200 x 150 x 19 mm
Anti Vibration Pads
Concrete Footing
NOTE:
150 mm
SINCE THE CAST-IN-PLACE ANCHOR
BOLTS WITH ITS CONCRETE BLOCK
FOOTINGS ARE PRE-INSTALLED INTO THE
FLOORING BEFORE THE MOUNTING OF THE
HAMMER MILL, IT IS DESIGNED AND
CAREFULLY PLACED IN ACCORDANCE TO
THE FINAL LAYOUT OF THE FLOOR PLAN.
EQUIPMENT SCHEDULE
1,750 mm BRAND
MODEL
CAPACITY FOR MICRO CHIPS 3x50 mm
PROMILL STOLZ
BNA 100
2-4
(TPD)
POWER (HP) 335-670
DIAMETER (mm) 2
AIR VOLUME (m^3/hr) 18,000-24,000
200 mm ROTOR WIDTH (mm)
ROTOR DIAMETER (mm)
1000
1384
SCREEN SURFACE (m^2) 3
NUMBER OF SCREEN 4.0000
NUMBER OF HAMMERS 64-256
WEIGHT OF HAMMERS (kg) 1.95
LENGTH (mm)
150 mm WIDTH (mm)
2500.0000
3060.0000
HEIGHT (mm) 2145.0000
NOTE:
SINCE THE HAMMER MILL HAS 6 MOUNTNG
M HAMMER MILL FLOOR MOUNTING
POINTS, ITS FLOOR MOUNTING USES 6 CAST-IN-PLACE
ANCHOR BOLTS PAIRED BY ITS RESPECTIVE NUTS AND
FLATWASHERS.
PROJECT LEADER INSTRUCTOR PROJECT / LOCATION: GROUP MEMBER PREPARED BY: No. REVISIONS DATE
STATE U JOHN PATRICK S. CAMO SHEET CONTENT SET NO. SHEET NO.
BatStateU
S
JAMAICA HERNANDEZ
NI
TANGA
VE
JOHN PATRICK S. CAMO PROPOSED DESIGN OF A 30 TPD HARRIS CORPUZ HAMMER MILL FLOOR MOUNTING
M
RSITY
U
rs ty
T he
VI R
Alangilan, Batangas City
T
CE VI
1
E X C E90 3 PROFESSIONAL MECHANICAL ENGINEER
L L E N CE SECTION: ME - 4202 KOJI BRIAN REYES
Na
ive
PH
ona n
I L IP NES MECHANICAL ENGINEERING
ti
PI GROUP NO: 07
l E ng gU
i nee rin DEPARTMENT DATE SUB:
BRGY. DAGATAN, TAYSAN, BATANGAS