Operating Instructions
Drum Sieve
TSCY
Warning
● Please carefully read the contents of this instruction before operation, maintenance
and inspection of the machine.
● Please keep this instruction properly in order to be available at any time during
operation and maintenance of the machine.
Table of Contents
I. Overview…………………………………………………………… 1
I. Overview
1. Application Scope
TSCY drum sieve is applicable for pre-separating of the raw materials to remove the large impurities
such as straw, wheat straw, hemp rope, plastic film sheet, brick, stone, corn leaf, corn cob and so on, and
protect the subsequent machine and conveying device from failure and damage.
2. Performance Characteristics
The machine has the characteristics of high output capacity, low power consumption, simple
structure, small occupied area, easy installation, less maintenance and convenient replacement of sieve
tube. According to the material property, it can achieve the requirement on yield and separation effect
with suitable sieve mesh.
III. Main Technical Specifications
Model
No. TSCY63 TSCY80 TSCY100 TSCY125 TSCY150 TSCY180
Items
Whea 15-20 20-30 30-40 50-60 70-100 100-150
Output Capacity t
1
(t/h) Rice 6-10 10-15 15-20 25-40 40-60 50-80
8 Machine weight (kg) 290 40b vc0 910 1200 1300 1600
Note: 1. The sieve mesh shall be selected according to the specific conditions and separating requirements of the
original grain from the following specifications, and the yield will vary with the sieve mesh.
2. Specifications for square sieve mesh (mm) 11×11, 13×13, 14×14, 16×16, 18×18, 20×20 and 25×25
—1—
ZHENGDA Ji Xie operating Instructions
Drum Sieve
3.1 General structure and installation dimension of cylinder initial separating sieve
1. Motor 2. Screen 3. Screen Cylinder 4. Feed Pipe 5. Air Inlet 6. Feed Port
7. Cleaning Brush
—2—
ZHENGDA Ji Xie operating Instructions
Discharge
Outlet R 4-Anchor Bolt Hole Ø
Feed Inlet N Exhaust Inlet M
mm
Model A B C D E F G H I J K
TSCY63 1650 1110 460 300 153 542 95 1260 790 750 150
TSCY80 2030 1310 640 360 170 642 110 1560 975 965 175
TSCY100 2152 1432 640 590 170 648 250 1715 1175 1060 150
mm
Model A B C D E F G H I J K
TSCY63 1650 1110 460 300 153 542 95 1260 790 750 150
TSCY80 2030 1310 640 360 170 642 110 1560 975 965 175
TSCY100 2152 1432 640 590 170 648 250 1715 1175 1060 150
—3—
ZHENGDA Ji Xie operating Instructions
Discharge
4-Anchor Bolt Hole Ø Outlet R
Feed Inlet N Exhaust Inlet M
mm
Model A B C D E F G H I J K
TSCY63 1650 1110 460 300 153 542 95 1260 790 750 150
TSCY80 2030 1310 640 360 170 642 110 1560 975 965 175
TSCY100 2152 1432 640 590 170 648 250 1715 1175 1060 150
mm
Model M N O P R S Ø
—4—
ZHENGDA Ji Xie operating Instructions
1. Main structure
The main structure of the drum sieve consists of cylindrical worm speed reducer,
chain cover, frame, screen cylinder, feeding hopper, operation door, cleaning brush, motor
and so on.
2. Working principle
When working, the raw material flows from the inlet through the feeding hopper to
the inside of the screen drum, and when the screen drum rotates, the sieve throughs flow
out from the outlet of the grain hopper, but the large impurity passing through the screen
mesh is guided to the outlet of the impurity discharging hopper below the inlet with the
guide bolt on the inner wall of the screen drum under rolling action. The guide screw not
only helps to discharge the large impurity, but also can prevent the object from flowing
along with the large impurity, thus achieving the further separation effect. The cleaning
brush is used for cleaning the screen drum and preventing the screen holes from being
blocked. The air inlet can be connected with the air suction system to prevent dust from
flying.
Before installation, the machine shall be thoroughly checked, and the output shaft of
the reducer shall be ensured to be parallel to the driving main shaft, and the center of
two driving chain wheels is correct and the tightness of the chain is moderate. The
installation method of this machine\the position of anchor bolt hole, the relative position
of grain and large impurities are as shown in the diagram. The distance between the a
—5—
ZHENGDA Ji Xie operating Instructions
access door of the sieve drum and the wall shall not be less than the length of the sieve
drum + 600mm.
1. The operator shall know the structure and the performance of the machine;
2. Trial running without load is needed before use, the rotating direction of the sieve
drum shall be consistent with the direction indicating board, and the connecting parts
shall be checked, and looseness, blockage, collision and friction as well as abnormal noise
3. Feed materials after the machine has kept normal running, the feeding flow shall be
4. Stop feeding when the machine is not working, the machine shall not be stopped
VIII. Maintenance
1. The sieve drum shall rotate flexibly and shall not move in the axial direction;
2. The cylindrical worm reducer shall be lubricated with oil, and the oil level shall be kept
to immerse the worm. It is recommended to use gear oil, HL-20 in winter and HL-30 in
summer, and the oil shall be replaced for the first time after working for half a month,
3. The bearing shall be cleaned once after the machine has kept continuously working
half to one year, and the lubricating oil shall be replaced. It is strictly prohibited to mix
4. Immediately replace the screen drum, feeding hopper and cleaning brush when they
1 Sieve drum 1
2 Guide screw 1
3 Cleaning brush 1
4 Bearing 2
5 Chain 1
—6—
Ya n g z h o u Z h e n g d a M a n u f a c t u r i n g C o . , Lt d .
Address: Longchuan Industrial Park, Jiangdu City
Postal Code: 225200
Website: www.zdlj.com E-mail: yzzdlj@163.com
Tel: 0514-86510999 86510199
Fax: 0514-86510399