Preliminary works  Installation of the roof and

miscellaneous
 Preparation of plan
 Preparation of the Bill of Quantity / Architectural works (water/ electrical)
materials
 Installation of doors and windows
 Procurement of materials needed for
 Installation of bathroom sinks and
the preparation and the construction
water closets
 Submission of Requirements (work
permits / building permits etc.  Installation of ceiling
 Surveying of LOT w/ third parties  Installation of floor tiles
 Ground breaking  Installation of doors and windows
 Installation of water fixtures
Excavation works  PAINT WORKS
 Land scraping
 Site clearing and leveling
 Plotting or layout for the location of Final walkthrough
the footing of the structure
 Excavation of the footings Turn Over
 Soil poisoning

Structural Works

 Fabrication of the RSB footing


 Fabrication of the RSB Post and Tie
beams
 Fabrication of the form works for the
tie beams and post
 Installation of form works for tie
beams and post
 Concrete pouring for the tie beams
and footings
 Plotting and labeling of the location
for the Sanitary and clean water
outlet
 Fabrication of RSB roof beams
 CHB Layering
 Fabrication of the roof truss
 Installation of form works for roof
truss
 Installation of the roof trust
 Installation of sanitary and clean
water
 Concrete pouring for flooring
 Plotting of the electrical layout and
clean water