The document outlines various check points that should be completed before and after commissioning a solar power system. Before commissioning, the single line diagrams, component datasheets, and inspection details should be checked. After commissioning, outputs like string voltages, currents, temperatures and power levels will be monitored and recorded.
The document outlines various check points that should be completed before and after commissioning a solar power system. Before commissioning, the single line diagrams, component datasheets, and inspection details should be checked. After commissioning, outputs like string voltages, currents, temperatures and power levels will be monitored and recorded.
The document outlines various check points that should be completed before and after commissioning a solar power system. Before commissioning, the single line diagrams, component datasheets, and inspection details should be checked. After commissioning, outputs like string voltages, currents, temperatures and power levels will be monitored and recorded.
2 Solar strings to inverters single line diagram 3 Inverter to LV panel connection diagram Before Testing Check steps
Before commissioning Check steps
Sr, Check points Comments
1 PV module Datasheet 2 Inverter Datasheet 3 LV panel inspection details in document 4 AC cable IR test results 5 DC cable IR test results 6 Earthing, grounding results 7 Earthing loops of PV points 8 Earthing loops of inverter points 9 String polarity test
After commissioning Check steps
Sr, Check points Comments
1 PV String voltage Vmp 2 PV string voltage Isc 3 PV module voltage temperatures sample modules 4 Inverter Output current per phase 5 Inverter peak time temperatures 6 Inverter output power at peak irradiation