5 4 3 2 1 Client :

AUTOMATICRISINGBOLLARDJ2752K20(TYPE5)
Ministry of Housing, Utilities
& Urban Development
3100

D
C
3100 750 2350
750 2350 3 2T12

1000 2 T12@200
ELECTRICAL FLEXIBLE DRAINAGE PIPE Ø100 New Urban Communities
CONNECTION PVC Ø45 1 T12@200
Authority

460
460

400
CENTERLINE
OF PIT
CENTERLINE Main Consultant :
OF PIT
6 T12@200
SCHEDULE OF AUTOMATIC RISING BOLLARD J275 2K20 (TYPE 5)

400
D 3 T12@200 D

NO. BOLLARDS NUMB.


F.F.L OF PODIUM SLAB (M.)
F.G.L (M.) FILL DEPTH (M.)
TYPE OF BOLLARD
400 400 B113 323.253 1.553 J275 2K20

1475
2400
IMPACT DIRECTION B B 4 T12@200
01 321.7
2400
1475

2400
2 T12@200
B114 323.24 1.540 J275 2K20 Sub -Consultant :

1 T12@200

A A
CENTERLINE

CENTERLINE
OF PIT
NOTE:
Contractor :

465
OF PIT
6 T12@200
1.THEDETAILSOFAUTOMATICRISINGBOLLARDREFERTOMATERIALSUBMITTAL:
465

---NO.MAT-CSCEC-18-EL-LC-0031-04.
2.THELAYOUTOFAUTOMATICRISINGBOLLARDREFERTOTELECOMSYSTEMSHOPDRAWINGS.

CENTERLINE
OF PIT
3 2T12
DRAINAGE PIPE Ø100
ELECTRICAL FLEXIBLE 3.THEFINISHGROUNDLEVELANDTHELAYOUTOFTHEAUTOMATICRISINGBOLLARDFOUNDATION
CENTERLINE
OF PIT

CONNECTION PVC Ø45 5 T8@200


DRAINAGE PIT REFERTOLANDSCAPESHOPDRAWING. Project Name :
WASHED GRAVEL FILL DMAX Ø20~25
PLANVIEW
GEOTEXTILE
REINFORCEMENTDETAILS Central Business District
D
C

PLANVIEW
CONCRETEDIMENSION
(SCALE=12:5)
Of the
(SCALE=12:5)
New Administrative Capital
CBD EAST - PHASE 1
Key Plan :

NORTH

1 T12@200

1980

350

350
350

350
C CHANNEL STEEL C CHANNEL STEEL
PROVIDED BY SUPPLIER PROVIDED BY SUPPLIER ROAD PAVEMENT 80 1 T12@200

3100 1980
11 2T10 6 T12@200
80

250
100
ELECTRICAL FLEXIBLE
750 2350 100 11 2T10
3 2X4T12
NOTE:
3 2X2T12 3 2X2T12
CONNECTION PVC Ø45 350 400 400 1950 10 T8@200 10 T8@200 2400 01-THIS DRAWING SHALL BE READ IN CONJUNCTION

250
C
175 175 169 462 169 175 1775 F.G.L 6 T12@150 6 T12@200 1 T12@200
C WITH PROJECT SPECIFICATIONS AND OTHER
REFER TO LS. DWG.
100

2 T12@200
RELATED DRAWINGS.
SMOOTH BAR THREADED

500
M20 FOR 250MM 02-DEFORMED HIGH TENSILE STEEL

400
500

(PROVIDED BY SUPPLIER) 2 T12@200


REINFORCEMENT BARS B500DWR HAVING A
CENTERLINE OF PIT

CENTERLINE OF PIT

100
MINIMUM YIELD STRENGTH OF 500 MPa SHALL BE
380
1140

100

GEOTEXTILE DRAINAGE PIT


250

1440

1 T12@200 1 T12@200 USED AND CONFORMING TO EGYPTIAN CODES OF


1000 WASHED GRAVEL FILL DMAX Ø20~25 6 T12@200
PRACTICE AND PROJECT SPECS.
6 T12@200 REBAR SPACER
BITUMINOUS DAMPPROOFINGBLINDING DRAINAGE PIPE Ø100 8 5T10@200 6 T12@200
10 M20 L=1350

E E 1 T12@200
1000

2300 03-DO NOT SCALE FROM DRAWINGS, ALL

350

350
200
100

1.00% 13 T30 L=900 13 T30 L=900


8

DIMENSIONS & COORDINATES SHOULD BE READ OR

0
20
100100

E E COMPUTED.

2@

0
T1
76
7
100 1150 100 321.700
R8 100

2300

350

350
F.F.L 04-UNLESS OTHERWISE NOTED ON THE DRAWINGS,
DIMENSIONS ARE GIVEN IN MILLIMETERS AND
0

6 T12@200
LEVELS IN METERS.

500
SECTIOND-D
BLINDING REINFORCEEMNTDETAILS
PODIUM SLAB SECTIONA-A (SCALE=12:5) 05-CONCRETE GRADE
REINFORCEMENTDETAILS
SECTIONA-A (SCALE=12:5)
Element Concrete Grade
CONCRETEDIMENSIONDETAILS
(SCALE=12:5) Foundation C35
Blinding C15

06-CONCRETE COVER
Element Concrete Cover
Foundation 50mm
3 T12@200 600

100
8 5T10@200
3020

350

350
600 Reference Table

100

700
:

350

350
ROAD PAVEMENT
3 T12@200 9 2X5T20 Type No. Ref. No. Date
3020

700
100 3100 100

100
1 E18066-0105D-FD-18-F03-EY-5-SS-001-1 13/06/2019
CENTERLINE OF PIT 8 5T10@200
3 T12@200 Drawings 2 E18066-0105D-FD-18-F01-ES-1-OP-001-3 22/03/2020
175 1150 1775 600
F.G.L 6 T12@150 4 T12@200 6 T12@200
3 E18066-0105D-FD-18-F00-SC-0-GN-001-2 21/10/2019

100
REFER TO LS. DWG.
100

8 5T10@200 4 E18066-0105D-FD-18-F00-SC-0-GN-002-1 21/10/2019


600 5 DWG-CSCEC-18-F01-LS-HR-0001-03 16/03/2020
6 DWG-CSCEC-18-F01-LS-HR-0003-01 16/03/2020
500

B B 7 DWG-CSCEC-18-F01-LS-HR-0004-01 29/04/2020
8 5T10@200
GEOTEXTILE
600
100

DRAINAGE PIT
1440

100
1340

1000 WASHED GRAVEL FILL DMAX Ø20~25


6 T12@200 REBAR SPACER
BITUMINOUS DAMPPROOFING DRAINAGE PIPE Ø100 600

100

700
3 T12@200
BLINDING 1.00% 9 2X5T20
E E 200 CENTERLINE OF PIT

700
E E

100
20
2@
8 5T10@200
100

0
T1
600

76
321.700

7
100 1150 100 F.F.L

100
8 5T10@200

CENTERLINE
OF PIT
600

500
1 MAT-CSCEC-18-EL-LC-0031-04 17/04/2022
SECTIONE-E Documents
BLINDING PODIUM SLAB SECTIONB-B REINFORCEMENTDETAILS
REINFORCEMENTDETAILS (SCALE=12:5)
SECTIONB-B (SCALE=12:5)
CONCRETEDIMENSIONDETAILS
(SCALE=12:5)

800 Coordination Table:


400 400 Discipline Signature Date
4 T12@200
Architecture
930
350

350

Structure C.

400
10 T8@200 Structure S.
Electrical

800
Plumbing

400
350

350

11 2T10 L=700 HVAC


930 Other
465 1475 460 ROAD PAVEMENT 4 T12@200
Revision Table:
65 400 400 675 400 400 60 11 2T10 L=700

65169 462 170 675 169 462 17060 4 T12@200 TOP COLLAR REBAR ITION
F.G.L (SCALE=12:5)
REFER TO LS. DWG.
100

420
420
CENTERLINE OF PIT

CENTERLINE OF PIT

CENTERLINE OF PIT

CENTERLINE OF PIT

5 T8@200 5 T8@200
00 Approved 18 FEB 2023 WGJ
1140

A No. Description Date App.


1440

A 150 150
BITUMINOUS DAMPPROOFING 4 T12@200
Drawing Title :
8 5T10@200 8 5T10@200

INF-F01
100100

AUTOMATIC RISING BOLLARD (J275 2K20)


321.700 321.150 FOUNDATION TYPE 5 RC. DETAILS
100 2400 100 F.F.L T.O.S

Designed Checked Approved


BLINDING SECTIONC-C AHMED ABDELWAHAB DUAN XINGCHAO WU GUANGJUN
SECTIONC-C REINFORCEMENTDETAILS
CONCRETEDIMENSIONDETAILS PODIUM SLAB (SCALE=12:5) Drawn Date Scale
(SCALE=12:5)
AHMED ABDELWAHAB 18 FEB 2023 AS SHOWN

SHDCSCEC 18 F01 ST SC 01 EX 05 0010 0000 00


Packa. Build. Sub Elemt. Floor Part Sheet Sequnc. Rev.
Type Contractor Discp.
5 4 3 2 1 No. Type Discp. Type Level No. No. No. No.

You might also like