alvarez.lopezeugenio@gmail.com PHONE:
EXTEND COVERED TERRACE ROOFING (10 CMS), INCLUDES CARRIAGE OF MATERIAL, TOOL,
2 LOT 1.00 $2,819.67 $2,819.67
EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION
BATHROOM BASEMENT. VANITY (EXISTING) REFINISH, REUSE CARPENTRY, NEW HARDWARE AND
3 LOT 1.00 $544.67 $544.67
SLIDES, NEW BLACK MATTE PULLS
DEMOLITIONS $28,361.76
MASTER BEDROOM 1. RAIN DRAIN FOR ALUMINUM SLIDING DOOR,INCLUDES CARRIAGE OF
5 MATERIAL, TOOL, EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT ML 15.69 $63.48 $996.00
INSTALLATION
DINNING. RAIN DRAIN FOR ALUMINUM SLIDING DOOR,INCLUDES CARRIAGE OF MATERIAL, TOOL,
12 ML 13.51 $62.50 $844.38
EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION
BAR. STEPS DEMOLITION ON LIVING ROOM AND RELOCATION OF STEPS, SQUARED LAYOUT,
14 INCLUDES CARRIAGE OF MATERIAL, TOOL, EQUIPMENT, CLEANING, LABOR AND EVERYTHING LOT 1 $385.00 $385.00
NECESSARY FOR ITS CORRECT INSTALLATION, NOT INCLUDED MATERIAL COST
LIVING ROOM. MANUFACTURING OF STEPS BETWEEN LIVING AND BAR, INCLUDES CARRIAGE OF
15 LOT 1 $320.00 $320.00
MATERIAL, TOOL, EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY
OFFICE. FLOOR DEMOLITION OF THE SLIDER DOOR. INCLUDES CARRIAGE OF MATERIAL PRODUCT OF
18 M2 63.19 $62.50 $3,949.38
DEMOLITION TO COLLECTION STATION, NO MATERIAL RECOVERY
LAUNDRY. CEILING REMOVAL, INCLUDES CARRIAGE OF MATERIAL PRODUCT OF DEMOLITION TO
19 M2 4.59 $42.00 $192.78
COLLECTION STATION, NO MATERIAL RECOVERY
GYM. DEMOLITION OF STEPS IN GYM ENTRY AND REWORK THE FLOOR , INCLUDES CARRIAGE OF
20 MATERIAL, TOOL, EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT LOT 1 $985.00 $985.00
INSTALLATION
GYM ENTRY. RAIN DRAIN FOR ALUMINUM SLIDING DOOR,INCLUDES CARRIAGE OF MATERIAL, TOOL,
21 ML 4.5 $62.50 $281.25
EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION
SPA GYM. DEMOLITION OF TILE ON WALLS, INCLUDES CARRIAGE OF MATERIAL, TOOL, EQUIPMENT,
22 M2 7.03 $62.50 $439.38
CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT INSTALLATION
GUEST ROOM 3. DOOR REMOVAL FOR RELOCATION, WALL DEMOLITION TO CENTER DOOR, DOOR
INSTALLATION AND FINISHING OF NOZZLES AND PAINTING, INCLUDES CARRIAGE OF MATERIAL,
23 LOT 1 $1,360.00 $1,360.00
TOOL, EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS CORRECT
INSTALLATION
GUEST ROOM 3. DEMOLITION OF SHELL SHAPED HEADBOARD AND FAKE WALL, INCLUDES CARRIAGE
24 OF MATERIAL, TOOL, EQUIPMENT, CLEANING, LABOR AND EVERYTHING NECESSARY FOR ITS LOT 1 $639.56 $639.56