NEW Meeting On The Design Optimization and Modification 12th Oct 2022.edited (E.P)
NEW Meeting On The Design Optimization and Modification 12th Oct 2022.edited (E.P)
NEW Meeting On The Design Optimization and Modification 12th Oct 2022.edited (E.P)
Year
Progressive
Rev. Sheet
No
Reference
No. FIRS MM 23 00 1/3
CONSTRUCTION OF NEW OFFICE AND PARKING LOTS AT 17B AWOLOWO ROAD, IKOYI,
LAGOS FOR FIRS
MINUTES OF THE MEETING ON THE DESIGN OPTIMIZATION AND MODIFICATION
ATTENDANCE LIST:
Federal Inland Revenue Service:
1 Hassan Abubakar FIRS elhassan.abubakar@firs.gov.ng 08037041325
2 Abubakar Adamu FIRS girei.adamu@firs.gov.ng 08036903718
3 Abdulkadir Abbas FIRS abdul-kadir.abbas@firs.gov.ng 08035868183
4 Aminu Shuaibu FIRS aminu.shuaibu@firs.gov.ng 08061601680
China Civil Engineering Construction Company (LIRP):
1 Mi Binbin CCECC mibinbin@ccecc.com.cn 07045320455
2 Guyu Qi CCECC olsq169@126.com 09015554982
3 Huang Fangmiao CCECC hungfangmiao@163.com 08061112586
4 Mar CCECC ccecc.firsoffice@163.com 09153096975
5 Francisca Asuquo CCECC get2franodion@yahoo.com 08036195440
1.0 INTRODUCTION
The meeting commenced at 10:30am with the Director FIRS welcoming
all parties to the meeting.
FIRS stated that there are consultants on the project and subsequently,
they will be involved in future interactions.
FIRS further reiterated that the project is a turnkey project since CCECC
produced the design and expected to implement the construction of the
building and car park.
3.0 DISCUSSION
Project Project Subject Source Document Type. Year
Progressive
Rev. Sheet
No
Reference
No. FIRS MM 23 00 2/3
A CONSTRUCTION BOUNDARY
CCECC stated that the construction boundary limit in the original layout
extends beyond provided Right of Way, therefore the design modification
was carried out to address this situation by shifting the building layout in
such a way that it is within the approved Right of Way.
B Due to the shifting of the building to ensure that it is within the proposed FIRS to forward
boundary, the water supply house has to be relocated to the back of the the Chapel design
existing FIRS Building because there is enough space. to CCECC
FIRS stated that the space proposed by CCECC for the new location of
the water supply house is where they intend to cite the Chapel. However,
FIRS promised to make available the chapel design to CCECC to see if
space can be fashioned out to accommodate the water supply house.
C BUILDING FACADE
The façade of the building is covered with a glass curtain wall with no
space or allowance for the installation of air conditioning components.
The building façade of the optimized design was made of louvres to
ensure adequate allowance the installation of the air conditioner
components.
The façade of the parking space which was enclosed with glass curtain
walls and windows was modified to open space to allow free ventilation
in the optimized drawing and also result in saving costs.
SHOW-STOPPERS
G CCECC presented the list of show-stoppers that need to be removed or
relocated from their existing positions to ensure the smooth
implementation of the project.
The parked vehicles are to be evacuated to another location so that we
can start construction work. FIRS stated that it is the responsibility of CCECC to forward
CCECC to source for a place as it is cost implication is contained in the the original and
bill. optimized design
Other show-stoppers such as trees, wash hand basin, street lights, to FIRS
generating set and cabin portal were also mentioned.
FIRS requested for soft copies of the drawings of both old and new, and
CCECC promised to send the drawings via mail.
CCECC stated that the split unit air conditioning is preferred over the
central air conditioning unit because of ease of maintenance.
CCECC requested for further requirements of FIRS so as to incorporate
them in the optimized drawing