The document contains specifications for multiple pipes in a water treatment system. It provides information on average and peak water flows in cubic meters per day, assumed pipe diameters in millimeters, calculated pipe areas in square meters, and water velocities in meters per second for each pipe segment. The pipes connect various stages of the treatment process from distribution chambers to storage tanks to mixing tanks and finally to the chlorine contact tank and drainage.
The document contains specifications for multiple pipes in a water treatment system. It provides information on average and peak water flows in cubic meters per day, assumed pipe diameters in millimeters, calculated pipe areas in square meters, and water velocities in meters per second for each pipe segment. The pipes connect various stages of the treatment process from distribution chambers to storage tanks to mixing tanks and finally to the chlorine contact tank and drainage.
The document contains specifications for multiple pipes in a water treatment system. It provides information on average and peak water flows in cubic meters per day, assumed pipe diameters in millimeters, calculated pipe areas in square meters, and water velocities in meters per second for each pipe segment. The pipes connect various stages of the treatment process from distribution chambers to storage tanks to mixing tanks and finally to the chlorine contact tank and drainage.
Q Average for each pst tank 6000 m3/day Peak factor 2.5 15000 m3/day Q Peak 0.17 m3/s Assume D 500 mm Aera of Pipe 0.196 m2 V 0.88 m/s
Pipe From 1 PST To Complete Mix Tanks
Q Average 6000 m3/day
Peak factor 2.5 15000 m3/day Q Peak 0.17 m3/s Assume D 500 mm Aera of Pipe 0.196 m2 V 0.88 m/s
Pipe From Complete Mix Tanks To 1 FST
Q Average /3 6000 m3/day
Peak factor 2.5 15000 m3/day Q Peak 0.17 m3/s 6000 m3/day Qr/3 0.07 m3/s Q Peak +Qr 0.24 m3/s Assume D 600 mm Aera of Pipe 0.283 m2 V 0.86 m/s Pipe from one FST to Chlorine Contact Tank Q Average 6000 m3/day Peak factor 2.5 15000 m3/day Q Peak 0.17 m3/s Assume D 500 mm Aera of Pipe 0.196 m2 V 0.88 m/s Collecting Pipe from two FSTs to Chlorine Contact Tank
Q Average 12000 m3/day
Peak factor 2.5 30000 m3/day Q Peak 0.35 m3/s Assume D 600 mm Aera of Pipe 0.283 m2 V 1.23 m/s Collecting Pipe from three FST to Chlorine Contact Tank Q Average 18000 m3/day Peak factor 2.5 45000 m3/day Q Peak 0.52 m3/s Assume D 700 mm Aera of Pipe 0.385 m2 V 1.35 m/s Pipe From Chlorine Contact Tank to Drainge Q Average 18000 m3/day Peak factor 1.5 27000 m3/day Q Peak 0.31 m3/s Assume D 600 mm Aera of Pipe 0.283 m2 V 1.11 m/s Pipe for Energency Q Average 18000 m3/day Peak factor 1.5 27000 m3/day Q Peak 0.31 m3/s Assume D 600 mm Aera of Pipe 0.283 m2 V 1.11 m/s