List of Names 2 roll metal flexible 1/2,

Person(s)- in - Charge 1 roll meca tube 3/8,


Jesus Balogo 7box wire 3.5mm,
Adan Paguio 10 roll electrical tape,
Amandito Paguio 15 pcs utility box
Angelo Almario 30 pcs straight connector 1/2,
Christian Paguio 60 pcs locknut & bushing 1/2,
Dante Musa 20 pcs full trade round bar 3/8,
Jay-Ar Baradia 50pcs anchor bolt 3/8,
Jeffrey Domo 1 unit rotary drill bosch
Joel Aromin
Jonny Domo PVC Elbow#2x45 5pcs
Joven Ebrada PVC Wye#2x2 2pcs
Leandro Balogo PVC Elbow#2x45 45pcs
Leo Gueriva PVC Pipe#3 7pcs
Leo Gueriva Jr. PVC Elbow#2x90 25pcs
Lester Cadag PVC Pipe#2 5pcs
Loreto Longasa Jr. PPR Pipe#25mm 10pcs
Mark Kevin Saguid PPR Reducer#32mmx25mm 10pcs
Marlon Molit PPR Coopling#25mm 10pcs
Marvin Molit PPR Pipe#32mm 7pcs
Michael Leop
Randy Salazar Scope of Works
Reymark Pelobilo Phase 1 - 2 - 3
Jerry Palentinos Mobilization
Roy Clydee Gavilaga 3/4 Thk. Canopy flyboard board @ cashier area,
Drop Ceiling dismantling and Installation
List of Materials Painting of Ceiling in urban black
Tools and Materials Phase A
CHB 4" 385 bags CHB Wall Partition for Toilet and Pantry including
Bistay 60 bags Supply and roughing installation of stub out
Cement 20 bags Moisture resistant board on light metal frame
RSB 10mm dia 20pcs @Toilet and Pantry
Tubular size 2x2 1.5thk 10pcs Wall preparation including chemical treatment
Electrical tape 5 pcs to receive tile finish at Toilet
Polytop 1 galon Waterproofing and Testing
Spot putty Installation of 20 x 20cm ceramic wall tiles - full
Ponching compond 5 kilo height and General Tile setting of OSM Tiles 60 x
Laquer thinner ordinary 2 galon 60 cm
Sand paper Drywall studwall partitioning to backoffice. 6mm
#36 Half meter (3m) ficem board from FFL to slab soffit.
#100 1 1/2 meter (3m) General wall area to be painted before
#240 20pcs (crocodile) installation of backwall and display is required.
#150 20pcs Backoffice wall area to be painted
#400 20pcs Back of House ceiling to be re-painted
Primer surface 4 gallon False Columns to be painted and slatted wall
Baby roler 8pcs Re-installation of Doors (Re-use existing doors
Paint brush 1/2 6pcs from GF office including dismantling) including
Bashan 10kilo re-painting to white
Flat latex white 1 balde Cut openings for light fittings
Semi gloss flat latex 1 balde Supply and roughing installation for Power
Automotive laquer white 4 galon Provisions
Water white laquer 2 galon Supply and roughing installation of Electrical
Laquer flo 2 galon lightings
Dead flat 2 galon Installation of OSM lighting fixtures
Roller #7 3pcs Phase 4
Topcoat (urban black) 3 gallon Re-painting and Installation of fine writing
Anchor Grip 3/8 50pcs counters including ceiling and affected
Nut 50pcs perimeter tiles
Washer 50pcs Re-painting and Installation of racks including
Full thread 3/8 20pcs ceiling and affected perimeter tiles
Installation of Wall Racks
30 pcs imc pipe 1/2, Cut openings for light fittings
40 pcs metal junction box w/ cover,
Installation of tiles at affected areas due to Another Request
dismantled wall racks A witness from the mall for certification of Fire
Phase 5 Retardant if needed.
3/4 thk. Canopy flyboard board @ cashier area,
Drop Ceiling dismantling and Installation
Painting of Ceiling in urban black
Phase B
Paint and repair of Ceiling
Cut openings for light fittings
Installation of Wall Racks
Installation of tiles at affected areas due to
dismantled wall racks
Paint and repair of Ceiling at ACP front
Phase 6
Installation of tiles for stairs area including
Preparing floor slab to receive self leveling
screed prior to installation of floor tiles.
Installation of tiles for escalator area including
Preparing floor slab to receive self-levelling
screed prior to installation of floor tiles.
MEPS
Supply and roughing installation for Data line for
additional
Supply and roughing installation of Sound
System
Supply and roughing installation of FDAS for
Additional Smoke detectors
Relocation of CCTV (14 units) @2nd floor
Relocation of sprinkler heads at BOH and Storage
area
Supply and installation of additional smoke
detectors
Relocation of the diffuser at BOH and Storage
area only
Supply and installation of additional exhaust fan
at BOH
Phase 7
Paint and repair affected areas
Hauling, Disposal of excess materials

For Hotworks Permit


Hotworks
Welding, brazing, and soldering of steel bars for
framing and support system
The use of open flames, blow-lamps, and torches
for bitumen and Waterproofing
The use of hot air blowers and lead heaters for
bending pvc pipes

Work Period, Date, and Time


Number of days required for the works:
In a total of 30 days
working period starting
May 02, 2023 until
June 01, 2023

Time:
9:00 pm to 9:00 am

Type of Merchant:
Constructing