Take off sheet

Project:- Residence (G+2)


Location
Client
Consultant
T D S Description

A.SUB STRUCTURE
1.Excavation and Earth work
1.1 site clearance to depth of 20cm
1 25.2
19.85
500.22 m2
1.2 Bulk excavation(for 50cm depth)
1 24.2
18.85
0.5 228.09 m3
1.3 Pit excavation for
12 2.7 F1-C1
2.7
2 174.96 m3
4 2.5 F2-C2
2.5
1.9 47.5 m3
8 2.2 F3-C3
2.2
1.9 73.568 m3
2 2 F4-C4
2
1.9 15.2 m3
311.23 m3 Total pit excavaion
1.4 Trench excavation
1 21.7 Along axis A-F/4
1
1.4 30.38 m3
2 23.2 Along axis A-F/ b/n 3-2
1
1.4 64.96 m3
1 20.3 Along axis A-F/1
1
1.4 28.42 m3
1 3.611 Along axis C-D/1'
1
1.4 5.0554 m3
1 11.25 Along axis 4-2
1
1.4 15.75 m3
4 16.25 Along axis 4-1/ Bn A,B and E,F
1
1.4 91 m3
2 21.88 Along axis 4-1'/ b/n C and D
1
1.4 61.264 m3
1 6.2
1
1.4 8.68 m3
305.51 m3 Total Volume of Trench excavation
2.CONCRETE WORK
2.1 Lean concrete
2.1.1 lean concrete under footing pad
12 2.2
2.2 58.08 m2 F1
4 2
2 16 m2 F2
8 1.7
1.7 23.12 m2 F3
2 1.5
1.5 4.5 m2 F4
101.7 m2 Total area of footing pad
2.1.2 C25 Concrete for Pad
12 2.2
2.2
0.65 37.752 m3 F1
4 2
2
0.6 9.6 m3 F2
8 1.7
1.7
0.55 12.716 m3 F3
2 1.5
1.5
0.5 2.25 m3 F4
62.318 m3 Total Volume of C25 Concrete for pad
2.1.3 C25 Concrete for foundation column
12 0.25
0.4
0.95 1.14 m3 F1
4 0.2
0.4
0.9 0.288 m3 F2
8 0.2
0.4
0.95 0.608 m3 F3
2 0.25
0.4
1 0.2 m3 F4
2.236 m3 Total Volume of C25 for foundation column
2.2 Ground floor beam(Grade Beam)
Concrete work
1 20.3 Along axis 4/A-F
0.2
0.4 1.624 m3 GFB-4
2 21.2 Along axis 3/A-F and Axis 2/ A-F
0.2
0.4 3.392 m3 GFB-3
1 18.7 Along axis 1/A-F
0.2
0.4 1.496 m3 GFB-2
1 3.2 Along axis 1'/C-D
0.2
0.4 0.256 m3 GFB-1
1 3.2 Along axis 4 /C-D
0.2
0.4 0.256 m3 GFB-5
1 5.8 Along axis F/ 2-3
0.2
0.4 0.464 m3 GFB-6
1 5.8 Along axis A / 2-3
0.2
0.4 0.464 m3 GFB-7
2 15.35 Along axis A/1-4 and Along axis F/1-4
0.2
0.4 2.456 m3 GFB-8
2 15.35 Along axis E/1-4 and Along axis B/1-4
0.2
0.4 2.456 m3 GFB-9
2 23.95 Along axis C and D/ 1'-4
0.2
0.4 3.832 m3 GFB-10
16.696 m3 Total Volume of concrete for Grade Beam
2.3 Ground floor slab concrete
Total area of ground floor slab(m2)
With thickness of 100mm
1 1.4 Along axis 4/C-D
3.2 4.48 m2
1 98.455 98.455 m2 Along axis 4 and 3/A-F
1 125.28 125.28 m 2
Along axis 3 and 2/A-F
1 91.2 91.2 m2 Along axis 2 and 1/A-F
1 11.52 11.52 m2 Along axis 1 and 1'/C-D
330.94 m2 Total area of ground floor slab(m 2)
3. FORM WORK
3.1 Formwork for footing pad
12 8.8
0.65 68.64 m2 F1
4 8
0.6 19.2 m2 F2
8 6.8
0.65 35.36 m2 F3
2 6
0.5 6 m2 F4
129.2 m2 Total area of formwork for footing pad
3.2 Form of for foundation column
12 1.3
1.2 18.72 m2 C1
4 1.3
1.2 6.24 m2 C2
8 1.2
1.2 11.52 m2 C3
4 1.3
1.2 6.24 m2 C3'
2 0.785
1.2 1.884 m2 C4, For circular column
Total area of formwork for
44.604 m 2
for foundation column
3.3 Form of for Grade beam
1 40.6 Along axis 4 /A-F
0.4 16.24 m2
1 42.4 Along axis 3/A-F
0.4 16.96 m2
1 42.4 Along axis 2/A-F
0.4 16.96 m2
1 37.4 Along axis 1/A-F
0.4 14.96 m2
1 23.04 Along axis 1'/C-D
0.4 9.216 m2
74.336 m2 Total area of formwork for Grade beam
4. Hard core
Total area of hard core with 25cm thick
1 4.48
0.25 1.12 m3 Along axis 4/C-D
1 98.455
0.25 24.61375 m3 Along axis 4 and 3/A-F
1 125.28
0.25 31.32 m3 Along axis 3 and 2/A-F
1 91.2
0.25 22.8 m3 Along axis 2 and 1/A-F
1 11.52
0.25 2.88 m3 Along axis 1 and 1'/A-F
82.734 m3 Total Volume of Hard Core
5.Masonary work
5.1 Trench masonary
1 20.3
0.5
1.4 14.21 m3 Along axis 4/A-F
2 21.2
0.5
1.4 29.68 m3 Along axis 3 and 2/A-F
1 18.7
0.5
1.4 13.09 m3 Along axis 1/A-F
1 3.2
0.5
1.4 2.24 m3 Along axis 1'/C-D
1 10.65
0.5
1.4 7.455 m3 Along axis A/4-2
4 15.45
0.5
1.4 43.26 m3 Along axis A,B,E and F/4-1
2 20.45
0.5
1.4 28.63 m3 Along axis C-D/4-1'
1 5.8
0.5
1.4 4.06 m3 Along axis F/4
142.625 m 3
Total Volume of trench masonary
6. Backfill
1 311.228 m3 Detto as pit excavation
1 228.085 m 3
Detto Bulk excavation
1 305.5094 m 3
Detto as trench excavation
Deduction
1 -62.318 m3 Total Volume of conrete for footing pad
1 -2.236 m3
Total Volume of concrete for foundation column
1 -142.625 m3 Total Volume of conrete for masonary work
637.64 m3 Total Volume of Backfill
1.6 Cartaway
1 500.22
0.2 100.044 m3 Detto as site clearance
1 311.228 m3 Detto as pit excavation
1 228.085 m3 Detto Bulk excavation
305.5094 m 3
Detto as trench excavation
Deduction
1 -637.6434 m3 Total Volume of Backfill
307.22 m3 Total Volume of Cartaway
T D S Description

B. SUPER STRUCTURE
1 Concrete Work
1.1 For Columns

12 0.25 C1
0.4
3.4 4.08 m3 Elev(+0.4 - +3.15)sec1-1
12 0.25
0.4
2.8 3.36 m3 Elev(+6.3 - +9.45)sec4-4
4 0.2 C2
0.4
3.4 1.088 m3 Elev(+0.4 - +3.15)sec2-2
4 0.2
0.4
2.8 0.896 m3 Elev(+6.3 - +9.45)sec3-3
6 0.2 C3
0.4
3.4 1.632 m3 Elev(+0.4 - +3.15)sec1-1
6 0.2
0.4
2.8 1.344 m3 Elev(+6.3 - +9.45)sec3-3
2 0.25 C3'
0.4
3.4 0.68 m3 Elev(+0.4 - +3.15)sec1-1
2 0.25
0.4
2.8 0.56 m3 Elev(+6.3 - +9.45)sec4-4
2 0.2
0.4
1.65 0.264 m3 Elev(+9.45 - +11.30)sec3-3
2 0.3925 C4 Circular column
3.4 2.669 m3 Elev(+0.4 - +3.15)sec 5-5
1.2 Floor Beam
Ground Floor Beam
1 0.25 FB1
0.4
20.25 2.025 m3 Along axis 1/A-F
2 0.25 FB2
0.4
23.2 4.64 m3 Along axis 3 and 2/A-F
2 0.25 FB3
0.4
10.25 2.05 m3 Along axis 4/A-C
1 0.25 FB4
0.4
3.6 0.36 m3 Along axis 4 /C-D
1 0.25 FB5
0.4
3.6 0.36 m3 Along axis 5 /C-D
2 0.25 FB6
0.4
16.25 3.25 m3 Along axis A&F/1-4
2 0.25 FB7
0.4
17.625 3.525 m3 Along axis B&E/1-4
2 0.25 FB8
0.4
19.25 3.85 m3 Along axis C&D/1-5
20.06 m3 Total Volume of Beams on Ground floor
1.3 Slab
Second Floor Slab with thickness of 150mm
1 106.7 106.7 m2 Along axis b/n 4&3/A-F
1 127.6 127.6 m2 Along axis 3 and 2/A-F
1 91.2 91.2 m2 Along axis 2 and 1/A-F
1 10.36 10.36 m2 Along axis 1/B-C ,C-D and D-E
1 4.48 4.48 m 2
Along axis 5 /C-D
340.34 m2 Total Area of second floor slab