Invoice No.05 - (23-25) - 30-12-2019 - C.C
Invoice No.05 - (23-25) - 30-12-2019 - C.C
Invoice No.05 - (23-25) - 30-12-2019 - C.C
Package :
Contractor: Consultants for Contracting and Real Estate ASASS Monthly target due date
Contractual Terms
Item Amount
A Original Contract Value 159,220,991.61
B Variations Amount (To date) 166,563.60
F- Revised Contract Sum " A + B " = 159,387,555.21
A B=C-A C
Payment Details Previous Work Certified Current Amount Work Certified To-Date
E- Deductions:
Retention (x%) 5% (671,095.01) (268,029.13) (939,124.14)
Withholding Tax (z%) 1% (134,219.00) (53,605.83) (187,824.83)
Certifications:
ASASS
Contractor Technical office Planning Engineer
P.M: Mohamed Assem Manager: Mohamed Hussien Engineer: Waleed Ahmed
Signature: Signature: Signature:
1 of 59
نموذج مستخلص (مقاول)
نوع المستخلص جاري مستخلص رقم5:
نوعية األعمال Residential Buildings حجم األعمال المنفذ حتى 31/12/2019
: New Cairoموقع المشروع : I-city NCكود المشروع ) : Construction Of Plot ( No 23-25اسم المشروع
: DMAاالستشاري المشرف : MOUNTAIN VIEWالمالك
: DMCالمقاول
:بيانات تعاقدية
تعاقد /مرحلة :مرحلة رقم ()1 كود التعاقد
:مدة التعاقد (شهر) 159,220,992 :قيمة التعاقد (تقديرية)
:تاريخ بداية التعاقد 166,564 ) (+أوامر التغيير المعتمدة
:تاريخ النهاية التعاقدي ) (-الخصومات المعتمدة
المدة اإلضافية المعتمدة (يوم) 159,387,555 :قيمة التعاقد التقديرية المعدلة
6,259,951.61 ب -القيمة اإلجمالية لحجم األعمال التعاقدي (حالي) [رقم - 3أ] بيانات المستخلص
18,896,940.18 رقم ( )3القيمة التعاقدية اإلجمالية لحجم األعمال (شامل ضريبة المبيعات)
0.00
ملحوظة :تم استيفاء هذه المعلومة من المالك وعليه التحقق منها قبل الصرف
أربعة ماليين وتسع مائة ثالثة آالف وثمانمائة وواحد وستون جنية مصري وثالثة قروش المبلغ بالحروف
invoice certificate for contractor
Contractor Technical office Planning Engineer
invoice certificate
Contractor Technical office PCS Technical office Technical office
P.D: Tarek Abd Ellatif Manager: Ahmed Abd Elkarim Manager: Nermeen Afifi Section Manager: Ahmed Hanno Engineer: Mahmoud Samy
0.00 60% 1.14 10,614.04 0.00 100.84 100.84 Sep-19 طن حديد تسليح 1
0.00 60% 1.14 9,561.40 0.00 115.94 115.94 Oct-19 طن حديد تسليح 2
0.00 60% 1.14 9,210.53 0.00 78.22 78.22 Oct-19 طن حديد تسليح 3
126,397.50 60% 1.14 9,254.39 19.968 100.92 120.89 Nov-19 طن حديد تسليح 4
Executed Steel QTY. Bill Rate " Include Contract Base Diff Price
Invoice No. Cut Off Date Purchase Bill Dates Amount of Total Diff price
Tons VAT" Price L.E
(13,851.00) -
(13,851.00) -
(13,851.00) -
13,851.00
-
93,732.75 اإلجمالي
اعتماد المستخلص:
االستشارى المقاول:
مدير المشروع: مهندس االستشارى: مهندس المقاول:
االسم: االسم: االسم:
التوقيع: التوقيع: التوقيع:
التاريخ: التاريخ: التاريخ:
Page 6 of 59 662028403.xlsx
أوامر التغيير
نوع المستخلص جاري مستخلص رقم 05:
حجم األعمال المنفذ حتى 2019 / 12 / 31
نوعية األعمال Residential Buildings
:New Cairoموقع المشروع : I-city NCكود المشروع ) : Construction Of Plot ( No 23-25اسم المشروع
: DMA/ACEاالستشاري المشرف : MOUNTAIN VIEWالمالك
: DMCالمقاول
المرجع/ القيمة
**نسبة الصرف القيمة االجمالية نسبة اإلنجاز الكمية اإلجمالية الكمية الحالية الكمية السابقة الفئة الوحدة وصف البند م
مالحظات المستحق صرفة
4 mm thick. torch applied glass fiber - reinforced bituminous
LET-011
83,190.00 100% 83,190.00 50% 940.00 940.00 0.00 177.00 م² waterproofing membrane for retaining wall with cartonal 1
31/08/2019
sheet for protection.
83,373.60 100% 83,373.60 100% 2,084.34 2,084.34 0.00 40.00 م³ The price variance for excavation works in rock soil 2
0.00
0.00 0.00
0.00 0.00
0.00
0.00 0.00
0.00
166,563.60 166,563.60 أجمالي
.ملحوظة** نسبة الصرف تعبر عن قرار إداري ليس له عالقة بنسبة إنجاز األعمال
:اعتماد المستخلص
Plot 23-25
1 Podium Str 1 37,577,580.00 37,577,580.00 17,337,105.75 -23,961,434.25 4,860,970.05 6,120,732.49 10,981,702.54 1,044,900.00 16,408,938.00 437,400.00 -5,427,235.46 23%
2 Podium Arch 1 8,286,950.00 8,286,950.00 0.00 -8,286,950.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
3 Podium Elec 1 1,576,532.00 1,576,532.00 0.00 -1,665,782.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
4 Podium Fire 1 3,397,530.00 3,397,530.00 0.00 -3,397,530.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
5 Podium HVAC 1 54,996.00 54,996.00 0.00 -54,996.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
6 Podium Plum 1 2,321,772.00 2,321,772.00 0.00 -2,321,772.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0%
12 Strucutre Fill & Retaining wall 1 8,342,172.00 8,342,172.00 9,553,712.45 1,211,540.45 1,573,031.78 6,342,205.86 7,915,237.64 3,075,504.92 6,926,856.90 -1,970,289.17 988,380.74 82%
Total 159,220,991.61 26,890,818.20 -38,476,923.80 6,434,001.83 12,462,938.35 18,896,940.18 4,120,404.92 23,335,794.90 -1,532,889.17 -4,438,854.72 12%
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (1): Structure Work
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
Page 9 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (1): Structure Work
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
Page 10 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (1): Structure Work
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
Page 11 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (1): Structure Work
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
Page 12 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (1): Structure Work
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
Page 13 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (1): Structure Work
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
Page 14 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (1): Structure Work
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
Page 15 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 3 - CONCRETE
Section 03521 - Light Weight Concrete:
1 Supply and cast avg. 70 mm thick. well finished surface of light weight
concrete max 1200 kg/m3, finish surfaces shall be pitched to roof drains
at slopes as indicated on the drawings & detail #6,7/A-503.
The item shall include mixing, pouring, smooth formed finishing, and
all work required to meet the specifications, codes, and approved
manufacturer's instructions.
The item shall include but not limited to all materials, workmanship,
testing of proposed materials, equipment, tools, labors, profit, taxes, and
overheads. m2 1,875 129.00 241,875.00
Page 16 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 3 - CONCRETE
Section 03920 - Cementious Waterproofing:
The item shall include formwork, ready mix plan, pouring, smooth
formed finishing, concrete curing with potable water and all work
required to meet the specifications and codes.
The item shall include but not limited to all materials, workmanship,
testing of proposed materials, equipment, tools, labors, profit, taxes, and
overheads. m2 585 258.00 150,930.00
Page 17 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 4 - MASONRY
Section 04220 -Unit Masonry:
3 Supply and build solid cement block unit machine-made with density as
noted in the structure drawings, mass produced bricks comply to ES.
No. 1292, and ECP 204 - 2005 and high quality, uniform density and
rough texture. all units shall be identical to approved samples, sharp
edges, right angles, uniform dimensions, homogeneous surfaces and free
of chipping, cracks, and foreign materials.
The item shall include cement-sand mortar for bedding with cement
ratio not less than 300 - 350 kg/m3, scaffolding, utility opening, curing
with potable water, and all work required to meet the specifications and
codes.
The item shall include but not limited to all materials, samples,
shopdrawings, mortar, grouting, testing of proposed materials, labors,
tools, equipment, profit, taxes, and overheads.
3.01 200 mm thick. block wall for underground building. m3 7 1,510.00 10,570.00
3.02 100 mm thick. block wall for underground building. m2 125 196.00 24,500.00
Page 18 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 4 - MASONRY
Section 04225 -Autoclaved Aerated Concrete:
The item shall include cement-sand mortar for bedding with cement
ratio not less than 300 - 350 kg/m3, scaffolding, lintels, utility opening,
curing with potable water, and all work required to meet the
specifications and codes.
The item shall include but not limited to all materials, samples,
shopdrawings, mortar, grouting, testing of proposed materials, labors,
tools, equipment, profit, taxes, and overheads.
4.01 100 mm thick. block wall, type (01) m2 10250 156.00 1,599,000.00
4.02 200 mm thick. block wall, type (02). m3 1510 1,106.00 1,670,060.00
4.04 200 mm thick. block for façade shaded slab, as shown on detail #4.1/A-
503. m2 585 391.00 228,735.00
Page 19 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 4 - MASONRY
Section 04451 - Cut Stone Veneer:
5 Supply and install stone work of same color and obtained from the same
quarry, comply with the standards and specifications and as shown on
the drawings.
The item shall include but not limited to all materials, leveling,
shopdrawings, samples, mortar, grouting, testing of proposed materials,
tools, equipment, labors, profit, taxes and overheads.
5.01 Local stone cladding, with the required fixation accessories, angle,
polts, as shown on detail #01/A-504. m2 610 775.00 472,750.00
5.02 400 mm height, granite tiles for external skirting. L.M 205 388.00 79,540.00
Page 20 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 5 – METALS
Section 05700 – Ornamental Metal:
6 Supply and install 550 mm width and 40 mm Dia. steel step fixed to
wall for roof floor, as shown on the detail #03/ A-503.
The item shall include anchors, plates, grouting, adjusting, painting, all
required fixation accessories and all work required to meet the
specifications.
The item shall include but not limited to all materials, testing of
proposed materials, equipment, tools, labors, profit, taxes, and
overheads. No. 40 344.00 13,760.00
The item shall include, fixation, anchors, leveling, grouting, all required
fixation accessories and all work required to meet the specifications.
The item shall include but not limited to all materials, testing of
proposed materials, equipment, tools, labors, profit, taxes, and
overheads. No. 194 510.00 98,940.00
Page 21 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 5 - METALS
Section 05700 - Ornamental Metal:
8 Supply and install metal flower box unit, with electrostatic paint, fixed
to buildings.
The item shall include paint, primer, anchoring, flanges, metal chassis,
perforated sheet, posts, plates, grouting, fixation, accessories, finishing,
cleaning, and all work required to meet the drawing and specifications.
The item shall include but not limited to all materials, samples, testing
of proposed materials, equipment, tools, labors, profit, taxes, and
overheads. No. 44 1,912.00 84,128.00
9 Supply and install steel wire mesh cover with metal frame, as shown on
detail #01/A-503.
The item shall include but not limited to all materials, samples, testing
of proposed materials, equipment, tools, labors, profit, taxes, and
overheads.
9.01 Cover for duct opening void 700x700 mm. Item 2 3,188.00 6,376.00
9.02 Cover for duct opening void 600x700 mm . Item 2 2,550.00 5,100.00
9.03 Cover for duct opening void 600x400 mm . Item 2 2,295.00 4,590.00
Page 22 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 5 – METALS
Section 05700 – Ornamental Metal:
The item shall include anchors, plates, adjusting, subfram, painting, all
required fixation accessories and all work required to meet the
specifications.
The item shall include but not limited to all materials, testing of
proposed materials, equipment, tools, labors, profit, taxes, and
overheads.
Page 23 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 5 – METALS
Section 05810 – Expansion Joint:
11 Supply and install expansion joint for building finishes, as shown on the
drawing.
11.01 Expansion joint for building wall, as shown on detail #01/A-501. L.M 127 956.00 121,412.00
11.02 Expansion joint for building parapet, as shown on detail #02/A-501. L.M 51 956.00 48,756.00
11.03 Expansion joint for slabs, as shown on detail #05/A-501. L.M 2 956.00 1,912.00
Page 24 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
12 Supply and paint cement base waterproofing paint, with the required
protection, as shown on the drawing and according the manufactural
specification.
The item shall include but not limited to all materials, testing of
proposed materials, labors, tools, equipment, profit, taxes and
overheads.
12.01 Two coats of cement water proofing paint for roof. m2 1875 75.00 140,625.00
12.02 One coat of cement water proofing paint for terraces. m2 445 50.00 22,250.00
Page 25 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
The item shall include but not limited to all materials, testing of
proposed materials, labors, tools, equipment, profit, taxes and
overheads. m2 1875 138.00 258,750.00
Page 26 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
The item shall include frame, shop priming, and final field finishing,
handle, paint, hinges, all required hardware, fixation, and all work
required to meet the drawing and specifications.
The item shall include but not limited to all materials, samples, testing
of proposed materials, equipment, tools, labors, profit, taxes, and
overheads.
Page 27 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
15 Supply and install wooden doors with wood stain finish, as shown on
detail #08/A-501.
The item shall include wooden moulding detail, soft wood frame, door
leaf, soft wood rail, hardwood face veneer, MDF panels, hardwood
architrave, hinges, handels, hardware accessories, paint, primer and
finish painting, all required accessories, and all work required to meet
the drawings and specifications.
The item shall include but not limited to all materials, samples,
mock-up, testing of proposed materials, equipment, tools, labors, profit,
taxes, and overheads.
Page 28 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
The item shall include but not limited to all materials, shopdrawing,
testing of proposed, materials, samples, equipment, tools, labors, profit,
taxes, and overheads. L.M 842 3,198.00 2,692,716.00
Page 29 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
All aluminum sections shall present straight and sharply defined lines,
and shall be free from defects and imperfections that may impair their
strength.
All extruded bar and shapes shall be 6063-t5 alloy and temper according
to ASSTB221 of ultimate tensile strength not less than 1900
Kg/cm2.
minimum wall sections at any location for the main frame and panel
member shall be as follows:-
* For swing, sliding and tilted doors or windows: 2 mm thick.
* For supplementary sections: 1.6 mm thick.
The item shall include but not limited to all materials, samples,
mock-up, testing of proposed materials, equipment, tools, labors, profit,
taxes, and overheads.
Page 30 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
Page 31 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
Page 32 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
All aluminum sections shall present straight and sharply defined lines,
and shall be free from defects and imperfections that may impair their
strength.
All extruded bar and shapes shall be 6063-t5 alloy and temper according
to ASSTB221 of ultimate tensile strength not less than 1900
Kg/cm2.
minimum wall sections at any location for the main frame and panel
member shall be as follows:-
* For swing, sliding and tilted doors or windows: 2 mm thick.
* For supplementary sections: 1.6 mm thick.
The item shall include but not limited to all materials, samples,
mock-up, testing of proposed materials, equipment, tools, labors, profit,
taxes, and overheads.
Page 33 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
Page 34 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
Page 35 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09210 - Gypsum Plaster:
19 Supply and install gypsum - plaster in two-coat work (base and finish
coats), all the surfaces of masonry walls or concrete shall be wetted with
potable water, cleaned by wire brush, spatter dash, dots, bands, base
coat and finish coat will be applied in accordance with the specification,
as shown on the drawings.
The item shall include moudling, samples, metal lath, and any other
materials for proper finishing and completion the work.
The item shall include but not limited to all required materials,
shopdrawings, adjusting, cleaning, product data, testing of proposed
materials, labors, tools, equipment, profit, taxes and overheads.
Page 36 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09220 - Portland Cement Plaster:
20 Supply and apply O.P cement-sand plaster in two-coat work (base and
finish coats), with cement ratio not less than 300kg/m 3, all the surfaces
of masonry walls or concrete shall be wetted with potable water, cleaned
by wire brush, spatter dash, dots, bands, the finish coat which will be
smooth surface to receive painting or be rough surface to receive
gypsum cornice, base coat and finish coat will be applied in accordance
with the specification.
The item shall include the metal lath, and any other materials for proper
finishing and completion of the work.
The item shall include but not limited to all materials, substrate
preparation, adjusting, curing, testing of proposed materials, labors,
tools, equipment, taxes, profit and overheads.
20.02 Plaster with decorative lines for external walls, as shown on detail
#08/A-503. m2 525 121.00 63,525.00
20.05 Plaster for internal ceiling for entrance. m2 455 90.00 40,950.00
20.06 Plaster for internal ceiling for garbage room. m3 30 90.00 2,700.00
20.07 Plaster for internal ceiling for stair. m2 235 90.00 21,150.00
Page 37 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09260 - Gypsum Board System:
The item shall include but not limited to all materials, workmanship,
shopdrawings, samples, testing of proposed materials, equipment, tools,
labors, profit, taxes, and overheads.
21.01 12 mm thick. gypsum board suspended ceiling for entrance. m2 280 297.00 83,160.00
Page 38 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09300 - Ceramics Tiles:
22 Supply and install ceramic tiles conform to B.S No: 6431, as shown in
the drawings.
The item shall include bedding mortar, grouting, sand, special pieces,
accessories, and all work required to meet the drawings and
specifications.
The item shall include but not limited to all materials, samples,
shopdrawing, testing of proposed materials, equipment, tools, labors,
profit, taxes, and overheads.
22.01 Ceramic tiles for garbage room, set on 20 mm thick. cement mortar bed,
and 30 mm thick. sand layer. m2 30 180.00 5,400.00
Page 39 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09420 - Terrazzo:
The item shall include bedding mortar, grouting, sand, and all work
required to meet the drawings and specifications.
The item shall include but not limited to all materials, samples,
shopdrawing, testing of proposed materials, equipment, tools, labors,
profit, taxes, and overheads.
Page 40 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09600 - Stone Paving and Flooring:
24 Supply and install local granite work of same color and obtained from
the same quarry as shown on the drawings.
The item shall include cement mortar bed, sand, grouting, polishing,
leveling, and all required work to meet the specifications and codes.
The item shall include but not limited to all materials, workmanship,
samples, testing of proposed materials, equipment, tools, labors, profit,
taxes, and overheads.
24.01 20 mm thick. local grainte tiles polished flooring for entrance, set on 20
mm mortar bed, set on 60 mm sand layer. m2 750 762.00 571,500.00
24.03 Local granite for internal stair case of 40 mm thick., and 300 mm width
polished treads, and 20 mm thick. polished risers with necessary anti-
slip strips. L.M 683 504.00 344,232.00
24.04 Local granite for external steps of 40 mm thick., and 300 mm width
polished treads, and 20 mm thick. polished risers with necessary anti-
slip strips. L.M 52 504.00 26,208.00
24.05 20 mm thick., and 150 mm height local granite skirting for entrance. L.M 605 142.00 85,910.00
24.06 20 mm thick., and 150 mm height local granite skirting for landing. L.M 105 142.00 14,910.00
24.07 20 mm thick., and 150 mm height local granite aligned skirting for stair
case. L.M 300 142.00 42,600.00
Page 41 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09900 - Painting:
The item shall include clean the plastered surfaces, applying coats,
adjusting, finishing, curing, and any material for proper finishing and
completion of the work to meet the specifications.
The item shall include but not limited to all materials, testing of
proposed materials, equipment, tools, labors, profit, taxes, and
overheads.
25.01 Paint for external walls and parapets. m2 9,200 58.00 533,600.00
25.02 Paint for internal walls and parapets. m2 3,100 43.00 133,300.00
25.03 Paint for external ceiling with light color. m2 920 43.00 39,560.00
25.03 Paint for external ceiling with dark color. m2 765 58.00 44,370.00
Page 42 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
DIVISION 9 - FINISHES
Section 09900 - Painting:
26 Supply and paint internals paint, apply to plastered finish for internal
wall and ceiling, as shown on the drawing.
The item shall include clean the plastered surface, repair hair crack,
primary, base coat and the required basic and top coats, which will be
applied in accordance with the specification.
The item shall include but not limited to all material, surface
preparation, shopdrawings, testing of proposed material, labor, tools,
equipment, profit and overheads.
26.01 Anti bacterial epoxy Paint for internal ceiling for garbage room. m2 30 258.00 7,740.00
Page 43 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (2): Architecture Work
27 Supply and install and testing metal Garbage chute system, including
garbage trolley, with the required corrdination with electromechanic
work.
The shall include but not limited the following :
* Chute riser.
The item shall include paint, primer, anchoring, metal chute support,
flanges, clips, plates for fixation, grouting, accessories, door, handel,
locks, finishing, cleaning, and all work required to meet the
specifications, codes, and approved manufacturer's instructions.
The item shall include but not limited to all materials, workmanship,
testing of proposed materials, equipment, tools, labors, profit, taxes, and
overheads. Lum 4 387,600.00 1,550,400.00
Page 44 of 59
Mountain View - iCity
U-Shape Building
Bill of Quantities
B (5): Electrical Work
Supply, install, connect and test the following panel boards complete with
circuit breakers, bus bars cabinets, conductors relays, residual current
devices, indicator lamps and all necessary accessories and ancillary works
required in according to specifications and as shown on drawings & attached
schedules.
1.06 KWH meter box complete with C.B for apartments No. 98 1,530.00 149,940.00
2.02 (4X1X16)mm² CU/PVC from main risers to KWHM boxes. Mt 700 446.00 312,200.00
Page 45 of 59
Mountain View - iCity
U-Shape Building
Bill of Quantities
B (5): Electrical Work
3.01 Empty 4x32 mm H.G.R PVC conduits for power cables from
apartment KWHM to the aprtment panel. Mt 490 179.00 87,710.00
3.02 Embedded PVC 5x32 mm riser conduits from duplex apartment first level to
second level. Mt 32 223.00 7,136.00
Supply, install, connect & test electric outlets including PVC conduits
20mm at least, conduit fittings, PVC insulated 450/750V stranded copper
conductor wires, earthing back to panel board or to branch circuit and all
necessary accessories & ancillary works required for complete operative
system. For Embeded or concealed surface mounted conduits should be rigid
PVC but for Exposed mounted conduits should be galvanized steel.
4.01 Lighting outlet by 3X3mm2 copper conductor wires. No. 243 472.00 114,696.00
4.02 Lighting outlet (empty conduits) for façade lighting No. 166 293.00 48,638.00
4.03 Exhaust fan outlet by 3X3mm2 copper conductor wires. No. 2 829.00 1,658.00
Supply, install, connect and test electrical branch empty pvc conduits, works
including boxes and all necessary accessories and fittings to complete the
work as shown on the drawings and indicated in the technical specifications.
Page 46 of 59
Mountain View - iCity
U-Shape Building
Bill of Quantities
B (5): Electrical Work
6 LIGHTING SWITCHES
6.01 Push button with timer and pilot light. No 72 281.00 20,232.00
Supply, install, connect and test electric outlets including PVC conduits
25mm at least, conduit fittings, wiring, PVC 450/750 insulated stranded
copper conductor wires, earthing back to panel board or to branch circuit
and all necessary accessories and ancillary works required for complete
operative system. For Embeded or concealed surface mounted conduits
should be rigid PVC but for Exposed mounted conduits should be
galvanized steel.
7.01 Electric outlets by 3X4 mm2 copper conductor wires. No. 40 829.00 33,160.00
Page 47 of 59
Mountain View - iCity
U-Shape Building
Bill of Quantities
B (5): Electrical Work
Supply, install and test sockets & disconnect switches complete including
plaster rings, earthing, terminations, socket plate, cover, plugs all necessary
accessories and ancillary work according to specifications and as shown on
drawings.
8.03 63A-380V disconnect switch, weather proof for elevators . No. 4 3,372.00 13,488.00
9 LIGHTING FIXTURES
Supply, install, connect and test light fixtures including all lamps including
all mounting devices and brackets according to specifications and as shown
on drawings.
Page 48 of 59
Mountain View - iCity
U-Shape Building
Bill of Quantities
B (5): Electrical Work
10.01 Supply, install and test empty network including conduits, main risers,
cable trunks, pull boxs and ancillary works and materials required for
complete installation as shown on the drawings and specified in the
technical specifications. LS. 1 31,875.00 31,875.00
Supply, install, connect and test of audio intercom system and its network
including cables, outdoor units, indoor units and ancillary works and
materials required for complete installation as shown on the drawings and
specified in the technical specifications.
Page 49 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (3): Fire Protection Work
Genral Notes
1 Fire Cabinet
Page 50 of 59
Mountain View - iCity (N.C)
U-Shape Building
General Notes
2 Supplying & installing Roof Drain (RD) (Cast iron ,or Approved
Equal) with size
0.00
2.01 Ø 50mm (Cast Iron or Approved Equal) No. 2 2,632.00
Page 51 of 59
Mountain View - iCity (N.C)
U-Shape Building
Water Supply
Page 52 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (4): Plumbing Work
Total
110,880.00
80,850.00
488,400.00
121,441.00
5,264.00
806,835.00
Page 53 of 59
Mountain View - iCity (N.C)
U-Shape Building
Bill of Quantities
B (4): Plumbing Work
Total
806,835.00
31,584.00
5,118.00
1,558.00
1,430.00
3,432.00
20,900.00
57,450.00
82,620.00
1,010,927.00
Page 54 of 59
Mountain View - iCity (N.C)
Podium (23-25)
Bill of Quantities
Original structure BOQ Take Off Revised BOQ Amount Work done Progress review
Revised
Balance % progress of Balance amount
QS Executed quantity Approval Status Total % Overall Progress Earned value Revised EV
Ser. Item Description Unit Qty. Rate Total =Revised Total -Total executed quantity % payable Due Amount up to date
=Qs*Rate
The Contractor shall cut to the lines and grades shown on the
design drawings as per the requirements for foundation
installation and as directed by the Engineer. Excavation shall be
measured technically as the net specified areas as indicated on
the design drawings, times the vertical height between the levels
of excavation and according to the soil report.
The item shall include but not limited to tools, equipments, 13,766 13,766 13,766 Approved 302,856 (885,144.04) 95% 100% 95% 100% 100.00% 302,855.96 1188000 (885,144.04) 302,855.96
labors, profit, taxes & overheads.
m3 54000 22 1,188,000
2 Soil Removal & Transportation
The Contractor shall transport excavated soil to public dumps.
The amount of the transported soil should be equal to the
amount of excavated soil and not more.
The item shall include but not limited to tools, equipments, 13,766 13,766 13,766 Approved 289,090 (844,910.22) 95% 100% 95% 100% 100.00% 289,089.78 1134000 (844,910.22) 289,089.78
labors, profit, taxes & overheads.
m3 54000 21 1,134,000
3 Soil Backfill
The item shall include but not limited to tools, equipments, 16,500 16,500 16,500 429,000 312,000.00 3% 5% 3% 5% 100.00% 21,450.00 5850 15,600.00 21,450.00
labors, profit, taxes & overheads.
m3 4500 26 117,000
3.01 Soil Replacement
Furnishing and rendering 1.5 m thick replacement soil. The
Contractor shall follow all the recommendations mentioned in
the soil report.
DIVISION 3 - CONCRETE
Section 03300 - Cast in-Place Concrete:
GENERAL NOTES:
All electrical items (boxes - conduits) should be included in the
price
Each item shall include formwork, mechanical mixing and
pouring (ready mix plant and pump), smooth formed finishing,
concrete curing with potable water and all work required to
meet the specifications and all Egyptian codes.
Each item shall include but not limited to tools, equipments,
labors, profit, taxes & overheads.
Podium (23-25)
Bill of Quantities
Original structure BOQ Take Off Revised BOQ Amount Work done Progress review
Revised
Balance % progress of Balance amount
QS Executed quantity Approval Status Total % Overall Progress Earned value Revised EV
Ser. Item Description Unit Qty. Rate Total =Revised Total -Total executed quantity % payable Due Amount up to date
=Qs*Rate
Total Amount of : Sturcture Work of Podium (23-25) 37,577,580 17,337,106 (23,961,434) 10,981,703 16,408,938 (5,427,235) 10,981,703
Mountian View
Mountain View - iCity (N.C)
ICity - New Cairo
Podium (23-25)
P(19-21,23-25)
Bill of Quantities
Original structure BOQ Take Off Revised BOQ Amount Work done Progress review
Revised % progress of
Executed Approval Balance % Overall Balance amount
QS Status Total executed Earned value up to date Revised EV
Ser. Item Description Unit Qty. Rate Total quantity =Revised Total -Total Progress % payable Due Amount
=Qs*Rate quantity
PRE TOTAL PRE TOTAL PRE TOTAL Earned value balance
Plots 23-25
Ser. Item Description Unit Qty. Rate Total
DIVISION 3 - CONCRETE
Section 03 - Cast in-Place Concrete:
Supply and casting of plain concrete for the construction of the30cm thick plain concrete
footing to retaining wall as indicated onthedrawings and as directed by the Engineer, with
cement content of 250 Kg/m3. The required characteristic strength is 200 Kg/cm2. Using A
3 suitable type of cement according to soil report recommendation. The contractor has to m3 218.00 1,141.00 248,738.00 260.51 260.51 260.51 Approved 215,407.11 42,004.39 257,411.49
submit a full concrete mix design to be approved by the Engineer. 297,241.91 48,503.91 75% 86.60% 75% 87% 100% 257,411.49
The item shall include formwork, mechanical mixing and pouring
(ready mix plant and pump), smooth formed finishing, concrete curing with potable water
and all work required to meet the specifications and all Egyptian codes. The item shall
include but not limited to tools, equipment, labors, profit, taxes & overheads.
Supply and casting of reinforced concrete for the construction of the reinforced concrete
footings and ground beams and retaining wall (fair face) (Including the isolation layer as
applying two (2) coats cold applied waterproofing paint with bituminous base) as indicated
4 on the drawings and as directed by the Engineer, with cement content of 350 kg/m3. m3 717.00 3,950.00 2,832,150.00 736.87 736.87 736.87 Approved 2,910,636.50 78,486.50 63% 86.50% 63% 87% 100% 2,517,700.57 2,449,809.75 67,890.82 2,517,700.57
The required characteristic strength is 300 kg/cm2. Using a suitable type of cement
according to soil report recommendation. The contractor has to submit a full concrete mix
design to be approved by the Engineer
Page 57 of 59
Mountain View - I City - New Cairo
(23-25) CONSTRUCTION OF PLOT
SUMMARY Plot (23-25)
Qty. Offer Total Offer
Podium Str
1 37,577,580.00 37,577,580.00
Podium Arch
1 8,286,950.00 8,286,950.00
Podium Elec
1 1,576,532.00 1,576,532.00
Podium Fire
1 3,397,530.00 3,397,530.00
Podium HVAC
1 54,996.00 54,996.00
Podium Plum
1 2,321,772.00 2,321,772.00
Total 12,278,354.25