The bridge designer cost calculations report summarizes the estimated costs for replacing the Dennis H. Mahan Memorial Bridge. Material costs are estimated at $729,192.48 based on the quantity of high-strength steel needed. Connection costs are estimated at $16,800 for joining the steel parts. Additional costs include $1,000 for steel bars, $45,900 for deck panels, $41,000 for arch abutments, and $86,900 for the total site costs. The grand total estimated cost for the bridge project is $833,892.48.
The bridge designer cost calculations report summarizes the estimated costs for replacing the Dennis H. Mahan Memorial Bridge. Material costs are estimated at $729,192.48 based on the quantity of high-strength steel needed. Connection costs are estimated at $16,800 for joining the steel parts. Additional costs include $1,000 for steel bars, $45,900 for deck panels, $41,000 for arch abutments, and $86,900 for the total site costs. The grand total estimated cost for the bridge project is $833,892.48.
The bridge designer cost calculations report summarizes the estimated costs for replacing the Dennis H. Mahan Memorial Bridge. Material costs are estimated at $729,192.48 based on the quantity of high-strength steel needed. Connection costs are estimated at $16,800 for joining the steel parts. Additional costs include $1,000 for steel bars, $45,900 for deck panels, $41,000 for arch abutments, and $86,900 for the total site costs. The grand total estimated cost for the bridge project is $833,892.48.
Material Cost (M) High-Strength Low-Alloy Steel Solid Bar (65106.5 kg) x ($5.60 per kg) x (2 Trusses) = $729,192.48 Connection Cost (C) (21 Joints) x (400.0 per joint) x (2 Trusses) = $16,800.00 Product Cost (P) 39 - 220x220 mm High-Strength Low-Alloy Steel Bar ($1,000.00 per Product) = $1,000.00 Site Cost (S) Deck Cost (9 4-meter panels) x ($5,100.00 per panel) = $45,900.00 Excavation Cost (0 cubic meters) x ($1.00 per cubic meter) = $0.00 Abutment Cost (2 arch abutments) x ($20,500.00 per abutment) = $41,000.00 Pier Cost No pier = $0.00 Cable Anchorage Cost No anchorages = $0.00 Total Cost M+C+P+S $729,192.48 + $16,800.00 + $1,000.00 + $86,900.00 = $833,892.48