JSA (Job Safety Analysis) Sheet

Activity Name:- Mobile Tower Crane Operation and


Maintenance Ref-

Location:- Date :

Sr.N
Sub-Activity Name Type Of Hazard Risk(s) Involved Risk Control measures
o.
Untrained Only inducted worker shall be deputed at the work place.
Manpower
1 worker,lack of skill Personal injury
Mobilization Given Tool Box Talk to all workers.
awareness
Tower crane should be Third party inspected and having valid Form no.
12.Only trained and licences holder person should be deployed the
Pre inspection Negligence of Personal injury,
2 operation.
before operation operator Property damage
Daily check the crane as per standard checklist before start of the activity.

For proper lifting & shifting of material proper communication equipment


Lifting & Shifting Uninspected lifting
should be Provide (mobile,walky-talky) for proper communication.
of material media,inproper
Personal injury,
3 (e.g.steel,shutteri shifting of Wire rope & D-shackle should be having valid test certificate.
Property damage
ng ply/plate,brick material, Improper Horn &
etc.) communication Light of the crane should be in working condition.

Only Trained Person should be Deployed for work.


Personal injury,
Unskilled Worker LOCK-OUT-TAG-OUT (LO-TO) before start of the maintenance.
Property damage
Work area should be barricaded to avoid unauthorised entry.
4 Maintenance Work Hand tools should be inspected for any damage before they use & kept in
proper toolkit.
Faulty hand tools Personal injury Work shall be carried out under supervision.
No work and worker should be deployed near weighbridge.
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall of Ensure proper illumination during dark hours.
Work during dark Personal injury,
5 person, fall of
hours damage to property Electrical cable should lead min 2 m height. No exposed electrical wire.Earthing.
machinery
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :________ Name & Signature of Site In-charge :___________

Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______