Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Criteria and Conditions

Project : Tennis Court Srinarin (Bangkok)

5 February 2023

Design Loads

1. Live Load on Roof/purlin (KN/m2) = 0.3


2. Live Load on Frame/Rafter (KN/m2) = 0.5
3. Wind Load (KN/m2) = 0.5 (10>=H) , 0.8(10<H<=20)
4. Collateral Load (Kg/m2) = 5
5. Dead Load on Roof (Kg/m2) = None
6. Dead Load of Metalsheet (kg/m2) = Bolt type B760 /0.47mm TCT (4.21Kg/m2)
7. Dead Load of Purlin (kg/m2) = optimised
8. Live Load on Mezzanine (Kg/m2) = -
9. Dead load on Mezzanine (Kg/m2) = -
10. Wind Speed (Km/Hr) = 90 @1hr ,137@3second
11. Seismic Load = SDS (0.2s)=0.191, SD1(1.0s)=0.199(Bangkok)
12. Exposure =B
13. Province = Bangkok
14. Overhead Crane load (tons) = No

Design code :

 ASCE 7-16(for wind load, live load ,Dead load, deflection)


 IBC-2006 (for seismic load)
 LRFD ASCE 7-16 (for combination load)

Accessories Condition

1. Purlin spacing max (for roofing) = optimize ( 1.5m max)


2. Girt spacing max (for siding) =optimize ( 1.2m max)
3. Specification of roofing sheet =
4. Roof slope =
5. Roof Ventilator =
6. Column condition = steel column (optimize)
7. Width module (m) = followed customer drawing / column distance can
be optimized
8. Bay spacing (m) = followed customer drawing / column distance can
be optimized
9. Siding Frame (1) = for metalsheet siding cover stainless steel gutter at
grid line A,G (Can be redesigned to optimise
10. Siding Frame (2) = for canvas ( canvas can be lifted up when fully
open air required) at grid line 1 and 7 (End wall) level +6m to +15m
11. Siding Frame (3) = for chain link at level +,- 0.0 to +6m (4 sides)
12. Bracket and Running Beam = none.

Steel work finished condition


1. Welding = Both side welding
2. Shot Blasting = sa2
3. Primer = 50 micron Alkyde
4. Top coat = 50 micron Alkyde
5. Fire proof paint = none

Remarks.

- Bottom of Plate are at +0.0m ( at finished ground floor level , no kicker)

You might also like