Power - System Mitra Maintenance
Power - System Mitra Maintenance
Maintenance
Background
SoW 2022 2023 - Then
Sewa New site & Colo
Space Tower Space Tower & Power DC
TBG
Tower, Environment, Tower, Environment, Power AC,
Maintenance by TBG
Power AC Power DC
Business Proses
- Foundation Civil
- Cabinet Panel - Site Controller - Equipment
- Mechanical
- Rectifier Power - Commissioning Installation
Electrical Supply - Integration to - Equipment
- PLN Connection - Battery Back Up
Server TBG Connection
Mitra : CME Mitra : DC Power Mitra : NMS Power Mitra : Mitra Cluster
3
Material & Dimensioning
R = Responsible
A = Accountable/Approver
C = Consulted
I = Informed
5 Rectifier performance report, battery test performance report, maintenance & spare part R A, C
Corrective – Add PO
Harus di Install pada saat tenant sudah ready
Cable, protection cable, tray which needed to connect from rectifier/DC power system MS to user cabinet
1 R A, C, I Based on request ( Material + Service )
( 14 m )
2 Cable alarm system (dry contact) and or cable data communication which need to connect to TBG ( 7 m ) R A, C, I Based on request ( Material + Service )
Corrective – Add PO
3 Upgrade/add battery R A, C
SLA
5 6 7
8
Maintenance Pengecekan ACPDB
Pengecekan dan Pengukuran Power AC Cek dan pengukuran Rectifier dan battere backup
PENGUKURAN BATTERY
Per-Bank Per-blok
DC POWER SYSTEM
OPERATOR XL
BATTERY
RECTIFIER
Layout CME