Technical Report

CENTRAL NRW MANAGEMENT DIVISION | PLANNING AND SUPPORT

Business Area: WEST CAVITE


Contract No.: NR-23-SDS-WCV-01
Project Title: Proposed 2023 Partial Pipe Replacement in HS Noveleta at 27-CLP03H (Camia) in
Noveleta, Cavite, under West Cavite BA

I. BACKGROUND

The District Metered Area (“DMA”) 27-CLP03H, or “Camia”, in Brgy. San Rafael III, Noveleta, Cavite, under
West Cavite BA, was established in February 2012. It has an average pressure of 10 psi under the influence
of the PAGCOR PS water supply system.

The proposal aims to supplement the pipe replacement project implemented in 2011 under the 3R-11-CL-
HA27-Z03-01 contract. Figure 1 shows the photographic map of DMA 27-CLP03H based on Google Maps.

Figure 1
27-CLP03H (Camia) DMA as shown from Google Map

08002002

Contract 3R-11-CL-HA27-Z03-01,
implemented in 2011.

08002010

The average volume of non-revenue water in the area beginning January to December 2022 was 0.90 MLD.
Figure 2 shows the monthly NRW volume of 27-CLP03H from January to December 2022.

Page 1 of 6
Technical Report
CENTRAL NRW MANAGEMENT DIVISION | PLANNING AND SUPPORT

Figure 2
27-CLP03H NRW Volume and Percentage from January to December 2022

27-CLP03H NRW LEVEL


80.00% 1.80

70.00% 1.60
1.40
60.00%
1.20

NRW Volume, MLD


50.00%
1.00
NRW %

40.00%
0.80
30.00%
0.60
20.00% 0.40
10.00% 0.20

0.00% 0.00
Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22

In addition, there were 24 underground leaks and 20 surfacing leaks repaired from April to December 2022,
based on the CXRO’s CMMS data.

II. OBJECTIVE

The project aims to reduce the Non-Revenue Water volume in HS Noveleta by 0.43 MLD and to replace the
old and deteriorated Polyvinylchloride (“PVC”) pipes within the network.

III. PRESENT CONDITION

27-CLP03H had a 0.43 MLD non-revenue water volume on February 2023. It has a total water supply of 1.27
MLD and has accounted for a billed volume of 0.84 MLD. It covers 1,214 water service connections with 24-
hour availability and averages 10.32 psi at the critical point.

STEP TEST
The result of the step testing demonstrates that the highest flow drops are found in San Rafael III and IV,
which account for 6.2 and 6.5 liters per second of the DMA's high NRW volume. Figure 3 shows the step-test
result in April 2022.

Figure 3
Page 2 of 6
Technical Report
CENTRAL NRW MANAGEMENT DIVISION | PLANNING AND SUPPORT

27-CLP03H Step Test Result as of April 2022

WATER BALANCE

The water balance report shows that physical losses are more susceptible than commercial losses. Refer to
Figure 4 for the 27-CLP03H Water Balance Result.

Figure 4
27-CLP03H Water Balance Result

Billed Consumption
825 m3/day Commercial Losses
Authorised
Consumption

825 m3/day Unbilled


Consumption
m3/day
Zone Inflow
Billed
Consumption Non-Revenue Water
1,586 m3/day Commercial Non-Revenue Physical Losses
Losses Water
68 m3/day
761 m3/day
Water Losses

761 m3/day
Physical Losses
693 m3/day

LEAK TAGGING
According to the GIS Leak Tags, the proposed pipe replacement segments had the most leak occurrences, as
illustrated in Figure 5.

Figure 5
Page 3 of 6
Technical Report
CENTRAL NRW MANAGEMENT DIVISION | PLANNING AND SUPPORT

27-CLP03H Leak Tags

IV. SCOPE OF WORK

Figure 6 below shows the proposed pipe sizes from the Water Supply Operations Division hydraulic
simulation. The proposed pipe sizes that will provide the optimum service level to the entire DMA are 75
mm, 100 mm and 150 mm in diameter. Table 1 shows the pipe sizes and alignment details based on the
result of the hydraulic simulation.

Figure 6
27-CLP03H Proposed Schematic Diagram

Table 1
Page 4 of 6
Technical Report
CENTRAL NRW MANAGEMENT DIVISION | PLANNING AND SUPPORT

Pipe Sizes and Alignment Details

STREET NAME PROPOSED PIPE

ITEM
SIZE LENGTH ENCASEMENT
NO.
ALONG FROM TO MATERIAL
(mm) (m) (Y/N)

20 Camia St. Camia St. Camia St. PVC 150 ± 7 N


21 Camia St. Equalizer Camia St. Camia St. PVC 150 ± 5 N
TOTAL (150mmØ) ± 12

1 Manila-Cavite Road Librado A. Reyes Ave. End PVC 100 ± 823 N


6 Camia St. Manila-Cavite Road Aquino Cmpd PVC 100 ± 120 N
11 Manila-Cavite Road Librado A. Reyes Ave. End PVC 100 ± 680 N
18 Manila-Cavite Road Equalizer Manila-Cavite Road Manila-Cavite Road PVC 100 ± 6 N
Manila-Cavite Road Existing
19 Manila-Cavite Road Existing Fire Hydrant PVC 100 2 N
Fire Hydrant ±
TOTAL (100mmØ) ± 1631

2 Viva Mabuhay Manila-Cavite Road End PVC 75 ± 102 N


3 Aquino Cmpd Manila-Cavite Road End PVC 75 ± 286 N
4 Unnamed Loop Aquino Cmpd Aquino Cmpd PVC 75 ± 251 N
5 Camia St. Aquino Cmpd Alley 3 PVC 75 ± 75 N
7 Alley 1 Camia St. Alley 2 PVC 75 ± 97 N
8 Alley 2 Alley 1 Alley 3 PVC 75 ± 71 N
9 Alley 3 Alley 2 Camia St. PVC 75 ± 108 N
10 Pasco Cmpd Camia St. End PVC 75 ± 32 N
12 Manila-Cavite Road Manila-Cavite Road Prop. VMB47 PVC 75 ± 5 Y
13 Viva Mabuhay Viva Mabuhay Prop. VMB15 PVC 75 ± 2 Y
14 Unnamed St. Unnamed St. Prop. VMB17 PVC 75 ± 2 Y
15 Alley B Manila-Cavite Road Prop. VMB9 PVC 75 ± 14 Y
16 Alley A Manila-Cavite Road Prop. VMB12 PVC 75 ± 5 Y
17 Viva Mabuhay Manila-Cavite Road Viva Mabuhay PVC 75 ± 3 N
TOTAL (75mmØ) ± 1053

GRAND TOTAL ± 2696

V. PROJECT COST ESTIMATE

The project has a total cost estimate of Php 44.29 Million. The target construction period is 180 calendar
days, including permitting upon issuing the Notice to Proceed.

VI. PROJECTED RESULTS


Page 5 of 6
Technical Report
CENTRAL NRW MANAGEMENT DIVISION | PLANNING AND SUPPORT

The proposed project aims to deliver the projected data specified in Table 2. However, the project acceptance
should not assume equal performance levels upon completion. Henceforth, a 5% permissible tolerance will be
applied in the projected volume or pressure.

Table 2
Project Deliverables

Based Data Projected Data Variance


Data as of Feb-2023 Upon completion
Pressure at CP during Peak hours 10 psi 11 psi 1
Water Availability 15 hours 24 hours 9
WSC 1,214 1,155 -59
CMD 0.69 0.71 0.02
BV, MLD 0.84 0.83 0.01
NRW, MLD 0.43 0.20 0.23
NRW % 34% 19% 15%
Recoverable Volume, MLd 0.43
Note: Decrease of 59 water service connections due to closing of delinquent accounts.

Prepared by:

MARY ANGELI S. ARCILLA


Planning Engineer
CNRW Planning and Support

Reviewed by:

RAYMOND G. MONTES JOY MARIE C. ARCE


Head, SDS NRW Reduction Program-South Head, CNRW Planning and Support
CNRW Planning and Support

Conformed by:

ANNA BELEN G. HERRERA SHERWIN D. MENDOZA


Head, WSO Supply and Pressure Management Head, CNRW NRW Services

MA. RONA LIBRELLA


Head, West Cavite BA