ws
Solb 42 19 se4712|4399424
"olume of pit/hole (gm)V1= W/BDA
3609303s72oJ33963Y343
Density of wet Soil (gm/cc) BDB = WwWi
6o·63462|)634||6)|66
Corrected M.C. by RMM, + % FMC Iq- 94)2:24|21772: 969
Field Dry Density, (gm/cc) FDD =(100xBDB)(100+FMC) | 34o|34||37||34233I |:3y
Relative compaction (%) = FDD100/MDD 97-9497-89 97-7 47. 9347:12 4 9
Mean Density (gm/cc)
Standard Deviation (gm/cc)
Note: If considerable variations are observed between individual density result then the nos. of test are increased and acceptance
criteria is subject
to the condition that the Mean density is not less then the specified density plus t 1.65(1.65/ (No. of Samples ") times the
standard deviation.
Remark: YES /No. confirms to MORTH Rev 2015specifications.

EPC CONTRACTOR A.E.


Name of work:
NHAL
(Revasa Village Construction
km 818.00 of ofNH-2)
4-laneas NH-29
apart Bypass
of Bypassconnecting
to VaranasiNH-29
(Phase-H, Package-2)Village
(near Sandaha from km.Design of NH-29)
chainage
11.170 with NH-2
km 30.600 to
km 57.320=26.720km (Total Length 27.270km including interchange loop at NH-2) in the State of Uttar Pradesh under
GAMMON
NHDP Phase-Vill on EPC mode. GMN-0104-0AC-F100-00

CLIENT
NATIONAL HIGHWAY AUTHORITY OF INDIA
AUTHORITY ENGINEER L.N. MALVIYA INFRAPVT. LTD
EPC CONTRACTOR PRIVATE LIMITED
GAMMON ENGINEERS AND CONTRACTORS
REPLACEMENT METHOD
FIELD COMPACTION TEST BY SAND
2720 Part-28)
AS PER (IS:
t.9.S....o...32.t.CN. Date of Testing: D/9/22
Chainage :Form :....
MDD
(gm/cc): 370
Type of Work : Paca OMC(%): 21:6o
Layer No.: Specified % of MDD :90% / 95% / 97% I 98%
Source of Material: NIP
CALIBRATION OF SAND
W2
Mean weight of sand of cone of pouring cylinder (gm)
volume of calibrating container (cc)
V 3|4
Wi
Weight of Sand + Cylinder before pouring (gm)
cintainer (gm)
Weight of Sand + Cylinder after pouring in the calibrating
Weight of Sand + calibrating container (gm)=Wi-W2Ws Wa4337
Bulk Density of sand (gm/cc)=WaN BDA|346
FIELD COMPLECTION
1 2 3 4 5
Description
Spot Chainage of Test (Random)
Distance from edge (M)
3 2
Weight of wet material from hole (gm)Ww
Weight of sand + Cyt. before pouring (gm)Wi
Weight of sand + Cyt. after pouring (gm)W3 q43 84703238 |SO
Weight of sand in hole (gm) W8W1-W2-W3 |4682 GoSS48|4875
olume of pit/hole (gm)V1= Ws/BDA 3)68 3 44333So7
Density of wet Soil (gm/cc) BDB = Ww/Wi 1-607:626|614
Corrected M.C. by RMM, +% FMC 19: 472072l302081
Field Dry Density.(gm/cc) FDD = (100xBDB)(100+FMC) 339 3371:34 340
Relative compaction (%) =FDD*100/MDD 97:7547 6|78S1929
Mean Density (gm/cc)
Standard Deviation (gm/cc)
Note: If considerable variations are observed between individual density result then the nos. of test are increased and acceptance criteria is subje
to the condition that the Mean density is not less then the specified density plus t 1.65 -{ 1.65/ (No. of Samples )") times the standard deviation.
Remark: YES /No. confirms to MORTH Rev 2015 specifications.