Professional Documents
Culture Documents
2023-03-31 INDORE DEPOT LAYOUT - Time & Security office-TIME&SEC
2023-03-31 INDORE DEPOT LAYOUT - Time & Security office-TIME&SEC
SUBJECT TO COPYRIGHT. IT MUST NOT BE DISCLOSED, LOANED, COPIED OR USED FOR MANUFACTURING, TENDERING OR FOR ANY OTHER PURPOSE WITHOUT WRITTEN PERMISSION OF MPMRCL
8.23
92
1.35
1.41
0.96
1.21
1.16
Y=
X = 2514850.9062
1.13
581367.2179
11 2.07
MH
0.12
3.91
0.92 0.17
10
X = = 2514844.3532
Y
581374.8578
3.4
7.83
9 TENTAT
ALTERN IVE
8
X = 2514743.667
RSS
Y=
ATE
581353.2893
LOCATIO
7 N
Depot
6
54
Boundary
5
10.06
36
4
X=
Y=
581440.4133
2514813.4656
0.56
3 0.62
0.62
2
X = 2514817.632
Y=
12.1521.35
3.91
4.55
581464.3703
0.86
1.69
1
1.81
1.84
7.43
2.03
2.62
7
X = 2514838.092
Y=
7.0M
WIDE
ROAD
3.5
581488.8223
1900.0
0.31
Depot
0.92
0.59
1.12
ROAD 7m
1.96
0.09
11 2
0.37
0.95
0.22
2 3 4 5
5 6
1.43
885
6 77 8
X = 2514936.0714
Depot
1.54
9 10
1800.0
10 11
11 12
9
12 13
Y=
13 14
1.86
I 15 16
Boundary
16 17
17 18
Boundary
1
18 19 SL = 362.581
2
F4 20
12.74
F4 21 22
4
F7 22 23
581559.7266
1.69
F7 23 24
7
24 25 m
21 F7
8
F4 F4 26
9
F7
10
11
F7
12
2.47
TRACK C/L F7
13
F4
14
F6 F4 F7
15
F7
16
17
F7
18
F4
19
TRACK C/L F4 F7
20
3.46
PLF3 PLF4 F7
21 F4
6.36
PLF1 F7
22
23
20 PLF1 TRACK C/L I
24
4.37
PLF1 F4
25
PLF1 PLF1TRACK F7 F7
26
C/LPLF1 PLF1 F4 F4
7.1
F6 PLF1 PLF1 PLF1 PLF1TRACK C/LPLF1 TRACK C/L 4.57
5.79
PLF1 PLF1 PLF1TRACK C/L PLF1
19 TRACK C/L
PLF1 PLF1 PLF1
X = = 2514644.3793
PLF1
Y
PLF1 PLF1
581457.4403
F6 PLF1TRACK C/LPLF3
1700.0
TRACK C/L
Y=
X = 2514648.2226
PLF3 PLF4 PLF1
581461.433
PLF1 TRACK C/L
0.99
PLF1 PLF1
3.5
PLF1TRACK
Y=
X=
C/LPLF1 PLF1
2514656.9985
581470.5499
H PLF1 PLF1 PLF1
0.87
PLF1TRACK TRACK C/L
1
C/LPLF1
2
PLF1
3
F1 F8 F2 PLF1
5
PLF1TRACK C/L PLF1
10.04
14.23
F2
6
PLF1
10.24
F2
7
PLF1
18 F8
8
PLF1
RADIUS
F8
9
TRACK F2 F2 PLF1 PLF1
10
11
C/L F2 PLF1
12
PLF1TRACK
13
F6 F8 F8 C/LPLF3
14
F2
15
16
700M
3.5
F2 F2
17
11.77
PLF3
18
PLF4 PLF1 F8 F8
19
PLF1 F2
20
17 PLF1 F2 F2
21
22
PLF1
23
PLF1 TRACK C/LPLF1 F8 H
24
PLF1 F8 F2
25
17.41
PLF1 F2
1.2M
26
F6 PLF1 PLF1 F8
PLF1TRACK PLF1 PLF1 F1
HIGH
13.01
C/L PLF1 PLF1TRACK C/LPLF1 PLF1 FENCING
16
Depot
PLF1 PLF1
TRACK C/L PLF1
OPERATIONFOR GOA4
1600.0
PLF1 PLF1 PLF1TRACK C/LPLF3
RADIUS 7M Boundary
0.63
F6
14.46
PLF3 TRACK C/L
PLF4 PLF1 PLF1 TRACK C/L TRL = 35.000
15.97
PLF1 PLF1 PLF1TRACK C/LPLF1
REVISED
m
16.68
0.38
PLF1 PLF1
G PLF1 PLF1 TRACK C/L
PLF1TRACK PLF1
2
PLF1
3
C/L PLF1
4
F1 F9 F10 PLF1 TRACK C/LPLF1
5
F10
7
PLF1 PLF1 R = 700.000 m
15 F10
8
PLF1
LENGTH
F9
9
F9
TRACK F10 PLF1
10
C/L F10 PLF1
11
F10 PLF1 PLF1TRACK L =32.439m
12
13
C/LPLF3
1500.0
F9
14
F6 F9 F10
15
F10
16
PLF3 F10
17
PLF4 F9 TRL = 35.000
18
19
PLF1 F9 F10
20
PLF1 PLF1 F10 m
21
TEST TRACK
14 PLF1 F10
22
PLF1 TRACK F9 G
23
24
C/LPLF1 F9 F10
25
PLF1 PLF1 F10
26
PLF1 PLF1 F9
F6 PLF1 TRACK C/LPLF1 F1
PLF1 PLF1 PLF1TRACK
C/LPLF1
5.65 13 PLF1
1400.0
TRACK C/L PLF1 PLF1 PLF1 PLF1 PLF1
920 M
F6 PLF1
TRACK C/LPLF3
PLF3 TRACK C/L
PLF4 PLF1 TRACK C/L
PLF1 PLF1 PLF1 PLF1 TRACK C/LPLF1 SL = 235.551 m
F PLF1 PLF1 PLF1 PLF1 PLF1 TRACK TRACK C/L
1
C/LPLF1
2
PLF1 PLF1
1300.0
3
4
F1 F11 F12 PLF1TRACK
5
F12 C/LPLF1
6
PLF1
12 F12
7
F11 PLF1
9
F11
TRACK C/L F12 PLF1 PLF1
10
F12 PLF1
11
F12 PLF1
12
F11 PLF1
TRACK C/LPLF3
13
F6 F11
14
15
F12 F12
16
ROADWIDE
F12
17
3.872 m R = 190.000 m
7.0M
PLF3 PLF4 F11
18
PLF1 F11
m SL =
19
PLF1 F12
20
21
11 PLF1 F12 F12
22
PLF1 PLF1TRACK F11 R = 135.000 L =26.960m
23
C/LPLF1 F11 F
24
PLF1 F12 TRL = 35.000 m
25
26
PLF1 PLF1 PLF1 F12 F11
F6 PLF1TRACK C/LPLF1 F1 m L =15.255m
PLF1 PLF1 PLF1TRACK C/LPLF1 PLF1 SL = 24.849
10 U.G.TANK CAR WASH
TRACK C/L PLF1 PLF1 PLF1 PLF1 PLF1
3.15
F6
PLF3 PLF4 PLF1
TRACK C/L
TRACK C/L
PLF1TRACK C/LPLF3
SL = 2.071 m
R = 185.000
m
ROOM,
L =15.047m
1300.0
PLF1 PLF1 R = 190.000 m
1.06 PLF1 PLF1TRACK
C/LPLF1 PLF1 PLF1 L =26.960m
2.99
E PLF1 PLF1 PLF1 TRACK C/L
1
TRACK C/LPLF1
2
PLF1
3
F1 F13 F14 PLF1
4
F14 PLF1TRACK C/LPLF1
6
F14 PLF1
7
PLF1
9
8
F13 F13 F14 PLF1
9
TRACK F14 PLF1
10
11
1.26 C/L PLF1 PLF1
1300.0
F14
12
0.81 PLF1TRACK
13
F13 C/LPLF3
14
F6 F13 F14 F14
15
F14
16
17
PLF3
18
PLF4 PLF1 F13
19
PLF1 F13 F14
20
PLF1 F14 F14
21
PLF1
22
23
8 PLF1TRACK C/LPLF1 F13 E
24
PLF1 F13 F14
25
PLF1 F14
26
PLF1 PLF1 F13
F6 PLF1 TRACK C/LPLF1 PLF1 F1
PLF1 PLF1 TRACK C/LPLF1
1300.0
PLF1 PLF1 PLF1
7 TRACK C/L PLF1 PLF1 PLF1 PLF1TRACK C/LPLF3 12
F6 PLF3 TRACK C/L 11
PLF4 PLF1 PLF1 TRACK C/L
10
9
PLF1 PLF1
8 7
6
PLF1TRACK C/LPLF1 PLF1
5
4
PLF1 PLF1
3
2
SHUNTING LINE
PLF1 TRACK C/L 1
D PLF1 TRACK C/LPLF1 PLF1 PLF1
1
PLF1 TRACK C/LPLF1 TRACK
1300.0
2
3
PLF1 PLF1
F1 F5
28800
5
F5 PLF1
6
F5 PLF1
7
PLF1
6 F5
8
PLF1
2950
F5 F5
9
F5 PLF1TRACK C/LPLF3
10
11
B
F5
12
TRACK C/L F5
13
311
F5 F5
14
F6 F5
15
SL = 9.000 m
F5
16
17
F5
18
F5
19
TRACK C/L F5 F5
1.2M
20
PLF3 PLF4 F5 R = 120.000 m
21
22
5 PLF1 F5
23
PLF1 TRACK C/L F5 D HIGH
24
PLF1 PLF1 F5
25
16250
PLF1TRACK F5 F5 L =17.442m
26
C/LPLF1 F5
FENCING
F6
PLF1 PLF1 PLF1 PLF1 PLF1TRACK C/LPLF1 PLF1 PLF1 PLF1TRACK C/L PLF1
TRACK C/L F1 PART-1
LAYOUT
COLUMN
OPERATIONFOR GOA4 R12000
36600
4 PLF1
PLAN
PLF1
ROAD
TRACK C/L PLF1 PLF1 PLF1 PLF1 PLF1TRACK
F6 C/LPLF3 PART-2
AA`
PLF3 PLF4 TRACK C/L COLUMN
PLF1
LAYOUT
PLF1
C1B C1
TRACK C/L
7m
PLF1 PLF1
PLAN 27 C1 C1B
C1
PLF1
31
C1
RAMP
TRACK C/LPLF1
C2 21 16 12
17
2500
23 8
PLF1
C1
(1:12) 16
PLF1
C2
C
35 4
PLF1 PLF1 PLF1TRACK TRACK C/L
7m
16
1
C/LPLF1
G
2
PLF1
3
F1 F3 PLF1 PLF1TRACK
5
C/LPLF1
C2
40
F3
6
F3 PLF1
7
PLF1
3 F3 F3
8
PLF1
C1B Y= 2515010.0524
56
F3
C2 C1B X= 581726.9537
TRACK
10
PLF1 PLF1
RAMP
C/L
44 20 X= 581860.3506
F3
11
F3 PLF1
12
PLF1TRACK
C1 22 Y= 2515315.1078
D
26
F3 F3
13
F3 C/LPLF3
14
F6 F3TRACK
15
16
C1
3500
48
C/L F3
17
ROAD
C2
C1
52 15
PLF3 PLF4 F3
18
C1
PLF1 F3 F3
19
PLF1
C2 C1 7
PC4
TRACK C/L F3
20
19 11
PLF1 F3
21
22
C1 F
7500
ADMIN
34 30
PLF1 F3
23
C
C2
62 39 3
PLF1TRACK C/LPLF1 F3
24
C2
14
PLF1 F3 F3
25
25 6
PLF1 F3
26
PLF1 F3
58
C2 C2
PLF1 PLF1
C1 18 C1 E
F6 TRACK
TRACK C/LPLF1 C/L F1
C1
C1
64 10
PLF1
C1
PLF1
C1B C2
17
PLF1TRACK
38
42
C2
29
C1 2
43
C/LPLF1 PLF1
C2
C7 33 C1
D
PLF1
2500
1
C4B C2 C7
TRACK C/L PLF1 PLF1 70
47
D3
SEPARATE DRG. ISSUED
PART-3 COLUMN
C/LPLF3
37a 41a 6001
C1
C2
C8
LAYOUT C8 C
46
F6 PLF3 PLF4 FOR GRID A & B TRACK C/L PLAN 51
C6
61 41
PLF1
63
6023 X= 581866.7290
TRACK C/L
74
PLF1
C1
D3
PLF1
C2 C8 C1 C1
51
57
PLF1TRACK C/LPLF1
C2 C1 17 C1
7500
15
X= 581871.1279
50
13 9
PLF1
6502 Y= 2515309.8290
1.5
5
PLF1
R12000
PLF1
69
C2
C2
C2
C1
FD2
24
PLF1 TRACK C/L
50
GREEN
D2
R12000
PLF1TRACK PLF1 SE[ARATE DRG. ISSUED
C6
C1B 56 28 4502
PC1
B
3500
PLF1
C2 32 D2
PC1
C/L
78
PLF1
C1 200*
220
D2
1
PLF1TRACK
FD1
AREA
2
C/LPLF1 PLF1
C1 36 A FD2
91
68
4
PLF1
6001
00
D3
D1
LIFT
1900x2500
5
PLF1
60
C2
52
6
PLF1
3000* 3500* 6500* 6500* X= 2515000.0298
Y= 581741.2993
00
D5
7
PLF1
C2 6500*
D3
8
PLF1 PLF1TRACK
C1A 45 6500* 4
1 2
6
10
C/LPLF3
3
6500* 14
3
11
C6
4000* 7
4
ROAD 7m
2
D5
12
82
2600* 8 D5 5990
13
C1 09 13
67
1
6 7
Pathway
14
C2
6500* 53
8
D5
2
15
16
73
9
17
C4 49
10
12
18
66
7.0M WIDE 11
19
C1A C2 6500*
21750
12 13
20
21
C3 5990
14
L 12
1
22
15
23
C C5
ROAD 16 B
C4 72
D1
OF 55 11
2
10
11
24
C4
17 18
PEDESTAL
3
12
25
86
6500* C3
19
77
4
13
26
59
20
D2
ENGINEER
5
14
5990
6 21
15
L PD1 C1 200* 54 10
230
22
16
17
C 65
86A
PD1
23 24
OF
7
18
C1A 6500*
PD1
25
PEDESTAL 14 10
8
19
9 26
20
C4
PD2
D 10
21
22
81
D2
PD2
11
23
88
PD1
76
1
PD2
12
24
3000*
11
2
PD2
C1 C9 A`
R6000
71 15
R12000
3
PD2
6001
13
L
4
PD2
14
C
3500* 16 C9
5
15
OF
GD1 D2
PD2
C4 17 C9
F1 16
PEDESTAL
6
PD2
C4 89
17
D1
11
7
PD2
C9
4502
F1 PD2
D1
8
581703.1262
85
80
LVL F2 PD2
2514872.2450
9
6500* 18 90
Driver Platform
85A
C1
F2
ING
10
F2
11
PD2
PD1 75 91
Y= X=
F2 PD2 CAR
F2 PD1
92 11
12
FD1
+563.15 91, TW
13
PD1
PD1
9
B
F2
87
B
14
F2 86
15
C4
6500*
19
F2
10
F
SIDING
16
6502
34
F2
84
C1
33
F2
17
2200
L
OF
F2
13
PEDESTAL
79
8
R4000
F2 RAMP
2300
2200
E
D4
2515058.6655
2000
F2
2700
PC1
BOX
D2
581790.6012
F1
2900 20
PC1
D
F1
JUNCTION
6500*
5000
AT-02
2100
Y=
C
6000
D5
7 5
X=
100
I/C-02
C4
D2
PANEL
1000
83
BR
6016
900
500
300
D5
TRACK (C/L)
Driver Platform
SWGR
5900
1000
BC
300
900
DCDB
KV
F
1000
21
AT-01
33
4
ACDB
1000
6000
1600
12300
X=
6500 6
7000
800
I/C-01
Y=
581719.2515
4200
BANK
1000
* X=
2514891.0815
581827.7696
Pathway
2700
D5
5500 Y= 2515135.7631
1900
1000
600
6002
E
BATTERY
1400
3300 A
1100
3.5M WIDE PATHWAY
BATTERY
2000 TRANSFORMER-1
D4
1600
CHARGER
8001700
DUCT-1
DUCT-2
2000
400
500
800
581721.1057
2514880.7742
800
1300 22
BUS
BUS
RS1
1900
MDB-3
3
RTU
X=
SD2 SD2 M
3600
X=
Y=
581800.7533
2100
1900
700
BUS
2515061.4529
+563.15
TRACK (C/L)
2300
Y=
BUS
DUCT-1
600 2700
8000
GREEN
10
DUCT-2
6700
2000
700
SG2
2100
1600
TRANSFORMER-2
MDB-2
1400
10700
1700
3000
400
2400
13500
3200
MDB-1
600
M
2000
1000
LT
10400 SG2 +563.6
AREA
1300
5100
MAIN
3000
PANEL
2
800
4200
D3
9100
1200
2515042.1881
D3
B
800
SG1
900
1600 900
1600
1600
581796.4958
4000
Y=
D3
X=
6000
2100
2100
36
SD2
TRACK (C/L)
8000
SG2
7.6
200
X= 581836.4232
D2
400
16800
WIDTH
Y= 2515128.1890
X=
TREAD
RISER
SD2
CAPACITOR-1CAPACITOR-2
Y=
581803.0629
SG2
1200
=
D2
2100
2515053.7934
1200
== 176.25
17
300
3200
800
3200 1800
FD2
16
5000
D3
PD1
1500
800
PD2
1200
AA
SD4 SD3
PD2
1000AMF-1
PANEL
RS1
1000
1000 AMF-2
1000
PD2
1700
1
SB
7300
800
D3
172
17169
2
1.5
around
2514844.8478
EMERGENCY
700
Y=
X= 2515064.9895
7500
166
16
163
3 PD2
W1SD2 X=
581812.2203
Y=581716.1145
4000
FD1
581857.4403
500
4000
W2 D2
5 PD2
1500 1700 W1
PD2
TRACK (C/L)
all Driver
D2
B
F2 PD2
X=
8001200
1000
2200
W1
SD1
D2
BA
B
167
36 F2 PD2
SD2
SET-1
6000 D2
7000
4500
161
R6000
F2
6300
37 38
2200
with openable Gate for Driver
BOREWELL 02
PD2
for
PANEL VENTILATION
D3
39 40 9 10
DG
KVA
1500
3200
D2
171
170
41 PD2
500
165
164
35
42 43 11 PD2
1800
6000
168
159
CF1 44 F2 12 PD2
DG
162
CF1 PD2
D1
45 13
fencing
W2
CF1 F2 PD2
6300
46 14
SET-2
CF2
KVA(SB)
47
F2 49 F2
Gate
48 15
D1
2500
50 16 PD1
1000
500DG
2900
6000 SD1
CF1
A'' 51 52
X=
Y=
CF1
53
F2 17
8000
581814.5780
2515057.3448
CF1
high
54
55 56 F2
F3 CF1 F1 C
4800
33 57 58
W1
F3
CF2 59
2300
6000 W1
34 CF1 60 F1 61
SD2
ROAD
62 F1
SD2
F2 CF1 63 64 F1
4500
73
F2
INSPECTION OFFICE CF1 65
1.2m openable
6000
A
71
69
F2 F2 CF1
A 1
900
2
B
67
F2 F2 F4 CF1
W1
LVL
3
F3 F2
6
66
TANK
CF1
2000 W1
74
F7 CF1
FUEL
7
72
70
F2 F2
with
7500
+563.15
68
F2
3500
Y=
X= 581866.0626
10 11 12 2515162.0492
7m
13 F2 F2 F2 F6
14 F2 F4
F4
15 16
1 2
581734.1010
F2 17 18
2514853.3804
3 4 5 A' 19 F2 F2
A'' R14500
F2
20 21 F2 F2 32 31
F1 F5
X=
22 23 30 29
F1 F1
Y=
67 24
25
26 F1 6000
68 11 12 13 27 28
29
F1
F1 F1
14 15 16 30 31
32
GREEN AREA 6 7 8 9
17 18 19 20 21 A
10 22 23
R8000 24 25 26 27 28 29 30 31 32
9.81
1.5M WIDE FOOTPATH 1.5M WIDE FOOTPATH
7.0M WIDE ROAD
1.5M WIDE FOOTPATH
7.0 M WIDE ROAD
ROAD 7m ROAD 7m
1.5M WIDE FOOTPATH
MH
4
5
7
8
1
2
3
4
5
6
3000 3550 3550 3000
23
NEW PD AREA
21
22
24
R20000
F1 F1 F1 F1
800
1400
2200700
900
FUEL TANK
D D
2400
1700
1200
2000
TRANSFORMER-2
1600 PANEL
R20000
13 18
DG VENTILATION
4800
4000
12 17
14 19
15 20
2700
600
1000
1500
500 KVA(SB)
EMERGENCY
DG SET-2
F1 F1 F1 F1
PANEL
MH
2000 500
2000
6300
1600
10400
910010700
7300
1000
1000
2000 7000
1'
1'
3
1' 9
6' 6' 6' PANEL
1000
10.33
TRANSFORMER-1
MAIN LT 1500 AMF-2
SB
11
4300
16
1500
8000
2700
1000
500 KVA
8000 F3
AMF-1 DG SET-1
600
F3 F2 F2 F2 F2
16800
800
1200
1700
6300
1200 1000
B B B
CAPACITOR-1
2100
1
2
10 11
10
4500 5000 5000 4500
12300
5100
3600
2100
3600
4
1600
F3
5
13500
900
3
8
6000 F2 F2
6
F2 F2 6000
5900
CAPACITOR-2
200
F4 F4 F3
1300
F4 F4
400
6700
A A A
2100
HB
BUS DUCT-2
1600
3300
BUS DUCT-1 1000 2100
400 900
1
2100 6000 1700
1300
800
RTU
2300 2500 1200
1600
BUS DUCT-1
BUS DUCT-2
5500
10001000 10001000 1000 1000 800
MDB-2
1900
PD AREA 5.2 HECTARE
800
HB
2900
2700
AT-02
I/C-02
BR
BC
AT-01
I/C-01
1100
1900 500
3000
MDB-1
3000
33 KV SWGR PANEL CHARGER
MDB-3
1900
600
BATTERY 1300
BATTERY
700
6000
BANK
1400
2200
2300
2200
500
300
DCDB ACDB 400
1900
3600 700
1700
JUNCTION BOX
100
900 900 800
300
VEHICULAR RAMP (1:20)
0.2605
HB
HB
13.02
14.58
14.25
R20000
R20000
13.98
14.04
14.11
TO DEPOT FOB FROM
14.04
13.85
14.09
14.29
13.79
14.2
13.74
13.88
14.04
14.02
FOB STATION
13.63
TRL = 20.000 m
R = 500.000 m
TRL = 20.000 m
SL = 105.663 m
L =26.570m TRL = 20.000 m
R = 350.000 m
500.0500.0
SL = 50.139 m
15+500
600.0
L =21.370m TRL = 20.000
15+400
SL = 91.365 m
15+300
Isolation
TRL
TRL== 15.000
20.000 mm R = 300.000 m
15+200
TRL = 20.000 m
400.0
R = 345.500 mm
15+100
L =27.383m TRL
15+600
TRL = 20.000 m R = 600.000 m = 15.000
15+000
L =20.820m TRL = 20.000 m
SL = 678.893 m
14+900
SL = 180.007 m L =20.597m m
300.0
200.0
100.0
m
SL = 116.857
TL=30m R= 8 00 .0
400.0
SL = 11.445 m
L = 119 .7 9 6
SL=618.761
14+800
365.4
SL = 12.829 m
TL=50m
-0.0
CH.14+932
CH.4+551.00 (DEPOT LINE-2)
0.00%
CH 15+189.20 GANDHI
R125.0000
NAGAR/NANOD
14+700
N
TL=50m
4 5 6 7 8 ETU
1 3000 2 3550 3 4
3550 5 3000 6
23
22
21
24
R2
00
00
F1 F1 F1 F1
D D NOTE:
13 18
14 19
DRAWING FOR COORDINATES OF OTHER
0
12 17
4000
BUILDINGS/SHEDS.
2. COORDINATES TO BE VERIFIED AT SITE.
15 2
F1 F1 F1 F1
11
4300
16
8000
8000 F3
F3 F2 F2 F2 F2
B B B
Reference Documents
10
1 2 10 11
4500 5000 5000 4500
3600
3600
4
5
7
F3
1
6
2
9
3
8
6000
F2 F2 F2 F2 6000 F3 1300
F4 F4 F4 F4
A A A A
1
Reference Drawings
· IND-L000-RTA-STR-DRG-TNS-COL-0001 (R0-D
EMPLOYER :
DESIGNATION NAME
REVISIONS DETAILED DESIGN CONSULTANT (DDC) : CERTIFICATE GENERAL CONSULTANTS EMPLOYER EMPLOYER : PROJECT :
CONSTRUCTION OF ROLLING STOCK DEPOT CUM WORKSHOP AT
IT IS CERTIFIED THAT DETAILED DESIGN PREPARED IS COMPLIED WITH THE TERM & CONDITION
OF CONTRACT AND WE OWN FULL RESPONSIBILITY FOR DESIGN, ADEQUACY & MEETING
OTHER DEPARTMENT CLEARANCE
REVIEWED
MADHYA PRADESH GANDHINAGAR FOR INDORE METRO RAIL PROJECT
FUNCTIONAL, PERFORMANCE AND OPERATIONAL REQUIREMENTS INCLUDING CONSIDERATION CHECKED NAME SIGN
FOR INTERFACE REQUIREMENT OF OTHER CONCERNED DISIGNER/CONTRACTOR AND
COMPLIANCE TO STANDARDS, NORMS, SAFETY AND STATUTORY RULES & REGULATIONS. ARCHITECTURAL
CIVIL
AND
DY. PD./PD GM/CIVIL METRO RAIL CORP. (PACKAGE : IN-07)
STRUCTURAL
Detailed Design Consultant (DDC-JV LEAD) CIVIL & STRUCTURAL
LIMITED (MPMRCL) BUILDING NAME : TIME & SECURITY
RITES LTD. MEP
SIGN
SIGN
SIGNALING & TELECOM GENERAL CONSULTANTS : DRAWING TITLE : COORDINATES OF GRID CROSSINGS
POWER SUPPLY & TRACTION
REVISION DWG S
DATE TRACK
DRAWING NO. : IND- L-000- RTA- STR- DRG-TNS COR 0001
NAME SUBHADIP B. SUBHADIP B. P.S DUGGAL P.S DUGGAL ROLLING STOCK
NAME
SCALE : N.T.S. DATE : 31.03.23 R0
REV DATE BRIEF DESCRIPTION PREPARED BY CHECKED BY APPROVED BY ISSUED BY OTHERS DATE DB ENGINEERING & CONSULTING GMBH - GEODATA ENGINEERING S.P.A - LOUIS BERGER SAS
PRELIMINARY DWG (P), DEFINITIVE DWG (D), CONSTRUCTION DWG (C), AS BUILT DWG (B), SHOP DWG (S), MANUFACTURED DWG (M)