The document provides details of the seating arrangement and pile foundation for an auditorium building. It includes a table that lists 5 different pile cap designs, the dimensions of each, the number of piles per cap, and the total volume of concrete required for the pile caps and piles. The largest pile cap design (PC4) is used for 90 piles, with each cap requiring 9.9 cubic meters of concrete and supporting 4 piles each. In total, the pile foundation requires approximately 1650 cubic meters of concrete for the pile caps and 3643 cubic meters for the piles, for a total of over 5290 cubic meters of concrete.
The document provides details of the seating arrangement and pile foundation for an auditorium building. It includes a table that lists 5 different pile cap designs, the dimensions of each, the number of piles per cap, and the total volume of concrete required for the pile caps and piles. The largest pile cap design (PC4) is used for 90 piles, with each cap requiring 9.9 cubic meters of concrete and supporting 4 piles each. In total, the pile foundation requires approximately 1650 cubic meters of concrete for the pile caps and 3643 cubic meters for the piles, for a total of over 5290 cubic meters of concrete.
The document provides details of the seating arrangement and pile foundation for an auditorium building. It includes a table that lists 5 different pile cap designs, the dimensions of each, the number of piles per cap, and the total volume of concrete required for the pile caps and piles. The largest pile cap design (PC4) is used for 90 piles, with each cap requiring 9.9 cubic meters of concrete and supporting 4 piles each. In total, the pile foundation requires approximately 1650 cubic meters of concrete for the pile caps and 3643 cubic meters for the piles, for a total of over 5290 cubic meters of concrete.
1200 SEATING ARRANGEMENT AUDITORIUM AT BURN STANDARD BLDG
PILE CAP + PILES (DIA= 0.6m, LENGTH= 21m)
VOLUME OF EACH TOTAL NO. OF TOTAL SL DESCRIPTION PILE CAP (m3) VOLUME PILES IN NO. OF COLUMN NO. L (m) B (m) H (m) AREA (m2) NO. OF ITEM (m3) EACH PILE PILES CAP 1 PC3 7 PART 1 1 3.00 0.76 1.10 2.28 2.51 C1 to C4, C7 to C9 PART 2 2 1.15 2.00 1.10 2.30 2.54 45.97 3.00 21.00 PART 3 1 0.69 2.00 1.10 1.39 1.52 PART 1+ PART 2+ PART 3= 6.57 C5-C6, C10, C20, C21, C23 to C28, C30 to C36-C37, C38, C39, C41, C42, C44, C45, C46, C48, C49, C50, C52, C53, C54, C56 to C59, C62, C63, C64, C66, C67, C68, C70, 2 PC4 C71, C74, C77, C78, C79, C80 to C86, C91, 90 3.00 3.00 1.10 9.00 9.90 891.00 4.00 360.00 C92, C93, C95, C94-C154, C98, C99-137, C100, C103 to C109, C110 to C113, C114- C155, C115-C156, C116 to C123, C124- C143, C125-C148, C126 to C132 C11 to C14, C17 to C19, C22, C29, C32, C40, C43, C47, C51, C55, C60, C61, C65, 3 PC5 37 3.75 3.75 1.10 14.05 15.45 571.73 5.00 185.00 C69, C72, C73, C75, C76, C87 to C89, C90, C138 to C142, C149 to C153 C15-C16,C96-C101, C97-C102, C144-C145, 4 PC6 6 4.80 3.00 1.10 14.40 15.84 95.04 6.00 36.00 C146-C147, LF2 5 PC12 C133-C136 1 8.40 4.80 1.10 40.32 44.35 44.35 12.00 12.00 TOTAL= 1648.10 TOTAL= 614.00
TOTAL TOTAL VOLUME
VOLUME OF VOLUME OF OF TOTAL VOLUME OF SL TOTAL NO. OF VOLUME OF EACH CONCRETE PER M CONCRETE CONCRETE FOR CONCRETE ( PILE REMARKS NO. PILES PILE (m3) LENGTH FOR FOR PILE CAP CAP + PILE ) (m3) EACH PILE (m3) PILES (m3) 3 (m ) 1 614.00 5.934 0.2828 3643.48 1648.10 5291.58 5.934= (π*0.3*0.3*21) 0.28=(5.934/21)