Workscope-1491-2023 - OB2027 Preservado de Aeronave

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CODIGO: FRM-AEC-030

WORKSCOPE-1491-2023 No. REVISION: Original


FECHA: 29/09/2018

Datos de la aeronave Datos del motor No.1 Datos del motor No. 2
Modelo: Bell 412EP TTSN: 14,314.20 Modelo: PT6T-3D Modelo: PT6T-3D
Serial No: 36254 Aterrizajes: 62,450 Serial No: CP-PS-TX0178 Serial No: CP-PS-TX0176

Matrícula: OB2027 TSN: 3,936.0 TSN: 4,137.9

LISTADO DE TAREAS OMAs


Grupo de Tareas Ítem RII HABILITADAS
Descricpion de tarea Referencia
1 Intermediate Storage- Preservation BHT-ALL-SPM, Par. 10-16 & 10-17. NO OMA 050
2 Intermediate Storage- Maintenance every 30 Days BHT-ALL-SPM, Par. 10-18 & 10-22 item 5. NO OMA 050
3 Long Term Storage- Preservation BHT-ALL-SPM, Par. 10-21. NO OMA 050
4 Part and sub - assemblies - Temporary storage (1 to 14 days) BHT-ALL-SPM, Par. 10-24. NO OMA 050
5 Part and sub - assemblies - Long term storage (15 to 180 days) BHT-ALL-SPM, Par. 10-25. NO OMA 050
6 Components - Temporary storage (1 to 180 days) BHT-ALL-SPM, Par. 10-26. NO OMA 050
7 Main rotor hub - Temporary storage (1 to 180 days) BHT-ALL-SPM, Par. 10-27. NO OMA 050
Inspecciones de 8 Swashplate - Temporary storage (1 to 180 days) BHT-ALL-SPM, Par. 10-28. NO OMA 050
Aeronave 9 Mast - Temporary storage (1 to 180 days) BHT-ALL-SPM, Par. 10-29. NO OMA 050
10 Freewheel - Temporary storage (1 to 180 days) BHT-ALL-SPM, Par. 10-30. NO OMA 050
11 Transmission - Temporary storage (1 to 180 days) BHT-ALL-SPM, Par. 10-31. NO OMA 050
12 Intermediate/Tail rotor Gearbox - Temporary storage (1 to 180 days) BHT-ALL-SPM, Par. 10-32. NO OMA 050
13 Components - Long term storage (180 to 365 days) BHT-ALL-SPM, Par. 10-33. NO OMA 050
14 Transmission - Long term storage (180 to 365 days) BHT-ALL-SPM, Par. 10-34. NO OMA 050
15 Intermediate/Tail rotor Gearbox - Long term storage (180 to 365 days) BHT-ALL-SPM, Par. 10-35. NO OMA 050
16 Despreservation and Activation - Aircraft BHT-ALL-SPM, Par. 10-20 & 10-26 item 3. NO OMA 050
17 Preserve engine 1 & 2 in period of 29-90 D EMM 72.00.00 - Servicing - 6.O.(1) & 6.O.(5)(c). NO OMA 050
18 Preserve engine 1 & 2 in period of 91-180 D EMM 72.00.00 - Servicing - 6.O.(1) & 6.O.(5)(d). NO OMA 050
EMM 72-00-00 Engine/Removal/Installation, Item 5.A.
Inspecciones 19 Installation in stand and preservation of Engine 1 & 2. NO OMA 050
EMM 72.00.00 Engine - Servicing, Item 6.O.(1) & 6.O.(5)(e)
de Motor EMM 72-00-00 Engine/Removal/Installation, Item 5.B.
20 Removal from stand and depreservation of Engine 1 & 2. NO OMA 050
EMM 72.00.00 Engine - Servicing, Item 6.O.(1) & 6.O.(3)(e)
Removal from stand and depreservation of Reduction Gearbox.
21 EMM 72.00.00 Engine - Servicing, item 6 sect. A, B, G, H, N, O(3)(e). NO OMA 050
Note: Preservation references are defined according to the type of container.
Instalación de
22 N/A N/A NO OMA 050
modificaciones
Inspecciones
23 N/A N/A NO OMA 050
de STCs
Engines 1 & 2 removal due to Overhaul.
24 ENGINE 1 OFF PN 3117400-01 SN CP-PS-TX0178. BHT-412-MM-9, Par. 71-14. NO OMA 050
ENGINE 2 OFF PN 3122952-01 SN CP-PS-TX0176.
Engines 1 & 2 installation due to return of Overhaul and aircraft activation.
25 ENGINE 1 ON PN 3117400-01 SN CP-PS-TX0178. BHT-412-MM-9, Par. 71-15. SI OMA 050
ENGINE 2 ON PN 3122952-01 SN CP-PS-TX0176.
Reduction gearbox installation due to aircraft activation.
26 BHT-412-MM-9, Par. 71-21. SI OMA 050
ON PN to be confirmed SN to be confirmed
MRH Assy removal due to storage
27 BHT-412-MM-6, Par. 62-10 NO OMA 050
OFF PN 412-010-100-217 SN A-1721
MRH Assy installation due to for activation
28 BHT-412-MM-6, Par. 62-13 SI OMA 050
ON PN 412-010-100-217 SN A-1721
Swashplate Assy removal due to storage
29 BHT-412-MM-6, Par. 62-16 NO OMA 050
OFF PN 412-010-402-113 SN RE-829
Swashplate Assy installation due to for activation
30 BHT-412-MM-6, Par. 62-20 SI OMA 050
ON PN 412-010-402-113 SN RE-829
Mast Assy removal due to storage
Reemplazo de 31 BHT-412-MM-6, Par. 63-22 NO OMA 050
OFF PN 412-040-366-129FM SN A-793
componentes Mast Assy removal installation due to for activation
32 BHT-412-MM-6, Par. 63-25 SI OMA 050
ON PN 412-040-366-129FM SN A-793
Main transmission removal due to storage
33 BHT-412-MM-6, Par. 63-30 NO OMA 050
OFF PN 412-040-004-143FM SN A-549
Main transmission installation due to for activation
34 BHT-412-MM-6, Par. 63-33 SI OMA 050
ON PN 412-040-004-143FM SN A-549
Intermediate gearbox removal due to storage
35 BHT-412-MM-7, Par. 65-27 NO OMA 050
OFF PN 412-040-006-101 SN A-403
Intermediate gearbox installation due to for activation
36 BHT-412-MM-7, Par. 65-32 SI OMA 050
ON PN 412-040-006-101 SN A-403
Tail rotor gearbox removal due to storage
37 BHT-412-MM-7, Par. 65-53 NO OMA 050
OFF PN 212-040-004-103 SN A-2548
Tail rotor gearbox installation due to for activation
38 BHT-412-MM-7, Par. 65-57 SI OMA 050
ON PN 212-040-004-103 SN A-2548
Main battery removal due to aircraft preservation.
39 Operator Manual 5-0324 - Section Installation A. NO OMA 050
OFF PN RG-380E/44 SN 70020167
Main battery installation due to aircraft for activation.
40 Operator Manual 5-0324 - Section Installation B. NO OMA 050
OFF PN RG-380E/44 SN to be confirmed
Documento
N/A
Mandatorios
Inspecciones
N/A N/A N/A NO OMA 050
Recomendadas
Servicios
N/A N/A N/A NO OMA 050
Especiales

27/01/2023 Workscope-1491-2023 Página 1 de 2


NOTA 1: Realizar una inspección visual final de toda la aeronave y en especial de los compartimientos y accesos utilizados durante los trabajos de mantenimiento para verificar que no se hayan
dejado objetos extraños (FOD) dentro de los mismos.

NOTA 2: Hacer un registro fotográfico completo de la ejecución de todos los trabajos programados en el presente workscope. Adjuntar dentro de la documentación del evento las fotografías como
evidencia del cumplimiento de cada una de las tareas programadas.

NOTA 3: En virtud a lo indicado al convenio de mantenimiento entre la OMA 050 y el Operador Servicios Aéreos de los Andes S.A.C AOC 051, Título TERCERO, 2do párrafo se reitera la supervisión
delegada al Certificador de Conformidad de Mantenimiento cuando no disponga de un representante de Aeronavegabilidad Continua, sin perjuicio de que deben ser enviados los documentos
solicitados por el personal de planificación y control de mantenimiento.

Las tareas del presente workscope deberá realizarse de acuerdo a la siguiente data técnica:
• El trabajo se realizará de acuerdo al Programa de Mantenimiento PM BELL 412 Rev. 03. del 28 Septiembre de 2022.
• Manual de Mantenimiento BHT-412-MM Rev. 33 de fecha 15 de Mayo del 2022.
• Pratt & Whitney Maintenance Manual Part Nro. 3040592, Revisión Nro. 43 de fecha 03 de octubre del 2022.
Se ha generado la OT MAXIMO No. 43587 asignada a la OMA 050 para los materiales y/o herramientas sean requeridos.

P/E
Gianmarco López Soto
Jefe Técnico
Servicios Aéreos de los Andes SAC

27/01/2023 Workscope-1491-2023 Página 2 de 2