Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

API 17J, B, K, L1, L2

Flexible Pipe Standardization


API C2 / SC17: 2019 Summer Status Report. New Orleans.

Reporting Chair
Krassy Doynov, Ph.D., ExxonMobil Upstream Integrated Solutions Company
Scope of Work and Status
STANDARD NAME PUBLISHED STATUS

API RP 17B 2-May-2014 5th edition


Recommended practice for flexible pipe
ISO 13628-11 19-Sep-2006 HOLD
Specification for Unbonded Flexible Pipe API Spec 17J 2-May-2014 4th edition

API Spec 17K 29-Aug-2017 3rd edition


Specification for Bonded Flexible Pipe
ISO 13628-10 1-Oct-2005 HOLD
Specification for flexible pipe ancillary API Spec 17L1 5-March-2013 Revision in 2019
equipment ISO 13628-16 N/A HOLD

Recommended practice for flexible pipe API RP 17L2 5-March-2013 Revision in 2019
ancillary equipment ISO 13628-17 N/A HOLD

The Ageing of PA-11 in Flexible Pipes API 17TR2 1-Jun-2003 to be updated 2020
API 17L1, L2 (ISO 13628-16,17 – on hold)
• Revision of API 17L1 and L2 kicked off on Feb-8, 2018
• Task Group – 30 companies, 72 SMEs from EU and US
• Collected Industry lessons learned since 2013: 246 technical comments +
225 API Monogram comments
• Resolved (98%) of technical comments and ~(50%) of API Monogram
comments in 4 F2F TG meetings:
• 1st meeting in Houston on Oct 23rd and 24th 2018
• 2nd meeting in Galway, Ireland on Dec 4th and 5th 2018
• 3rd meeting in Houston on Mar 5th and 6th 2019
• 4th meeting in Paris, France on May 22nd and 23rd 2019
• Anticipate: 2 teleconferences, API Ballot in Aug-Sep, 1-2 teleconferences to
address ballot comments. Publish by YE 2019
MEMBERSHIP: API 17L Task Group
38Tricia Hill tricia.hill@matrixengineered.com
1Vishnu Karthik Vijayaraghavan 1 Aker Solutions Vishnu.Karthik.Vijayaraghavan@akersolutions.com Matrix Composites &
39Simon Brayshow 17 simon.brayshaw@matrixengineered.com
Engineering
2David Hickman david.hickman@akersolutions.com
40Sam Guo sam.guo@matrixengineered.com
3Aneel Gill Aneel.Gill@balmoral.co.uk
41Thomsen, Jens Rordam JensRordam.Thomsen@nov.com
4Gregg Stewart Gregg.Stewart@balmoral.co.uk 18 NOV Flexibles
2 Balmoral 42Erik Bendiksen Erik.Bendiksen@nov.com
5Craig Sharp Craig.Sharp@balmoral.co.uk
43Wesley J. Cort III wcort@oceaneering.com
6Fraser Milne Fraser.Milne@balmoral.co.uk 19 Oceaneering
44Mimi Batrony mbatrony@oceaneering.com
7Andy Roberts andy.roberts2@bhge.com
8Richard Carverhill 3 BHGE Wellstream richard.carverhill@bhge.com
45Trond Sundby trond-e.sundby@ptil.no
20 Petroleum Safety Authority
9Zhimin Tan zhimin.tan@bhge.com 46Morten Langoy Kjell-A.Anfinsen@ptil.no
10Yan Zhou yan.zhou@bp.com 47 Alok Dhagat 21 Prime Natural Resources alok.dhagat@primenri.com
11Faycal Ferdi 4 BP faycal.ferdi@bp.com
48Jørgen Eide 22 Point Resources AS jorgen.eide@pointresources.no
12Reji Eason Reji.Eason@bp.com
13Aymeric David aymeric.david@bureauveritas.com 49Pierre-Andre Bonnet Pierre-Andre.Bonnet@sbmoffshore.com
23 SBM Offshore
14Matthew Baert Mattew.Baert@bureauveritas.com 50Benjamin Biausser Benjamin.Biausser@sbmoffshore.com
15Anne-Laure Gaigneux 5 Bureau Veritas Marine & Offshore anne-laure.gaigneux@bureauveritas.com 51John Rosche John.Rosche@shell.com
24 Shell
16Paul-Etienne Teillauchet paul-etienne.teillauchet@bureauveritas.com 52John Melville John.Melville@shell.com
17François Migeon francois.migeon@bureauveritas.com 53Rafik Boubenider 25 Stress Engineering Rafik.Boubenider@stress.com
18Parsinejad, Farzan
6 Chevron
Farzan.Parsinejad@chevron.com 54Didier Hanonge didier.hanonge@technipfmc.com
19Helena Miao HMiao@chevron.com 55Alan Dobson alan.dobson@technipfmc.com
20Rex Song Conoco Phillips Rex.Song@conocophillips.com 26 Technip FMC
56James Terris james.terris@technipfmc.com
21Mayuresh Dhaigude Mayuresh.Dhaigude@dnvgl.com 57Guillaume Micas guillaume.micas@technipfmc.com
7 DNV GL
22Jorge Suarez Jorge.A.Suarez@dnvgl.com 58Sylvain Routeau sylvain.routeau@technipfmc.com
23Jian Zhao 8 ENI Jian.Zhao@eni.com
59Tom Perry tom.perry@trelleborg.com
24Kristin Nedrelid krine@equinor.com
9 Equinor 60Steven Bray steven.bray@trelleborg.com
25Thomas Sola tholar@equinor.com
61Ben Osullivan ben.osullivan@trelleborg.com
26Don Johnson 10 ETA dwjohnson@etainc.org 27 Trelleborg
62Kipp Carlisle kipp.carlisle@trelleborg.com
27Krassy Doynov krassimir.doynov@exxonmobil.com
11 ExxonMobil Production 63Malcolm Page malcolm.page@trelleborg.com
28Greg Ruschau greg.r.ruschau@exxonmobil.com
64Collin Gaskill collin.gaskill@trelleborg.com
29Mark Kalman mark.kalman@flexsteelpipe.com
12 FlexSteel Pipeline Technologies 65Jean-Philippe Roques jean-philippe.roques@total.com
30Nader Matari nader.matari@flexsteelpipe.com 28 TOTAL
66Dennis Melot denis.melot@total.com
31Abdulgani Oseni Abdulgani.Oseni@hse.gov.uk
13 HSE
32Fred Williams Fred.Williams@hse.gov.uk 67Adrian Connaire adrian.connaire@woodplc.com

33Rune Haakonsen 14 Kongsberg Rune.Haakonsen@kongsberg.com 68Patrick Dooley patrick.dooley@woodplc.com


69Eoin Burke 29 WOOD Eoin.burke@woodplc.com
34Karst Meijer KMeijer@lankhorst-ep.nl
15 Lankhorst Engineered Products
35Stephen Robinson sr@lankhorst-offshore.com 70Brian O’Keeffe Brian.okeeffe@woodplc.com
36Joao Falcao Alegrias Joao.FalcaoAlegrias@lr.org 71Ian Macleod ian.macleod@woodplc.com
16 Lloyd's Register
37Sushil Chandra Sushil.Chandra@lr.org 72Ed Baniake 30 API baniake@api.org
17J & 17K Response to API Monogram push to
technical Audit Template and Yearly Audits
The 17J and 17K communities:
• See the Monogram Program value in sticking to the quality/QMS
checks,
• Think API Auditors should have some basic working knowledge of
flexible pipe manufacturing in order to be capable of moving to a
more technical Audit Template,
• Seem already used to yearly Audit frequency, and
• Think it is fair to include the Q1 fee into the 17K fee / 17J fee.
API 17J & 17B
(ISO 13628-2 &11 – on hold)

• 2 SRRR submitted on 12/10/2018 for reaffirmation or starting a


revision in 2019 for API 17 J and 17B
• Polled the Industry in 2Q2019, which voted for a revision, not re-
affirmation
• Plan is to collect Industry proposals and assemble a Task Group in
2H2019, and kick-off the revision in 1Q2020 - following publishing of
API 17L1 & 17L2 second editions

NOTE: 17B is the RP supporting both the 17J Spec and 17K Spec
API 17K
(ISO 13628-2 &11 – on hold)

NOTHING TO REPORT for 1H2019


UPDATED TARGET DATES FOR NWI AND
DELIVERABLES
• API 17 L1&L2
• Expected completion 3Q2019;
• Expected ballot Aug-Sep 2019;
• Expected publishing by YE 2019

• API Spec 17J and API RP 17B


• Assemble Task Group, and collect comments by YE 2019
• Kick-off revision in 1Q2020
• API 17TR2
• Expect to submit SRRR form, after 17TR2 JIP completion in 2020
FUTURE MEETINGS & RESOURCE NEEDS

PLANS FOR FUTURE API 17L TASK GROUP MEETINGS


• 1-2 Teleconferences - Summer 2019
• API Balloting – Aug-Sep 2019
• 1-2 Teleconferences in 4Q2019 to resolve ballot comments and publish new
second editions

RESOURCE NEEDS
• Editorial help with API 17L1 and L2 revision drafts for balloting and for publishing
the second editions

You might also like